204 Malcolm X Boulevard
Brooklyn, NY 11221BBL 3-01646-0045Map
Owner of record: 200 Malcolm X Blvd Rlty
204 Malcolm X Boulevard is an elevator apartment building built in 2020 in Brooklyn, 11221. It has 8 residential units across 4 floors. The owner of record is 200 Malcolm X Blvd Rlty. HPD has recorded 15 housing violations here, most recently on September 12, 2026. 12 of the 15 most recent violations are still open.
- HPD violations
- 15
- DOB violations
- 34
- ECB violations
- 27
- HPD complaints
- 35
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 15
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 12, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling abutting south wall at public hall, 4th story
Sep 12, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the private hallway located at apt 401, 4th story, 1st apartment from north at east
Sep 11, 2026 · Apt 401
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 401, 4th story, 1st apartment from north at east
Sep 11, 2026 · Apt 401
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective closet door at west wall in the 1st room from east located at apt 401, 4th story, 1st apartment from north at east
Sep 11, 2026 · Apt 401
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective closet door at west wall in the 1st room from east located at apt 401 upper level, 4th story, 1st apartment from north at east
Sep 11, 2026 · Apt 401
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story
Sep 11, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardent materials at ceiling at public hall, 4th story
Sep 11, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - BHazardous
Refit windows at east and south walls in the 1st room from north located at apt 303, 3rd story, 1st apartment from east at south
Jun 7, 2024 · Apt 303
Open — Nov sent out
Show 5 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Jun 7, 2024
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 303, 3rd story, 1st apartment from east at south
Jun 7, 2024 · Apt 303
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling south and east walls in the 1st room from north located at apt 303, 3rd story, 1st apartment from east at south
Jun 7, 2024 · Apt 303
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 303, 3rd story, 1st apartment from east at south
Apr 22, 2024 · Apt 303
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 18, 2024
Closed — Violation dismissed
DOB building violations · 34
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Construction other optional
Borough commissioner has ordered all work stopped under application #321387012 on 07/29/2022 due to construction superintendent withdrawal. no access to site. work appears to be 0% complete.
Aug 5, 2022
Dob violation - dismissed - Construction other optional
Borough commissioner has ordered all work stopped under application #321387012 on 07/29/2022 due to construction superintendent withdrawal. no access to site. work appears to be 0% complete.
Aug 5, 2022
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 13, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed
Show 24 more ↓
- Construction other optional
Ftm bldg is 3st+c attach mix use wood framed w/local areas of steel framing&masonry ext walls bldg on corner lot.90% of 2ndfl joists are fractured.some steel pipe columns in cell are corroded near their base brick pier at fw on 1stfl level lean outward at top.remedy:own retain pe engr eval bldg&comp rprs und perm.file perm by 5/4/18
Apr 4, 2018
Dob violation - dismissed - Construction other optional
Ftm bldg is a 1st attach wood frame comm bldg.there are local areas of deteriorated wood wall framing&deteriorated wall sheathing at front wall.remedy:owner to retain nys pe engineer to evaluate building&comp rprs under permit.file for permit by 5/4/18.permit signoff by 7/6/18
Apr 4, 2018
Dob violation - dismissed - Construction other optional
Emerg wrk.bldg is 3st+c attach mix use wood framed w/local areas of steel framing&masonry ext walls.90% of 2ndfl wood joists are fractured some steel pipe columns in cell are corroded near their bases.remedy: immed install shoring at underside of 2ndfl framing to cell slab.shore w/4ft of fract&prov 2 line of shor at midspan fract.file perm w/48hrs
Mar 22, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 27
- Class - 2
Temporary construction equipment onsite-expired permit.observed sidewalk shed erected/still up at site.temporary construction equipment requires a permit at all times to remain installed.permit in dob now expir
Apr 12, 2022
Resolve - Class - 2
Failure to maintain/display onsite documents required by chapter 33.attime of inspection at an active construction jobsite i observed concrete embedded safety straps on the 1st and 2nd floor.upon request for th
Dec 29, 2021
Resolve - Class - 2
Exterior walls on exposure 4 from 1st. to 4th. floor were installed with metal framed walls contrary to cmu walls indicated on comcheck and exterior walls details as per plans., conform work to approved constru
Aug 18, 2021 · Penalty $1,250
Resolve - Class - 1
