260 Malcolm X Boulevard
Brooklyn, NY 11233BBL 3-01661-0050Map
Owner of record: Bnia Stuyvesant Heights Housing Developm Ent Fund C
260 Malcolm X Boulevard is a walk-up apartment building built in 1904 in Brooklyn, 11233. It has 10 residential units across 4 floors. The owner of record is Bnia Stuyvesant Heights Housing Developm Ent Fund C. HPD has recorded 20 housing violations here, most recently on April 28, 2026. 1 of the 20 most recent violations are still open. City tax records listed 10 rent-stabilized apartments here in 2024.
- HPD violations
- 20
- DOB violations
- 11
- ECB violations
- 3
- HPD complaints
- 60
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 20
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4c, 4th story, 1st apartment from north at east
Apr 28, 2026 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector inoperable located at apt 4c, 4th story, 1st apartment from west at north
Oct 23, 2020 · Apt 4C
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable located at apt 4c, 4th story, 1st apartment from west at north
Oct 23, 2020 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles in the bathroom located at apt 2a, 2nd story, 2nd apartment from east at south
Jul 20, 2020 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective (unhinged) base cabinet door at west wall in the kitchen located at apt 2a, 2nd story, 2nd apartment from east at south
Jul 14, 2020 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective caulking at base of wall around bathtub in the bathroom located at apt 2a, 2nd story, 2nd apartment from east at south
Jul 14, 2020 · Apt 2A
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ..flower pots at 4th story balcony at 1st fire escape from north at west
Jul 14, 2020
Closed — Violation closed - BHazardous
Fire escape defective. replace with new the broken, defective and/or missing gusset plate at north upper rail at 4th story balcony at 1st fire escape from north at west
Jul 14, 2020
Closed — Violation closed
Show 10 more ↓
- BHazardous
Fire escape defective. replace with new the broken, defective and/or missing gusset plate at north upper rail at 3rd story balcony at 1st fire escape from north at west
Jul 14, 2020
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 2a, 2nd story, 2nd apartment from east at south
Jul 14, 2020 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mechanical stopper at bathbub in the bathroom located at apt 2a, 2nd story, 2nd apartment from east at south
Jun 14, 2018 · Apt 2A
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2a, 2nd story, 2nd apartment from east at south
Jun 14, 2018 · Apt 2A
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in waste line drain pipe at sink in the kitchen located at apt 2a, 2nd story, 2nd apartment from east at south
Jun 14, 2018 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at lower sash window in the kitchen located at apt 2a, 2nd story, 2nd apartment from east at south
Jun 14, 2018 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2a, 2nd story, 2nd apartment from east at south
Jun 14, 2018 · Apt 2A
Open — Nov sent out - BHazardous
Properly secure the loose knob and spindle, mortise lock at door in the entrance located at apt 4c, 4th story, 1st apartment from north at east
May 1, 2018 · Apt 4C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color - the ceiling in the private hallway located at apt 4c, 4th story, 1st apartment from north at east
May 1, 2018 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Remove all obstructions from water closet .... in the bathroom located at apt 4c, 4th story, apartment at east
May 19, 2014 · Apt 4C
Closed — Violation closed
DOB building violations · 11
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 3
- Class - 2
Work does not conform to approved const documents.noted:shed erected under permit#320304179.installation @ exp#4 is contrary to approved plans,missing horizontal braces and diagonal bracing above the 8ft height
May 23, 2011
Resolve - Class - 2
