228 Malcolm X Boulevard
Brooklyn, NY 11221BBL 3-01656-0041Map
Owner of record: Will-Mar-Realty LLC
228 Malcolm X Boulevard is an elevator apartment building built in 2018 in Brooklyn, 11221. It has 15 residential units across 6 floors. The owner of record is Will-Mar-Realty LLC. HPD has recorded 3 housing violations here, most recently on March 31, 2023. City tax records listed 15 rent-stabilized apartments here in 2024.
- HPD violations
- 3
- DOB violations
- 34
- ECB violations
- 55
- HPD complaints
- 7
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 3
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations · 34
- Elevator elevatorrequired
E-elevator elevatorrequired
Oct 4, 2021
Dob violation - active - Construction other optional
C-construction other optional
Jun 26, 2017
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Dec 7, 2016
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Nov 3, 2016
Vp*-violation unserved ecb- dismissed - Construction other optional
Stop all work immediately make site safe only contact borough comm office at 718 802-3677
Dec 29, 2015
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 22, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 29, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 29, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed
Show 24 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 29, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 4, 2011
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Feb 11, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 5, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 55
- Class - 1
Unlawfully continued work wjile notice of stop work orser (swo) @the time of my swo re-inpsection (cmu#3712001), observed 6 sty was under fswo. one of the violations was issued for roof protection missing for
Aug 8, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to maintain adequate housekeeping. a time of inspection on a 6sty new bldg observed inadequate housekeeping throughout all floors ofthe bldg creating trippoing hazards & obstructing the pathway. at exp#
Jul 17, 2019 · Penalty $2,500
Resolve - Class - 1
Sec. 3303.4.1.1 maintenance of sidewalk. at time of inspection on a 6 sty new bldg observed at exp#1 poor maintenance of the sidewalk. observed unleveled cracked & broken concrete as well as debris/garbage on
Jul 17, 2019 · Penalty $2,500
Resolve - Class - 2
Temporary construction equipment on site-exp permit. at time of inspection on a 6 sty new bldg,observed jobsite fence in plavce at exp#1 occupying the sidewalk. upon research on dob noe & bis observed that the
Jul 17, 2019
Resolve - Class - 1
Failure to provide sidewalk shed where required at time of inspection on a 6 sty new bldg observed exterior work at roof level that was not completed. observed flasing in place a the parapet w/brick exposed &
Jul 17, 2019 · Penalty $10,000
Resolve - Class - 1
Sec. 3309.10 roof protection exp#4&2. at time of inspection on a 6 sty new bldg observed flashing only on parapet wall at roof level w/brick& foam exposed in certain areas. upon review of site architectural pla
Jul 17, 2019 · Penalty $2,500
Resolve - Class - 1
Sec. 3307.4 warning signs,personnel & barriers-obstruction of pedestrian pathway. at time of inspection on a 6 sty new bldg observed workersremoving debris from site while pedestrian were passing & left debris
Jul 17, 2019 · Penalty $2,500
Resolve - Class - 1
Sec. 3307.4.3 vehicular traffic. at time of inspection on a 6 sty new bldg observed a debris container at exp#1 in the roadway near the curb that was being used by workers for debris removal w/no barriers surro
Jul 17, 2019 · Penalty $2,500
Resolve - Class - 1
Construction superintendent failed to do duties per code. on this day upon completion of inspeciton the site was issued a stop work order for the following violating conditions,1)inadequate jobsite fence exp#1
Jul 17, 2019 · Penalty $10,000
Resolve - Class - 2
Sec. 3301.13.13 missing daily log book. at time of inspection on a 6 sty new bldg observed construction operations in progress & many unsafe conditions on site for both the workers & the public. such as inadequ
Jul 17, 2019
Resolve
Show 40 more ↓
- Class - 2
Failure to safeguard all persons & property affected by construction operations. at time of inspection of a 6 sty new bldg observed panels missing from jobsite fence exp#1 & a chainlink fence in replacement of
Jul 17, 2019 · Penalty $400
Resolve - Class - 1
3301-02(b) designation of construction superintendent.note:at the timeof my inspection of a 6 story building at 3rd floor level constructio n work in progress.upon request for designated construction superinten
Jun 26, 2017 · Penalty $1,630
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no hand rails.note:at the time of my inspection of a 6 story buildingat 3rd floor level,construction work in progress.i observed
Jun 26, 2017 · Penalty $800
Resolve - Class - 2
Failure to institute/maintain safety equipment measures or temporary construction.note:at the time of my inspection of a 6 story building at 3rd floor level,construction work in progress i observed stairway
Jun 26, 2017 · Penalty $800
Resolve - Class - 1
Use of supported scaffold without certification.note:at the time of myinspection of a 6 story building at 3rd floor level,construction work in progress.i observed thre workers using supported pipe scaffolds.