3309.10 protection of roofs whenever any building is to be constructedabove of an adjoining building.it shall be the duty of the person causing such construction to protect from damage at all times to protect r
Jun 28, 2021 · Penalty $625
Resolve - Class - 1
Failure to institute safety equipment for temporary construction failure to install handrails: note: at the time of my inspecton of a proposed 4 sty new bldg under constuction an active jobsite,i observed stair
Jun 28, 2021
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirement. note: at the time of my inspection of a proposed 4 sty new bldg under construction an active job site. i observed on multiple levels constructi
Jun 28, 2021 · Penalty $625
Resolve - Class - 1
Failure to comply w/manufacturer specifications w/plastic traffic barricades,not being fully filled w/water. note: at the time of my inspection of a proposed 4 sty new bldg under construction an active jobsite
Jun 28, 2021 · Penalty $625
Resolve - Class - 1
Fail to comminicate & maintain a record of orientation perform at job site. note: at the time of my inspection of a 4 sty new bldg construction work in progress. upon request & review of site safety orientation
Mar 26, 2021 · Penalty $2,500
Resolve - Class - 1
Guardrails. note: at the time of my inspection of a 4 sty new bldg construction work in progress. i observed mezzanines in bldg w/stairs leading to them & have no guardrails systems-no guardrails systems create
Mar 26, 2021 · Penalty $2,500
Resolve - Class - 1
Pre-shift safety meeting. note: at the time of my inspection of a 4 sty new bldg construction work in progress. i observed pre-shift safety meeting not being perform from since 2/18/2021 fail to perform site
Mar 26, 2021 · Penalty $625
Resolve
Show 17 more ↓
- Class - 2
Overhead protection. note: at the time of my inspection of a 4 sty newbldg construction work in progress. i observed that there was no overhead protection at exp#1&2 between sidewalk shed & bldg,overhead protec
Mar 26, 2021 · Penalty $5,000
Resolve - Class - 1
Bc 3307.2.6 requirements for sidewalk,walkway and pathways. note-at the time of my inspection of a 4 story new building construction work inprogress. i observed the path between the sidewalk shed and const fenc
Mar 26, 2021 · Penalty $2,500
Resolve - Class - 1
Sec. 3309.10 protection of roof. at the time of my inspection of a 4 sty nb construction site,construction work ongoing,i observed at exp#4 missing roof protection the adj property roof. failire to protect adj
Nov 17, 2020
Resolve - Class - 2
Failure to institute & maintain safety equipment-overload protection. at the time of my inspection of a 4 sty nb construction site,construction work ongoing,. i observed at exp#2&3 corner,missing ohp missing
Nov 17, 2020 · Penalty $5,000
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation #35303885m.issued on 03-30-18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.unlawful acts failure to
May 28, 2019 · Penalty $6,250
Resolve - Class - 1
Removed or defaced a written posted vacate order.at the time of inspection and observed a written vacate order has been defaced and partial tear construction fence/gate blocked posted vacate views vacate order
May 28, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35303885m issued on 03-30-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Mar 15, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35303885m issued on 03-30-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for: unlawful acts,failure to comply w/an order of the commissi
Dec 5, 2018 · Penalty $5,000
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35303885m issued on 3/30/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. note:no document file for
Oct 11, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35303885m issued on 03/30/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.operation of a place of a
Aug 24, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio #35303885m issued on 03/30/18 & to file a cert of correction to pursuant to 28-2011 & 1rcny 102-01.note:no documented file for failure to obey a vac
Jul 14, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35309422n issued on 03/22/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for failure to safeguar
Jun 23, 2018
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35303885m issued on 03/30/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.note:no document filed fo
May 19, 2018 · Penalty $1,250
Resolve - Class - 1
Unlawful acts. failure to comply with an order of the commissioner. noted: vacate order #b147 issued due to premises is in a state of disrepairs at the first and 2d floor levels. with exposed wood joists that
Mar 30, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations.noted:alteration type 3 under permit #340588803-01-al issued03/16/18 & expires on 02/04/19 for demolition of sheet rock @ ceiling
Mar 22, 2018 · Penalty $5,000
Resolve - Class - 2
Failure to file c of c with dob pursuant to 28-204.2for violation 34810879x-commercial space converted to sro's.rem-file c of c.
