204 Malcolm X Boulevard

Brooklyn, NY 11221BBL 3-01646-0045Map

Owner of record: 200 Malcolm X Blvd Rlty

204 Malcolm X Boulevard is an elevator apartment building built in 2020 in Brooklyn, 11221. It has 8 residential units across 4 floors. The owner of record is 200 Malcolm X Blvd Rlty. HPD has recorded 15 housing violations here, most recently on September 12, 2026. 12 of the 15 most recent violations are still open.

HPD violations
15
DOB violations
34
ECB violations
27
HPD complaints
35

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 12, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 15

  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Sep 12, 2026

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling abutting south wall at public hall, 4th story

    Sep 12, 2026

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling in the private hallway located at apt 401, 4th story, 1st apartment from north at east

    Sep 11, 2026 · Apt 401

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 401, 4th story, 1st apartment from north at east

    Sep 11, 2026 · Apt 401

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective closet door at west wall in the 1st room from east located at apt 401, 4th story, 1st apartment from north at east

    Sep 11, 2026 · Apt 401

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective closet door at west wall in the 1st room from east located at apt 401 upper level, 4th story, 1st apartment from north at east

    Sep 11, 2026 · Apt 401

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story

    Sep 11, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardent materials at ceiling at public hall, 4th story

    Sep 11, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 16, 2025

    Closed — Violation dismissed
  • B

    Refit windows at east and south walls in the 1st room from north located at apt 303, 3rd story, 1st apartment from east at south

    Jun 7, 2024 · Apt 303

    Open — Nov sent out
Show 5 more ↓
  • C

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Jun 7, 2024

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 303, 3rd story, 1st apartment from east at south

    Jun 7, 2024 · Apt 303

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling south and east walls in the 1st room from north located at apt 303, 3rd story, 1st apartment from east at south

    Jun 7, 2024 · Apt 303

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 303, 3rd story, 1st apartment from east at south

    Apr 22, 2024 · Apt 303

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 18, 2024

    Closed — Violation dismissed

DOB building violations · 34

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Construction other optional

    Borough commissioner has ordered all work stopped under application #321387012 on 07/29/2022 due to construction superintendent withdrawal. no access to site. work appears to be 0% complete.

    Aug 5, 2022

    Dob violation - dismissed
  • Construction other optional

    Borough commissioner has ordered all work stopped under application #321387012 on 07/29/2022 due to construction superintendent withdrawal. no access to site. work appears to be 0% complete.

    Aug 5, 2022

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 13, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
Show 24 more ↓
  • Construction other optional

    Ftm bldg is 3st+c attach mix use wood framed w/local areas of steel framing&masonry ext walls bldg on corner lot.90% of 2ndfl joists are fractured.some steel pipe columns in cell are corroded near their base brick pier at fw on 1stfl level lean outward at top.remedy:own retain pe engr eval bldg&comp rprs und perm.file perm by 5/4/18

    Apr 4, 2018

    Dob violation - dismissed
  • Construction other optional

    Ftm bldg is a 1st attach wood frame comm bldg.there are local areas of deteriorated wood wall framing&deteriorated wall sheathing at front wall.remedy:owner to retain nys pe engineer to evaluate building&comp rprs under permit.file for permit by 5/4/18.permit signoff by 7/6/18

    Apr 4, 2018

    Dob violation - dismissed
  • Construction other optional

    Emerg wrk.bldg is 3st+c attach mix use wood framed w/local areas of steel framing&masonry ext walls.90% of 2ndfl wood joists are fractured some steel pipe columns in cell are corroded near their bases.remedy: immed install shoring at underside of 2ndfl framing to cell slab.shore w/4ft of fract&prov 2 line of shor at midspan fract.file perm w/48hrs

    Mar 22, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active

ECB violations · 27

  • Class - 2

    Temporary construction equipment onsite-expired permit.observed sidewalk shed erected/still up at site.temporary construction equipment requires a permit at all times to remain installed.permit in dob now expir

    Apr 12, 2022

    Resolve
  • Class - 2

    Failure to maintain/display onsite documents required by chapter 33.attime of inspection at an active construction jobsite i observed concrete embedded safety straps on the 1st and 2nd floor.upon request for th

