355 Stockton Street
Brooklyn, NY 11206BBL 3-01582-0001Map
Owner of record: 355 Stockton LLC
355 Stockton Street is a walk-up apartment building built in 1931 in Brooklyn, 11206. It has 6 residential units across 4 floors. The owner of record is 355 Stockton LLC. HPD has recorded 25 housing violations here, most recently on August 2, 2026. 8 of the 25 most recent violations are still open.
- HPD violations
- 25
- DOB violations
- 16
- ECB violations
- 11
- HPD complaints
- 29
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 25
- CImmediately hazardous
Properly repair or replace the broken or defective glass pane at building front entrance door , 1st story
Aug 2, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Apr 15, 2026 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 3rd room from east located at apt 1b, 1st story, 1st apartment from north at east
Apr 15, 2026 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling. in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east
Feb 14, 2026 · Apt 3C
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2024
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 22, 2024
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at upper sash at 2nd window from east at public hall, 1st story
Aug 22, 2024
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of permanently installed kickdown door stopper at building entrance door
Aug 22, 2024
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at building front yard
Aug 22, 2024
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective glass mirror, 1st from north at east wall at public hall, 1st story
Aug 22, 2024
Open — Nov sent out
Show 15 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 27, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 13, 2021
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the 1st room from east located at apt 1a, 1st story, 1st apartment from south at west
Nov 13, 2020 · Apt 1A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... window frame, apprx, one sq ft at west wall in the 1st room from east located at apt 1a, 1st story, 1st apartment from east at south
Nov 13, 2020 · Apt 1A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from south at west
Nov 13, 2020 · Apt 1A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... window frame, apprx, one sq ft at west wall in the 1st room from east located at apt 1a, 1st story, 1st apartment from east at south original violation 13897985 issued 13-nov-20 has been upgraded to class b per administrative code ''''27-2017.3a(3)(a) or (b).
Nov 13, 2020 · Apt 1A
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at basement
Feb 20, 2019
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at basement
Feb 20, 2019
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on 2nd story, 3rd story and 4th story balconies at fire escape southeast 1
Feb 20, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jun 12, 2017
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jun 12, 2017
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of bike at public hall, 1st story
Jun 12, 2017
Open — Not complied with - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 9, 2017
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from east located at apt 1a, 1st story, 1st apartment from south at west
Feb 22, 2017 · Apt 1A
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 25, 2015
Closed — Violation dismissed
DOB building violations · 16
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 6, 2011
Dob violation - dismissed - Construction other optional
Due to fire, fire fighting operations bldg. sustained major damage to all windows lintels, heavy on fl. and roof joists, water and smoke dam age throughout.exp. 4 parapet wall has appx. 2 x 3 separation at top o f wall throughout parapet wall. provide dob with eng. report
Jan 28, 2011
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Jan 2, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed
Show 6 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 11
- Class - 2
Ao smith gpvx-75l-310 gas hot water heater has been installed without a dob permit, obtain all permits; correct violation+submit certificate of correction
Jun 24, 2025 · Penalty $1,250
Active - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#39009789k issued on 9/20/2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit.r
Feb 10, 2021
Resolve - Class - 1
Failure to comply with commissioners order contained in summons/violation #39009789k issued on 09-20-2019,and to file a certificate of correction pursuant to 28-201.1 and 1 rcny 102-01.premises 4 story with cel
Mar 2, 2020
Resolve - Class - 1
Failure to notify the dept prior to the commencement of earthwork. at time of inspection of a 4 sty occupied bldg i observed approx 30ft x 4ft x 8ft deep excavation at exp#3 in adjacent property driveway(11 lew
Sep 24, 2019
Resolve - Class - 1
Failure to institute/maintain safety equipment measures-no guardrails. at time of inspection of a 4 sty occupied bldg i observed approx 30ft x 4ft x 8ft deep excavation at exp#3 in adjacent property driveway
Sep 24, 2019
Resolve - Class - 1
Faillure to protect adjoining structures during excavation operations.at time of inspection of a 4 sty occupied bldg i observed approx 30ft x 4ft x 8ft deep excavation at exp#3 in adjacent property driveway(11
Sep 24, 2019
Resolve - Class - 1
Failure to provide protection at sides of excavation. at time of inspection of a 4 sty occupied bldg i observed approx 30ft x 4ft x 8ft deepexcavation at exp#3 in adjacent property driveway(11 lewis ave)& no sh
Sep 24, 2019
Resolve - Class - 1
Premises 4-story with cellar detached masonry frame building. observed approx. 30'-0" x 4'-0" and 8'-0" deep soil excavated without permit along expo # 03 foundation wall in adjacent vacant building ( 11 lewis
Sep 20, 2019
Resolve - Class - 2
Sdwlk shed does not meet code specificaions.noted:shed erected under permit#32028835y,has missing parapets,post leaning out of plumb @ exp#2.rem:conform t code specifications
Jun 15, 2011 · Penalty $2,400
Resolve - Class - 1
Unlawful acts. failure to comply w/an order of commissioner. respondent failed to correct violating conditions cited in the prior nov #320211837r. remedy: comply w/commissioner's order.