Apr 2, 2010 · Penalty $800
Resolve - Class - 1
Occupancy contrary to that allowed by the cert of occupancy or dob records indicate premises to be a commercial store & 2 family now at rear of store chinese restaurant converted into 3 sro's w/ bunk bed & clot
Nov 2, 2009 · Penalty $2,400
Resolve
Complaints
- Water leak
Slow leak
Sep 10, 2026 · Apt 401
Close - Unsanitary condition
Mold
Sep 10, 2026 · Apt 401
Close - Unsanitary condition
Mold
Sep 2, 2026 · Apt 401
Close - Paint/plaster
Ceiling
Sep 2, 2026 · Apt 401
Close - Water leak
Damp spot
Sep 2, 2026 · Apt 401
Close - Flooring/stairs
Floor
Sep 2, 2026 · Apt 401
Close - Water leak
Slow leak
Sep 2, 2026 · Apt 401
Close - General
Cabinet
Sep 2, 2026 · Apt 401
Close - Heat/hot water
Apartment only
Feb 2, 2026 · Apt 203
Close - Paint/plaster
Wall
Jun 10, 2024 · Apt 303
Close
Show 25 more ↓
- Door/window
Window frame
Jun 6, 2024 · Apt 303
Close - Paint/plaster
Window/frame
Jun 6, 2024 · Apt 303
Close - Heat/hot water
Apartment only
Jun 6, 2024 · Apt 303
Close - Water leak
Slow leak
Jun 6, 2024 · Apt 303
Close - Unsanitary condition
Mold
Jun 6, 2024 · Apt 303
Close - Paint/plaster
Window/frame
May 29, 2024 · Apt 303
Close - Door/window
Window frame
May 29, 2024 · Apt 303
Close - Door/window
Window frame
Apr 10, 2024 · Apt 303
Close - Unsanitary condition
Mold
Apr 10, 2024 · Apt 303
Close - General
Ventilation system
Aug 22, 2023 · Apt 401
Close - Heat/hot water
Apartment only
Aug 22, 2023 · Apt 401
Close - Plumbing
Bathtub/shower
Aug 15, 2008 · Apt 2
Close - Plumbing
Basin/sink
Aug 15, 2008 · Apt 2
Close - Plumbing
Bathtub/shower
Aug 11, 2008 · Apt 2FL
Close - Heating
Heat related
Mar 19, 2008 · Apt 1FL
Close - Heating
Heat related
Mar 19, 2008 · Apt 1FL
Close - Electric
Electric-supply
Mar 19, 2008 · Apt 1FL
Close - Nonconst
Vermin
Mar 19, 2008 · Apt 1FL
Close - Heating
Heat related
Nov 20, 2007 · Apt 2FL
Close - Heating
Heat related
Oct 26, 2006 · Apt 2FL
Close - Nonconst
Rubbish
May 24, 2006 · Apt 3RDFL
Close - Nonconst
Vermin
May 24, 2006 · Apt 3RDFL
Close - Electric
Lighting
May 24, 2006 · Apt 3RDFL
Close - Heating
Heat related
Feb 19, 2006 · Apt 3FL
Close - Heating
Heat related
Mar 30, 2004 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2020
- Floors
- 4
- Residential units
- 8
- Building area
- 11,241 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1646 / 45
- Assessed value
- $1,238,850
- Landmark / historic district
- No
HPD registration #391016, last renewed Sep 2, 2025.
Questions about 204 Malcolm X Boulevard
Who owns 204 Malcolm X Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 200 Malcolm X Blvd Rlty.
Does 204 Malcolm X Boulevard have violations?
Yes. NYC HPD has recorded 15 housing violations at this property.
Is 204 Malcolm X Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 204 Malcolm X Boulevard built?
City records list 2020 as the year it was built.
How many apartments are in 204 Malcolm X Boulevard?
It has 8 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.