922 Dekalb Avenue
Brooklyn, NY 11221BBL 3-01601-0014Map
Owner of record: 922 Dekalb Ave LLC
922 Dekalb Avenue is an elevator apartment building built in 2020 in Brooklyn, 11221. It has 10 residential units across 5 floors. The owner of record is 922 Dekalb Ave LLC. HPD has no housing violations on record for this property. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 0
- DOB violations
- 0
- ECB violations
- 20
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 0
No DOB violations on record
ECB violations · 20
- Class - 1
Unlawfully continued work while on notice of a stop work order. at thetime of inspection of 6 sty nb,observed supported scaffold installed at exp#1 w/2 workers using it to perform facade work upon review that
Mar 10, 2021 · Penalty $12,500
Resolve - Class - 1
Work does not conform to approved construction document and/or amendents-pipe scaffold plans expo1&3 at time of inspectio at a 5 story nb,i observed workers working on a pipe scaffold that was not build to appr
Nov 27, 2020 · Penalty $625
Resolve - Class - 1
3301.1.3 manufacturer specifications(pipe scaffold)at time of inspection at a 5 story nb,i observed workers working on a pipe scaffold expo 1&3 and pump jack scaffold on expo4 not built to manufacturer specific
Nov 27, 2020
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.at time of inspection at a 6 story nb,i observed on an active jobsite large amounts of debris and material on exterior setback/roofs and proper
Nov 27, 2020 · Penalty $1,250
Resolve - Class - 2
3307.4.7 work or storage zones(area not closed with a fence in accordance with section 3307.7)at time of inspection at a 6 story nb,i observed cherry picker/ariel lift in the public street with yodocks without
Nov 27, 2020
Resolve - Class - 1
Failure to maintain/display on site documents required by chapter 33. at time of inspection of a proposed 6 sty new bldg under construction i observed structural steel w/welding & bolting throughout. upon reque
Jun 9, 2020
Resolve - Class - 1
Failure to maintain/display on site documents required by chapter 33 at time of inspection of a proposed 6 sty new bldg under construction,i observed a cable system attached to steel posts w/a self retracting
Jun 9, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-guardrails. at time of inspection of a proposed 6 sty new bldg under construction,i observed a lack of a proper guardrails or ve
Jun 9, 2020
Resolve - Class - 1
Work does not conform to approved construction documents &/or approvedamendments at time of inspection of a proposed 6 sty new bldg under construction,i observed temporary platforms in the elevator shaft. upon
Jun 9, 2020
Resolve - Class - 2
Sec. 3303.2.2 fire hydrant use w/o obtaining authorization from appropriate agency. at time of inspection active job site at 2nd fl level. observed fire hydrant used by construction site as a water supply. upon
May 12, 2020
Resolve
Show 10 more ↓
- Class - 2
Work does not conform to approved construction documents &/or approved amendments. at time of inspection active job site observed: cmu wall contrary to approved drawings there were no rebars #5 every 16" as sho
May 12, 2020
Resolve - Class - 2
Construction superintendent fails perform duties as required. the following unsafe/violating conditions were observed on this date w/stop work order issued: 1)work does not conform approved drawings at cmu wall
May 12, 2020
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments at make shift platform at elevator shaft area. at time of inspection active job site at 2nd fl level observed make shift platform
May 12, 2020
Resolve - Class - 2
Work does not conform site safety plan. at time of inspection active jobsite 2nd fl level observed: work does not conform site safety plan. there is no roof protection at exp#4,storage area exp#1 yudok system
May 12, 2020
Resolve - Class - 2
Failure to provide special inspections tr-1 statement of responsability for steel details. at the of inspection active job site at 2nd fl level upon revised on system & request for tr-1 for steel details none
May 12, 2020
Resolve - Class - 1
Sec. bc3307.4 imadequate work & storage zone. at time of inspection ofa 6 sty nb currently at 2nd fl i observed construction materials delivery in progress at roadway exp#1 adjacent to sidewalk shed & there wer
May 7, 2020 · Penalty $625
Resolve - Class - 1
Sec. 3307.2.1 failure to comply w/dot regulations-no dot permit. at time of inspection of a 6 sty nb currently at 2nd fl i observed construction materials delivery in progress at roadway exp#1 boom truck obstru
May 7, 2020
Resolve - Class - 2
Failure to provide/accepted construction drawing at the job site at time of inspeciton to noted at time of my inspection observed foundationcable and footing builded on engineering for the set of approved drawi
Jan 31, 2020
Resolve - Class - 1
Failure to notify the department piror to the commencement of earth work note at the time of my inspection of a 6 story building at excavation phase constrcution work in progress upon request of notfication nu
Sep 4, 2019
Resolve - Class - 1
Failure to protetc adjoining structure during excavation operations note at time of my inspection of a 6 story building at excavation level observed at exposure #2 the excavation below the foundation of the bui
Sep 4, 2019
Resolve
Complaints
- Plumbing
Water supply
Jun 29, 2026 · Apt 4A
Close - General
Signage missing
Jan 13, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2020
- Floors
- 5
- Residential units
- 10
- Building area
- 9,811 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1601 / 14
- Assessed value
- $1,287,900
- Landmark / historic district
- No
HPD registration #390110, last renewed Jul 23, 2025.
Questions about 922 Dekalb Avenue
Who owns 922 Dekalb Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 922 Dekalb Ave LLC.
Does 922 Dekalb Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 922 Dekalb Avenue rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 30% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 922 Dekalb Avenue built?
City records list 2020 as the year it was built.
How many apartments are in 922 Dekalb Avenue?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.