Mar 10, 2011
Resolve
Show 1 more ↓
- Class - 1
Failure to safeguard all persons & property affected by construction operations.job#320211837 issued 1/4/11 for the rehabilitation & repairs to existing 12fam dwelling.defects noted:while performing work under
Jan 28, 2011
Resolve
Complaints
- Plumbing
Toilet
Oct 17, 2026 · Apt 1C
Open - Plumbing
Toilet
Oct 17, 2026 · Apt 1C
Open - Heat/hot water
Entire building
Feb 18, 2026 · Apt 1B
Close - General
Cooking gas
Feb 18, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Feb 18, 2026 · Apt 1B
Close - Water leak
Slow leak
Feb 18, 2026 · Apt 1B
Close - Plumbing
Water supply
Feb 9, 2026 · Apt 1B
Close - Plumbing
Water supply
Feb 9, 2026 · Apt 1B
Close - Water leak
Heavy flow
Jan 28, 2026 · Apt 3C
Close - Unsanitary condition
Mold
Jan 28, 2026 · Apt 3C
Close
Show 19 more ↓
- Unsanitary condition
Pests
Jan 28, 2026 · Apt 3C
Close - Plumbing
Water supply
Apr 19, 2025 · Apt 2B
Close - Plumbing
Basin/sink
Apr 19, 2025 · Apt 2B
Close - Plumbing
Toilet
Apr 19, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Mar 24, 2025 · Apt 2B
Close - Unsanitary condition
Garbage/recycling storage
Feb 12, 2024 · Apt BLDG
Close - Water leak
Slow leak
Jul 19, 2022 · Apt 1B
Close - Unsanitary condition
Pests
Jul 19, 2022 · Apt 1B
Close - Water leak
Slow leak
Jul 2, 2022 · Apt 1B
Close - Water leak
Slow leak
Jun 28, 2022 · Apt 1C
Close - Plumbing
Water supply
May 15, 2022 · Apt 4B
Close - Plumbing
Water supply
May 9, 2021 · Apt BLDG
Close - Water leak
Heavy flow
Oct 29, 2020 · Apt 1A
Close - Unsanitary condition
Mold
Oct 29, 2020 · Apt 1A
Close - Water leak
Heavy flow
Jan 27, 2019 · Apt 1A
Close - Heat/hot water
Entire building
Sep 20, 2018 · Apt BLDG
Close - Plumbing
Basin/sink
Nov 1, 2017 · Apt 1A
Close - Heat/hot water
Entire building
May 8, 2017 · Apt 1A
Close - Water leak
Slow leak
Oct 25, 2016 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 4
- Residential units
- 6
- Building area
- 8,140 ft²
- Lot area
- 2,600 ft²
- Zoning
- C4-4L
- Community board
- 303
- Council district
- 36
- Block / lot
- 1582 / 1
- Assessed value
- $896,400
- Landmark / historic district
- No
HPD registration #366323, last renewed Aug 8, 2025.
Questions about 355 Stockton Street
Who owns 355 Stockton Street?
The owner of record in NYC Department of City Planning PLUTO data is 355 Stockton LLC.
Does 355 Stockton Street have violations?
Yes. NYC HPD has recorded 25 housing violations at this property.
Is 355 Stockton Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 355 Stockton Street built?
City records list 1931 as the year it was built.
How many apartments are in 355 Stockton Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.