Jun 26, 2017 · Penalty $400
Resolve - Class - 1
3314.8 guardrail.note: at the time of my inspection of a 6 story building at 3rd floor level,construction work in progress.i observed supported pipe scaffold being used on 3rd floor level at perimeter on expos
Jun 26, 2017 · Penalty $800
Resolve - Class - 1
3307.2.6 requirements for sidwalks temporary walkways.note:at the time of my inspection of a 6 story buildig at 3rd floor level,construction work in progress.i observed sidewalk at exposure one was not provided
Jun 26, 2017 · Penalty $800
Resolve - Class - 1
Construction superintendent failed to perform duties as per rule.the followeing hazardous condition was observed and stop work order issued to this construction site at time of inspection.1)inadequate guardrail
Jun 26, 2017 · Penalty $1,600
Resolve - Class - 1
3302.2 failure to institute/maintain safety measures or temporary construction-no rebar caps.note:at the time of my inspection of a 6 story building at 3rd floor level,construction work in progress.i observed
Jun 26, 2017 · Penalty $800
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction.no guard rails.note:at the time of my inspection of a 6 story building at 3rd floor level construction work in progress.i obse
Jun 26, 2017 · Penalty $400
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operation:(safety maeasures)note:at the time of my inspection of a 6 story building at 3rd floor level construction worki in progress.i obse
Jun 26, 2017
Resolve - Class - 1
3307.4.7work and storage zone.note:at the time of my inspection of a 6 story building at 3rd floor level,construction work in progress.i observed that there were no barrier provided as required for storage area
Jun 26, 2017 · Penalty $800
Resolve - Class - 1
3301.6 design,sizes and capacity of materials,structures temporary co nstruction and equipment.note:at the time of my inspection of a 6 story building at 3rd floor level,construction work in progress.i observed
Jun 26, 2017 · Penalty $800
Resolve - Class - 1
3307.6.5.7installation inspection.note:at the time of my inspection ofa 6 story building at 3rd floor level construction work in progress.i observed approximately 52 feet of sidwalk shed erected at exposure one
Jun 26, 2017 · Penalty $400
Resolve - Class - 2
Failure to provide information panel. note: at time of inspection i observed sidewalk shed in place w/o information panel on parapet. remedycomply w/code.
Jun 15, 2017 · Penalty $400
Resolve - Class - 2
Failure to provide approved/accepted plans at jobsite at time of inspection.noted at time of inspection contractor has excavated and installed storing,approx 10'deep and no plans on site for this wrk was provid
Dec 28, 2016
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations.noted:at time of inspection contractor has excavated approx10'deep and continue to install bracing and storing and no plans on si
Dec 28, 2016 · Penalty $250
Resolve - Class - 2
Failure to provide approved plans on site. noticed excavation work on going when ask for approved soe plans none provided. remedy: stop all excavation work provide plans.
Dec 7, 2016 · Penalty $250
Resolve - Class - 1
Sec. 3307;27-1021 no job site fence at time of inspection in respose to a complaint observed that the job site fence was missing at exp#2,3 or 4 bldg rear. stop all work entire site. remedy: provide jobsite fen
Nov 3, 2016 · Penalty $400
Resolve - Class - 1
Bc3303.4.1 failure to maintain sidewalk. as noted: at time of inspection on an active construction site observed at exp#1 malcolm x blvd concrete pump pipe blocking the sidewalk. failure to maintain all areas
Feb 2, 2016 · Penalty $400
Resolve - Class - 2
Failure to perform proper concrete washout procedures at site collection and containment as noted: at time of inspection on an active construction site observed concrete placement at foundtion level apprx 60 ya
Feb 2, 2016 · Penalty $1,200
Resolve - Class - 2
Failure to provide special inspection of concrete placement tr1. as noted: at time of inspection on an active construction site.observed concrete placement apprx 60 yards of 4000 psi at exp#3 foundation.a
Feb 2, 2016 · Penalty $1,600
Resolve - Class - 2
Bc28-105.5 forms filed wtih dob do not have required signatures. as noted: at time of inspection on an active construction site tr-3 concrete design mix do not have required signatures on line#5 concrete pro
Feb 2, 2016
Resolve - Class - 1
Flammable and combustible mixtures compressed gases and other hazrdousmaterial as noted: at time of inspection on an active construction si te observed at exp#1 ground level 2 tanks 1 of acetylene and 1 of oxy
Feb 2, 2016 · Penalty $1,600
Resolve - Class - 2
Failure to provide filed storage wiring box at construction site. as noted: at time of inspection on an active construction site observed at exp1 ground level 8 4"x8" strength test cylinders molded 2-1-16 left
Feb 2, 2016 · Penalty $1,600
Resolve - Class - 1
Bc3301.4.1 maintenance of areas used by the public at time of inspec tion noted that the sidewalk at exp#1 was severely cracked posing a tripping hazard to the public.rmdy: fswo entire job except for remedial
Apr 30, 2015 · Penalty $400
Resolve - Class - 1
Bc3309.9 weather proofing of adjoining property. at time of inspectionnoted that the requried weather proofing at exp#2 at rear and exp#4 where not performed as per code requirement. par() and sealing of prop
Apr 29, 2015 · Penalty $800
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34906406m issued on 4.6.11. removal of bricks from 2nd flr facade. remedy: comply w/the commissioner's order.