Work does not conform to approved construction documents.noted:scaffold erected under permit#320304728,installation is contrary to approvedplans,@ exp#1,scaffold erected on shed and back onto setback @ exp#2
May 23, 2011
Resolve - Class - 2
Sdwlk shed does not meet code specifications.noted:parapet on sdwlk shed @ exp#1 is not fully enclose around bus stop to prevent material ordebris from falling through.rem:conform shed to code specification.par
May 23, 2011 · Penalty $2,400
Resolve
Complaints
- Plumbing
Water supply
Jun 2, 2010 · Apt 4A
Close - Plumbing
Basin/sink
Aug 28, 2009 · Apt 3B
Close - Paint/plaster
Ceiling
Aug 28, 2009 · Apt 3B
Close - Electric
Lighting
Aug 28, 2009 · Apt 3B
Close - General
Doors
Mar 21, 2007 · Apt 2A
Close - Plumbing
Toilet
Mar 21, 2007 · Apt 2A
Close - General
Doors
Mar 8, 2007 · Apt 4A
Close - General
Doors
Mar 8, 2007 · Apt 4A
Close - Nonconst
Vermin
Mar 8, 2007 · Apt 4A
Close - Plumbing
Toilet
Mar 8, 2007 · Apt 4A
Close
Show 40 more ↓
- General
Locks
Mar 8, 2007 · Apt 4A
Close - Heating
Heat-plant
Jan 10, 2007 · Apt 4A
Close - Heating
Heat related
Jan 10, 2007 · Apt 4A
Close - General
Locks
Nov 12, 2006 · Apt 2A
Close - Electric
Bell-buzzer/intercom
Nov 12, 2006 · Apt 2A
Close - Appliance
Refrigerator
Nov 12, 2006 · Apt 2A
Close - Plumbing
Water-leaks
Apr 15, 2006 · Apt 2B
Close - Appliance
Refrigerator
Jun 15, 2005 · Apt 3A
Close - General
Floor
Jun 15, 2005 · Apt 3A
Close - General
Cabinet
Jun 15, 2005 · Apt 3A
Close - General
Windows
Jun 15, 2005 · Apt 3A
Close - Nonconst
Vermin
Jun 15, 2005 · Apt 3A
Close - Heating
Heat related
Jun 15, 2005 · Apt 3A
Close - General
Locks
Jun 14, 2005 · Apt 4A
Close - General
Windows
Jun 14, 2005 · Apt 4A
Close - General
Windows
Jun 14, 2005 · Apt 4A
Close - Nonconst
Vermin
Jun 14, 2005 · Apt 4A
Close - Nonconst
Vermin
Jun 14, 2005 · Apt 4A
Close - General
Locks
Jun 13, 2005 · Apt 4A
Close - Electric
Electric-supply
Jun 13, 2005 · Apt 4A
Close - Electric
Electric-supply
Jun 13, 2005 · Apt 4A
Close - General
Windows
Jun 13, 2005 · Apt 4A
Close - Nonconst
Vermin
Jun 13, 2005 · Apt 4A
Close - Nonconst
Vermin
Mar 1, 2005 · Apt 4B
Close - Paint/plaster
Wall
Mar 1, 2005 · Apt 4B
Close - Appliance
Electric/gas range
Feb 7, 2005 · Apt 2A
Close - Heating
Heat related
Jan 29, 2005 · Apt 4A
Close - Nonconst
Vermin
Jan 28, 2005 · Apt 4A
Close - General
Doors
Jan 28, 2005 · Apt 4A
Close - Heating
Heat related
Jan 28, 2005 · Apt 4A
Close - Heating
Heat related
Jan 28, 2005 · Apt 4A
Close - Electric
Electric-supply
Aug 4, 2003 · Apt 4A
Close - Electric
Electric-supply
Aug 4, 2003 · Apt 4A
Close - Electric
Electric-supply
Aug 4, 2003 · Apt 4A
Close - Nonconst
Vermin
Aug 4, 2003 · Apt 4A
Close - Electric
Electric-supply
Aug 3, 2003 · Apt 4B
Close - Electric
Bell-buzzer/intercom
Aug 3, 2003 · Apt 4A
Close - Electric
Electric-supply
Aug 3, 2003 · Apt 4A
Close - Electric
Electric-supply
Aug 3, 2003 · Apt 4A
Close - Electric
Electric-supply
Aug 3, 2003 · Apt 4A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1904
- Floors
- 4
- Residential units
- 10
- Building area
- 9,886 ft²
- Lot area
- 3,000 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1661 / 50
- Assessed value
- $395,550
- Landmark / historic district
- Bedford Stuyvesant / Expanded Stuyvesant Heights Historic District
HPD registration #339102, last renewed Aug 14, 2025.
Questions about 260 Malcolm X Boulevard
Who owns 260 Malcolm X Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Bnia Stuyvesant Heights Housing Developm Ent Fund C.
Does 260 Malcolm X Boulevard have violations?
Yes. NYC HPD has recorded 20 housing violations at this property.
Is 260 Malcolm X Boulevard rent stabilized?
NYC Department of Finance tax bills listed 10 rent-stabilized units here in 2024 (about 100% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 260 Malcolm X Boulevard built?
City records list 1904 as the year it was built.
How many apartments are in 260 Malcolm X Boulevard?
It has 10 residential units and 11 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.