208 Malcolm X Boulevard
Brooklyn, NY 11221BBL 3-01651-0042Map
Owner of record: 208 Mx Square LLC
208 Malcolm X Boulevard is a mixed residential and retail building built in 1910 in Brooklyn, 11221. It has 5 residential units across 3 floors. The owner of record is 208 Mx Square LLC. HPD has recorded 49 housing violations here, most recently on May 5, 2026. 6 of the 49 most recent violations are still open.
- HPD violations
- 49
- DOB violations
- 9
- ECB violations
- 4
- HPD complaints
- 243
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 49
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 2nd apartment from south at west
Nov 15, 2024 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door to boiler room locked at basement
Nov 15, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2r, 2nd story, 2nd apartment from south at west
Nov 15, 2024 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective reglaze bathtub in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
Dec 20, 2023 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective cracked , spalled bricks with missing and deteriorated mortar at joints , 1st , 2nd, 3rd , 4rth , and parapet wall, southeast section, at east,
May 15, 2022
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
May 4, 2022 · Apt 1R
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from south at west
May 4, 2022 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from south at west
May 4, 2022 · Apt 1R
Closed — Violation dismissed
Show 39 more ↓
- ANon-hazardous
Refit entrance door in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
May 4, 2022 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 1, 2022
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west
Sep 2, 2020 · Apt 3L
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Aug 19, 2020
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 19, 2020
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 19, 2020
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective intercom system from building front to panel at east wall in the foyer located at apt 3l, 3rd story, 1st apartment from south at west
Aug 19, 2020 · Apt 3L
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3l, 3rd story, 1st apartment from south at west
Aug 19, 2020 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3l, 3rd story, 1st apartment from south at west
Aug 19, 2020 · Apt 3L
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the ceramic tile surface and grouted joints of visible mold, all walls at bathtub in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west
Aug 19, 2020 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches at air shaft, 1st story
Aug 17, 2020
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice at air shaft, 1st story
Aug 17, 2020
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 17, 2020
Open — Not complied with - CImmediately hazardous
Arrange and make self-closing the doors , secondary entrance door at south in the 1st room from north located at apt 3l, 3rd story, 1st apartment from east at south
Aug 9, 2020 · Apt 3L
Closed — Violation closed - BHazardous
Repair or replace the smoke detector , defective in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south
Aug 9, 2020 · Apt 3L
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). , defective in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south
Aug 9, 2020 · Apt 3L
Closed — Violation closed - BHazardous
Replace with new the broken or defective knobs at shower in tub in the bathroom located at apt 3l, 3rd story, 1st apartment from east at south
Jul 13, 2020 · Apt 3L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south
Jul 13, 2020 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south
Jul 13, 2020 · Apt 3L
Open — Invalid certification - BHazardous
Properly repair the broken or defective electrical switchs in the 3rd room from north located at apt 3l, 3rd story, 1st apartment from east at south
Jul 13, 2020 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south
Jul 13, 2020 · Apt 3L
Closed — Violation closed - BHazardous
Repair the broken or defective connection at waste line at sink in the kitchen located at apt 3l, 3rd story, 1st apartment from east at south
Jul 13, 2020 · Apt 3L
Closed — Violation closed - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south
Jul 13, 2020 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south
Jul 13, 2020 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Refit door in the entrance located at apt 3l, 3rd story, 1st apartment from south at west
May 9, 2018 · Apt 3L
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors , in the entrance located at apt 3l, 3rd story, 1st apartment from south at west
May 9, 2018 · Apt 3L
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west
May 9, 2018 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from east located at apt 1r, 1st story, 1st apartment from south at west
Apr 4, 2017 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 28, 2016
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required, light fixture present
Jul 27, 2014
Closed — Violation dismissed - BHazardous
Fire egress defective. restore egress by removing locking device and arrange to open readily the gate in fence at lot line rear yard
Apr 8, 2014
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of expose electrical wiring on ceiling at basement
Mar 25, 2014
Closed — Violation dismissed - BHazardous
Replace with new the missing cover plate at electrical box at ceiling at basement
Mar 25, 2014
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material on ceiling at basement
Mar 25, 2014
Closed — Violation dismissed - BHazardous
Fire egress defective. remove the obstruction in fireproof passageway padlock on steelway cellar doors at basement
Mar 25, 2014
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at public hall stairs, 1st story
Mar 25, 2014
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at south located at apt 1r, 1st story, 1st apartment from south at west
Mar 25, 2014 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at south located at apt 1r, 1st story, 1st apartment from south at west
Mar 25, 2014 · Apt 1R
Closed — Violation dismissed - BHazardous
Provide an adequate supply of gas to the fixtures , in the kitchen located at apt 3l, 3rd story, 1st apartment from south at west
Mar 25, 2014 · Apt 3L
Closed — Violation closed
DOB building violations · 9
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
ECB violations · 4
- Class - 2
Found weil mclain boiler ,model# egh95. boiler inoperable. correct violating conditions and submit a certificate of correction.