Jul 11, 2012
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34906406m issued on 4/6/11. remove bricks from 2nd fl facade w/o a permit. remedy: comply w/the comm's order.
May 8, 2012
Resolve - Class - 1
Failure to comply with the commissioner's order contained in notice ofviolation #34906406m issued on 4-6-11 for masonry facade etc w/o a permit. rem:comply with the commissioner's order.
Mar 2, 2012
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in notice of violation # 34906406m issued on 04/06/11. for work w/o a permit on masonry facade remedy: coply w/ the commissioner's order
Dec 8, 2011
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34906406m issued on 4/6/11,for removing brick facade -2 fl,w/o permit. remedy: comply w/the comm's order.
Sep 24, 2011
Resolve - Class - 1
Failure to comply w/ comms order to correct violating conditions noted in ecb #34906406m for removing brick facade w/o a permit rem: comply w/ the comms order
Jul 30, 2011
Resolve - Class - 1
Failure to comply w/ an order of the comm resp failed to correct the conditions cited in nov#34906406m for remove brick facade w/o permit rem: comply w/ comms order
Jun 22, 2011
Resolve - Class - 1
Respondent failed to correct violating conditions cited in the prior nov#34871194m
Apr 9, 2011 · Penalty $12,000
Resolve - Class - 1
Respondent failed to correct violating conditions cited in the prior nov#34895741z rem: comply w/ comms order
Apr 9, 2011
Resolve - Class - 1
2 stories bldg front facade entire brick of 2nd fl removed w/o permit rem: obtain permit or restore premises to prior legal conditions
Apr 6, 2011
Resolve - Class - 1
Unlawful acts. failure to comply w/an order of commissioner. respondent failed to correct violating conditions cited in the prior nov #34871194m. remedy: comply w/commissioner's order.
Feb 25, 2011 · Penalty $12,000
Resolve - Class - 1
Failure to maintain exterior wall(s) or appurtenances. at time of inspection observed at front of premises brick facade at entire 2nd flr level is separated from bldg and is bulging outward approx 4" towards
Feb 9, 2011 · Penalty $5,000
Resolve - Class - 1
Failure to maintain.noted:@ structure front-brick second flr facade is separating from substrate.entire second story separating with a gap approx between 4"to 1.noted:pedestrian maybe @ risk of wall collapsing
Jul 27, 2010 · Penalty $5,000
Resolve
Complaints
- Paint/plaster
Ceiling
Jul 24, 2022 · Apt 4A
Close - Water leak
Slow leak
Jul 24, 2022 · Apt 4A
Close - Water leak
Damp spot
Sep 11, 2021 · Apt 4A
Close - Paint/plaster
Ceiling
Sep 11, 2021 · Apt 4A
Close - Paint/plaster
Ceiling
Sep 11, 2021 · Apt 4A
Close - Paint/plaster
Ceiling
Sep 11, 2021 · Apt 4A
Close - Water leak
Slow leak
Sep 11, 2021 · Apt 4A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2018
- Floors
- 6
- Residential units
- 15
- Building area
- 13,185 ft²
- Lot area
- 4,131 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1656 / 41
- Assessed value
- $851,850
- Landmark / historic district
- No
HPD registration #389385, last renewed Jul 11, 2025.
Questions about 228 Malcolm X Boulevard
Who owns 228 Malcolm X Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Will-Mar-Realty LLC.
Does 228 Malcolm X Boulevard have violations?
Yes. NYC HPD has recorded 3 housing violations at this property.
Is 228 Malcolm X Boulevard rent stabilized?
NYC Department of Finance tax bills listed 15 rent-stabilized units here in 2024 (about 100% of its 15 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 228 Malcolm X Boulevard built?
City records list 2018 as the year it was built.
How many apartments are in 228 Malcolm X Boulevard?
It has 15 residential units and 16 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.