    Dec 29, 2021

    Resolve
  • Class - 2

    Exterior walls on exposure 4 from 1st. to 4th. floor were installed with metal framed walls contrary to cmu walls indicated on comcheck and exterior walls details as per plans., conform work to approved constru

    Aug 18, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    3309.10 protection of roofs whenever any building is to be constructedabove of an adjoining building.it shall be the duty of the person causing such construction to protect from damage at all times to protect r

    Jun 28, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to institute safety equipment for temporary construction failure to install handrails: note: at the time of my inspecton of a proposed 4 sty new bldg under constuction an active jobsite,i observed stair

    Jun 28, 2021

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirement. note: at the time of my inspection of a proposed 4 sty new bldg under construction an active job site. i observed on multiple levels constructi

    Jun 28, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to comply w/manufacturer specifications w/plastic traffic barricades,not being fully filled w/water. note: at the time of my inspection of a proposed 4 sty new bldg under construction an active jobsite

    Jun 28, 2021 · Penalty $625

    Resolve
  • Class - 1

    Fail to comminicate & maintain a record of orientation perform at job site. note: at the time of my inspection of a 4 sty new bldg construction work in progress. upon request & review of site safety orientation

    Mar 26, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Guardrails. note: at the time of my inspection of a 4 sty new bldg construction work in progress. i observed mezzanines in bldg w/stairs leading to them & have no guardrails systems-no guardrails systems create

    Mar 26, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Pre-shift safety meeting. note: at the time of my inspection of a 4 sty new bldg construction work in progress. i observed pre-shift safety meeting not being perform from since 2/18/2021 fail to perform site

    Mar 26, 2021 · Penalty $625

    Resolve
Show 17 more ↓
  • Class - 2

    Overhead protection. note: at the time of my inspection of a 4 sty newbldg construction work in progress. i observed that there was no overhead protection at exp#1&2 between sidewalk shed & bldg,overhead protec

    Mar 26, 2021 · Penalty $5,000

    Resolve
  • Class - 1

    Bc 3307.2.6 requirements for sidewalk,walkway and pathways. note-at the time of my inspection of a 4 story new building construction work inprogress. i observed the path between the sidewalk shed and const fenc

    Mar 26, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3309.10 protection of roof. at the time of my inspection of a 4 sty nb construction site,construction work ongoing,i observed at exp#4 missing roof protection the adj property roof. failire to protect adj

    Nov 17, 2020

    Resolve
  • Class - 2

    Failure to institute & maintain safety equipment-overload protection. at the time of my inspection of a 4 sty nb construction site,construction work ongoing,. i observed at exp#2&3 corner,missing ohp missing

    Nov 17, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons/violation #35303885m.issued on 03-30-18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.unlawful acts failure to

    May 28, 2019 · Penalty $6,250

    Resolve
  • Class - 1

    Removed or defaced a written posted vacate order.at the time of inspection and observed a written vacate order has been defaced and partial tear construction fence/gate blocked posted vacate views vacate order

    May 28, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35303885m issued on 03-30-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.

    Mar 15, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35303885m issued on 03-30-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for: unlawful acts,failure to comply w/an order of the commissi

    Dec 5, 2018 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order contained in summons/violation#35303885m issued on 3/30/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. note:no document file for

    Oct 11, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation#35303885m issued on 03/30/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.operation of a place of a

    Aug 24, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio #35303885m issued on 03/30/18 & to file a cert of correction to pursuant to 28-2011 & 1rcny 102-01.note:no documented file for failure to obey a vac

    Jul 14, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35309422n issued on 03/22/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for failure to safeguar

    Jun 23, 2018

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation#35303885m issued on 03/30/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.note:no document filed fo

    May 19, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    Unlawful acts. failure to comply with an order of the commissioner. noted: vacate order #b147 issued due to premises is in a state of disrepairs at the first and 2d floor levels. with exposed wood joists that

    Mar 30, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations.noted:alteration type 3 under permit #340588803-01-al issued03/16/18 & expires on 02/04/19 for demolition of sheet rock @ ceiling

    Mar 22, 2018 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to file c of c with dob pursuant to 28-204.2for violation 34810879x-commercial space converted to sro's.rem-file c of c.

