430 Halsey Street
Brooklyn, NY 11233BBL 3-01664-0026Map
Owner of record: Levitan, David
430 Halsey Street is a walk-up apartment building built in 1910 in Brooklyn, 11233. It has 12 residential units across 3 floors. The owner of record is Levitan, David. HPD has recorded 38 housing violations here, most recently on November 30, 2022. City tax records listed 12 rent-stabilized apartments here in 2024.
- HPD violations
- 38
- DOB violations
- 17
- ECB violations
- 3
- HPD complaints
- 18
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 38
- CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective at public hall stairs bulkhead to roof
Nov 30, 2022
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Oct 22, 2022
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at the vestibule , 1st story
May 7, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
May 7, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2021
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of free standing radiator at public hall, 1st story
Jan 29, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 29, 2021
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of air conditioner at vestibule at public hall, 1st story
Jan 29, 2021
Closed — Violation closed - ANon-hazardous
§ 213, subd. 5 m/d law discontinue use of interior room for living or provide a single opening of at least 60 percent of area of the partition to room having window opening directly to street or yard ... in the 1st room from north located at apt 3, 1st story, 1st apartment from east at south
Sep 11, 2019 · Apt 3
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 6, 2019
Closed — Violation closed
Show 28 more ↓
- CImmediately hazardous
Arrange and make self-closing the doors at front entrance located at apt 3, 1st story, 1st apartment from east at south
Sep 6, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 3, 1st story, 1st apartment from east at south
Sep 6, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing located at apt 3, 1st story, 1st apartment from east at south
Sep 6, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Replace with new the missing saddle at entrance in the bathroom located at apt 3, 1st story, 1st apartment from east at south
Sep 6, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the bathroom located at apt 3, 1st story, 1st apartment from east at south
Sep 6, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires north wall in the bathroom located at apt 3, 1st story, 1st apartment from east at south
Sep 6, 2019 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 3, 1st story, 1st apartment from east at south
Sep 6, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Sep 6, 2019
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign posted - blank - no info at public hall, 1st story
Sep 6, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 30, 2019
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner unit installed at 3rd story, north fire escape, building front
Aug 30, 2019
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 30, 2019
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 30, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 27, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Mar 27, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 27, 2019
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors at entrace to the building at public hall, 1st story
Mar 27, 2019
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 3, 1st story, 1st apartment from east at south
Mar 27, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors at entrance located at apt 3, 1st story, 1st apartment from east at south
Mar 27, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3, 1st story, 1st apartment from east at south
Mar 27, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3, 1st story, 1st apartment from east at south
Mar 27, 2019 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3, 1st story, 1st apartment from east at south
Mar 27, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , ceiling, north wall, south wall in the bathroom located at apt 3, 1st story, 1st apartment from east at south
Mar 27, 2019 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation , 2nd riser from north at east wall, 3rd riser from north at east wall in the bathroom located at apt 3, 1st story, 1st apartment from east at south
Mar 27, 2019 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the bathroom located at apt 3, 1st story, 1st apartment from east at south
Mar 27, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 2nd room from north located at apt 3, 1st story, 1st apartment from east at south
Mar 27, 2019 · Apt 3
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 9, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 20, 2015
Closed — Violation dismissed
DOB building violations · 17
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 10, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed
Show 7 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 3
- Class - 2
Failure to maintain bldg in code compliant manner: lock of emergency lighting for exits, exit discharges & public corridors per dc.1006.1: 27-542. noted: @ 2nd, 3rd flr missing emergency lighting. rem: comply w
Jun 23, 2016
Resolve - Class - 2
Failure to maintain bldg in code-complaint manner. noted: at the roof,exp#2 there were broken & missing parts of the metal rail on the parapet. remedy: comply w/code/repair or replace.
May 12, 2016 · Penalty $500
Resolve - Class - 1
Failure to maintain building in code-compliant manner: lack of emergency lighting for exits and illumination for exits,exit discharges and public corridors per bc 27-542. noted: at 3rd,2nd flr missing emergenc
May 12, 2016 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Entire building
Nov 25, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 20, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 28, 2021 · Apt 2
Close - Safety
Window guard broken/missing
Mar 21, 2019 · Apt 3
Close - Safety
Window guard broken/missing
Mar 21, 2019 · Apt 3
Close - Heat/hot water
Entire building
Jan 11, 2018 · Apt 6
Close - Heat/hot water
Entire building
Jan 11, 2018 · Apt BLDG
Close - Nonconst
Vermin
Oct 19, 2010 · Apt 10
Close - Heating
Heat related
Oct 19, 2010 · Apt 10
Close - Nonconst
Vermin
Oct 19, 2010 · Apt 10
Close
Show 8 more ↓
- Heating
Heat related
Jan 29, 2010 · Apt 2
Close - Heating
Heat related
Oct 17, 2009 · Apt BLDG
Close - Heating
Heat related
Oct 16, 2009 · Apt 9
Close - Plumbing
Water-leaks
Aug 10, 2007 · Apt 11
Close - Paint/plaster
Ceiling
Aug 10, 2007 · Apt 11
Close - Plumbing
Water-leaks
Aug 10, 2007 · Apt 11
Close - Paint/plaster
Ceiling
Aug 10, 2007 · Apt 11
Close - Nonconst
Vermin
Aug 10, 2007 · Apt 11
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 3
- Residential units
- 12
- Building area
- 6,800 ft²
- Lot area
- 3,000 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 36
- Block / lot
- 1664 / 26
- Assessed value
- $660,150
- Landmark / historic district
- No
HPD registration #362928, last renewed Aug 20, 2025.
Questions about 430 Halsey Street
Who owns 430 Halsey Street?
The owner of record in NYC Department of City Planning PLUTO data is Levitan, David.
Does 430 Halsey Street have violations?
Yes. NYC HPD has recorded 38 housing violations at this property.
Is 430 Halsey Street rent stabilized?
NYC Department of Finance tax bills listed 12 rent-stabilized units here in 2024 (about 100% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 430 Halsey Street built?
City records list 1910 as the year it was built.
How many apartments are in 430 Halsey Street?
It has 12 residential units and 13 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.