Nov 13, 2024 · Penalty $625
Active - Class - 3
Weilmclain egh-95 boiler=fresh air louver screen hanging loose/hwh flue has incorrect support;correct violation and submit the certificate of correction
Jan 4, 2024
Resolve - Class - 3
In apt 1r=radiator shutoff valve defective and leaking @kitchen + @ master bedroom, maintain boiler; correct violation and submit the certificate of correction
Jan 4, 2024
Resolve - Non-hazardous
Failure to maintian building. defect is, side valt area approx 15" wide by s' is missing and in cellar below. remedy; make all repairs.
Sep 15, 2002
Resolve
Complaints
- Appliance
Refrigerator
Sep 3, 2026 · Apt 2L
Open - Heat/hot water
Entire building
Jul 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 29, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Nov 14, 2024 · Apt BLDG
Close - General
Cooking gas
Nov 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2024 · Apt 2R
Close - Heat/hot water
Entire building
Nov 12, 2024 · Apt BLDG
Close - General
Cooking gas
Nov 12, 2024 · Apt BLDG
Close - Water leak
Slow leak
Jan 22, 2024 · Apt 1R
Close - Plumbing
Steam pipe/riser
Jan 2, 2024 · Apt 2R
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
May 17, 2023 · Apt 1R
Close - Heat/hot water
Entire building
Apr 25, 2023 · Apt BLDG
Close - Paint/plaster
Wall
Apr 17, 2023 · Apt 1R
Close - Door/window
Door frame
Apr 17, 2023 · Apt 1R
Close - Paint/plaster
Cabinet
Apr 17, 2023 · Apt 1R
Close - Unsanitary condition
Pests
Apr 17, 2023 · Apt 1R
Close - Plumbing
Basin/sink
Apr 17, 2023 · Apt 1R
Close - Paint/plaster
Wall
Jan 11, 2023 · Apt 3L
Close - General
Cabinet
Jan 11, 2023 · Apt 3L
Close - Appliance
Electric/gas range
Jan 11, 2023 · Apt 3L
Close - Plumbing
Basin/sink
Dec 12, 2022 · Apt 3L
Close - Electric
Outlet/switch
Dec 12, 2022 · Apt 3L
Close - Appliance
Electric/gas range
Dec 12, 2022 · Apt 3L
Close - Unsanitary condition
Garbage/recycling storage
Dec 12, 2022 · Apt 3L
Close - Unsanitary condition
Pests
Dec 12, 2022 · Apt 3L
Close - General
Bell/buzzer/intercom
Dec 12, 2022 · Apt 3L
Close - Heat/hot water
Apartment only
Oct 23, 2022 · Apt 3L
Close - Electric
Wiring
Aug 10, 2022 · Apt 2R
Close - Unsanitary condition
Pests
May 8, 2022 · Apt 3L
Close - Water leak
Heavy flow
Apr 29, 2022 · Apt 1R
Close - Door/window
Door frame
Apr 29, 2022 · Apt 1R
Close - Paint/plaster
Ceiling
Apr 29, 2022 · Apt 1R
Close - Door/window
Door
Apr 29, 2022 · Apt 1R
Close - Heat/hot water
Entire building
Mar 28, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 19, 2022 · Apt 1R
Close - Heat/hot water
Entire building
Feb 18, 2022 · Apt BLDG
Close - Water leak
Heavy flow
Nov 29, 2021 · Apt 2R
Close - Electric
Power outage
Jan 16, 2021 · Apt 3L
Close - Electric
Outlet/switch
Aug 3, 2020 · Apt 3L
Close - Door/window
Door
Aug 3, 2020 · Apt 3L
Close - Plumbing
Bathtub/shower
Aug 3, 2020 · Apt 3L
Close - Plumbing
Toilet
Aug 3, 2020 · Apt 3L
Close - Door/window
Window frame
Aug 3, 2020 · Apt 3L
Close - Paint/plaster
Wall
Aug 3, 2020 · Apt 3L
Close - Flooring/stairs
Floor
Aug 3, 2020 · Apt 3L
Close - Plumbing
Basin/sink
Aug 3, 2020 · Apt 3L
Close - Unsanitary condition
Pests
Jul 7, 2020 · Apt 3L
Close - Electric
Outlet/switch
Jul 7, 2020 · Apt 3L
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Nov 10, 2025 | $1,800,000 | Rentals - 4-10 unit | 6 |
Building details
- Building type
- Mixed residential and retail building (S5)
- Year built
- 1910
- Floors
- 3
- Residential units
- 5
- Building area
- 5,127 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1651 / 42
- Assessed value
- $555,300
- Landmark / historic district
- No
HPD registration #312735, last renewed Oct 1, 2025.
Questions about 208 Malcolm X Boulevard
Who owns 208 Malcolm X Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 208 Mx Square LLC.
Does 208 Malcolm X Boulevard have violations?
Yes. NYC HPD has recorded 49 housing violations at this property.
Is 208 Malcolm X Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 208 Malcolm X Boulevard built?
City records list 1910 as the year it was built.
How many apartments are in 208 Malcolm X Boulevard?
It has 5 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.