    Apr 2, 2010 · Penalty $800

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by the cert of occupancy or dob records indicate premises to be a commercial store & 2 family now at rear of store chinese restaurant converted into 3 sro's w/ bunk bed & clot

    Nov 2, 2009 · Penalty $2,400

    Resolve

Complaints

  • Water leak

    Slow leak

    Sep 10, 2026 · Apt 401

    Close
  • Unsanitary condition

    Mold

    Sep 10, 2026 · Apt 401

    Close
  • Unsanitary condition

    Mold

    Sep 2, 2026 · Apt 401

    Close
  • Paint/plaster

    Ceiling

    Sep 2, 2026 · Apt 401

    Close
  • Water leak

    Damp spot

    Sep 2, 2026 · Apt 401

    Close
  • Flooring/stairs

    Floor

    Sep 2, 2026 · Apt 401

    Close
  • Water leak

    Slow leak

    Sep 2, 2026 · Apt 401

    Close
  • General

    Cabinet

    Sep 2, 2026 · Apt 401

    Close
  • Heat/hot water

    Apartment only

    Feb 2, 2026 · Apt 203

    Close
  • Paint/plaster

    Wall

    Jun 10, 2024 · Apt 303

    Close
Show 25 more ↓
  • Door/window

    Window frame

    Jun 6, 2024 · Apt 303

    Close
  • Paint/plaster

    Window/frame

    Jun 6, 2024 · Apt 303

    Close
  • Heat/hot water

    Apartment only

    Jun 6, 2024 · Apt 303

    Close
  • Water leak

    Slow leak

    Jun 6, 2024 · Apt 303

    Close
  • Unsanitary condition

    Mold

    Jun 6, 2024 · Apt 303

    Close
  • Paint/plaster

    Window/frame

    May 29, 2024 · Apt 303

    Close
  • Door/window

    Window frame

    May 29, 2024 · Apt 303

    Close
  • Door/window

    Window frame

    Apr 10, 2024 · Apt 303

    Close
  • Unsanitary condition

    Mold

    Apr 10, 2024 · Apt 303

    Close
  • General

    Ventilation system

    Aug 22, 2023 · Apt 401

    Close
  • Heat/hot water

    Apartment only

    Aug 22, 2023 · Apt 401

    Close
  • Plumbing

    Bathtub/shower

    Aug 15, 2008 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Aug 15, 2008 · Apt 2

    Close
  • Plumbing

    Bathtub/shower

    Aug 11, 2008 · Apt 2FL

    Close
  • Heating

    Heat related

    Mar 19, 2008 · Apt 1FL

    Close
  • Heating

    Heat related

    Mar 19, 2008 · Apt 1FL

    Close
  • Electric

    Electric-supply

    Mar 19, 2008 · Apt 1FL

    Close
  • Nonconst

    Vermin

    Mar 19, 2008 · Apt 1FL

    Close
  • Heating

    Heat related

    Nov 20, 2007 · Apt 2FL

    Close
  • Heating

    Heat related

    Oct 26, 2006 · Apt 2FL

    Close
  • Nonconst

    Rubbish

    May 24, 2006 · Apt 3RDFL

    Close
  • Nonconst

    Vermin

    May 24, 2006 · Apt 3RDFL

    Close
  • Electric

    Lighting

    May 24, 2006 · Apt 3RDFL

    Close
  • Heating

    Heat related

    Feb 19, 2006 · Apt 3FL

    Close
  • Heating

    Heat related

    Mar 30, 2004 · Apt 2FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
2020
Floors
4
Residential units
8
Building area
11,241 ft²
Lot area
2,500 ft²
Zoning
R6A
Community board
303
Council district
36
Block / lot
1646 / 45
Assessed value
$1,238,850
Landmark / historic district
No

HPD registration #391016, last renewed Sep 2, 2025.

Questions about 204 Malcolm X Boulevard

Who owns 204 Malcolm X Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is 200 Malcolm X Blvd Rlty.

Does 204 Malcolm X Boulevard have violations?

Yes. NYC HPD has recorded 15 housing violations at this property.

Is 204 Malcolm X Boulevard rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 204 Malcolm X Boulevard built?

City records list 2020 as the year it was built.

How many apartments are in 204 Malcolm X Boulevard?

It has 8 residential units and 9 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.