roofy

431 Marion Street

Brooklyn, NY 11233BBL 3-01516-0045Map

Owner of record: Beyond Limits INC.

431 Marion Street is a walk-up apartment building built in 1912 in Brooklyn, 11233. It has 6 residential units across 3 floors. The owner of record is Beyond Limits INC.. HPD has recorded 99 housing violations here, most recently on May 5, 2026. 7 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.

HPD violations
99
DOB violations
21
ECB violations
3
HPD complaints
251

What to know

Concern
6 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 5, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
6
About 100% of the building's 6 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 99

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 5, 2026

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 10, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 11, 2024

    Closed — Violation dismissed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall in the private hallway located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the private hallway located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... on ceiling (approx 6 sq ft) in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective counter balance at lower sash window, 1st from east at south wall in the 6th room from north located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation dismissed
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation dismissed
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at and saddle in the entrance located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges on door in the entrance located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Open — Nov certified late
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective knob assembly on door in the entrance located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the private hallway located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall in the private hallway located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north, the 1st room from north, the foyer , the 6th room from north, the kitchen , the 5th room from north located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 19, 2023 · Apt 2R

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approx 2sq ft at windows sides at north in the 1st room from north located at apt 2r, 2nd story, 1st apartment from west at north

    Jun 20, 2023 · Apt 2R

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... approx 2sq ft at windows sides at north in the 1st room from north located at apt 2r, 2nd story, 1st apartment from west at north original violation 16048739 issued 20-jun-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jun 20, 2023 · Apt 2R

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 2r, 2nd story, 1st apartment from west at north

    Jun 20, 2023 · Apt 2R

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Jun 20, 2023 · Apt 2R

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north

    Jun 20, 2023 · Apt 2R

    Open — Nov certified late
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Jun 20, 2023 · Apt 2R

    Open — Notice of issuance sent to tenant
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 23, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 1, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 12, 2021

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story

    Jan 31, 2015

    Open — Nov sent out
  • A

    Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Jan 31, 2015

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jan 31, 2015

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Jan 31, 2015

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Jan 31, 2015

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective located at apt 1r, 1st story, 1st apartment from north at east

    Jan 31, 2015 · Apt 1R

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west

    Oct 11, 2012 · Apt 1L

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperable located at apt 1r, 1st story, 1st apartment from north at east

    Aug 22, 2012 · Apt 1R

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from north at east

    Aug 22, 2012 · Apt 1R

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster at ceiling (approx. 10 square feet) in the bathroom located at apt 1r, 1st story, 1st apartment from north at east

    Aug 22, 2012 · Apt 1R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor at public hall, 1st story

    Aug 22, 2012

    Closed — Violation closed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling apprx. 20 square feet in the bathroom located at apt 1r, 1st story, 1st apartment from north at east

    Aug 22, 2012 · Apt 1R

    Closed — Violation closed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at east wall approx. 10 square feet in the private hallway located at apt 1r, 1st story, 1st apartment from north at east

    Aug 22, 2012 · Apt 1R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the private hallway located at apt 1r, 1st story, 1st apartment from north at east

    Aug 22, 2012 · Apt 1R

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 1r, 1st story, 1st apartment from north at east

    Aug 22, 2012 · Apt 1R

    Closed — Violation closed
  • B

    Properly repair the broken or defective inoperable mortise lock on door from street to vestibule . at public hall, 1st story

    Aug 30, 2011

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the private hallway , the 6th room from north, the 2nd room from north, the 1st room from north, the kitchen , the bathroom located at apt 1l, 1st story, 1st apartment from south at west

    Aug 30, 2011 · Apt 1L

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice located at apt 1l, 1st story, 1st apartment from south at west

    Aug 30, 2011 · Apt 1L

    Closed — Violation closed

DOB building violations · 21

  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 28, 2011

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 28, 2011

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
Show 11 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 3

  • Class - 1

    B101/50a/50b/50a-no work permit filed w/dob for the replacement used boiler/50b-work w/o a permit 28-105.1

    Nov 1, 2010 · Penalty $1,600

    Active
  • Class - 1

    B154,51,32,6a,3b,40a,44a,38,5a,15,50a,b,c,d,e,f. 50a- draft slat missing. 50d- no lights. 50b- flue pipe needs support 50c- chimney base clogged (fumes hazardous) 50e- no mixing valve on coil. 50f- pipe safety

    Oct 25, 2010 · Penalty $1,000

    Active
  • Hazardous

    Failure to maintain building hazardous floor above cellar is sinking due to several broken joists and rotted beams there is no support under the joists and beams, and the floor is bouneing when walked on. remed

    May 2, 2002 · Penalty $2,500

    Active

Complaints

  • Water leak

    Slow leak

    Mar 4, 2026 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Sep 14, 2023 · Apt 2R

    Close
  • Appliance

    Refrigerator

    Sep 14, 2023 · Apt 2R

    Close
  • Door/window

    Door

    Sep 14, 2023 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Sep 14, 2023 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Sep 14, 2023 · Apt 2R

    Close
  • Door/window

    Door

    Jun 15, 2023 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Jun 15, 2023 · Apt 2R

    Close
  • Plumbing

    Radiator

    Jun 15, 2023 · Apt 2R

    Close
  • Door/window

    Window frame

    Jun 15, 2023 · Apt 2R

    Close
Show 40 more ↓
  • Appliance

    Refrigerator

    Jun 15, 2023 · Apt 2R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Feb 21, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 7, 2019 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2017 · Apt 1R

    Close
  • Electric

    Wiring

    Nov 15, 2016 · Apt 1L

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Nov 15, 2016 · Apt 1L

    Close
  • Safety

    Fire escape

    Nov 15, 2016 · Apt 1L

    Close
  • Safety

    Fire escape

    Nov 15, 2016 · Apt 1L

    Close
  • Safety

    Fire escape

    Nov 15, 2016 · Apt 1L

    Close
  • Safety

    Window guard broken/missing

    Nov 15, 2016 · Apt 1L

    Close
  • Safety

    Smoke detector

    Nov 15, 2016 · Apt 1L

    Close
  • Safety

    Smoke detector

    Jan 28, 2015 · Apt 1R

    Close
  • Safety

    Smoke detector

    Jan 28, 2015 · Apt 1L

    Close
  • Heat/hot water

    Entire building

    Nov 4, 2014 · Apt 1L

    Close
  • Heat/hot water

    Apartment only

    Nov 4, 2014 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Nov 4, 2014 · Apt 1L

    Close
  • Heating

    Heat related

    Nov 20, 2013 · Apt 2R

    Close
  • Heating

    Heat related

    Oct 22, 2013 · Apt 2R

    Close
  • Heating

    Heat related

    Mar 21, 2013 · Apt 1L

    Close
  • General

    Floor

    Mar 13, 2013 · Apt 1L

    Close
  • Paint/plaster

    Ceiling

    Mar 13, 2013 · Apt 1L

    Close
  • General

    Ceramic-tile

    Mar 13, 2013 · Apt 1L

    Close
  • General

    Floor

    Mar 13, 2013 · Apt 1L

    Close
  • General

    Floor

    Mar 13, 2013 · Apt 1L

    Close
  • General

    Ceramic-tile

    Mar 13, 2013 · Apt 1L

    Close
  • Nonconst

    Vermin

    Mar 13, 2013 · Apt 1L

    Close
  • Nonconst

    Smoke detector

    Dec 12, 2012 · Apt 3R

    Close
  • General

    Mold

    Dec 12, 2012 · Apt 3R

    Close
  • Nonconst

    Carbon monoxide

    Dec 12, 2012 · Apt 3R

    Close
  • Heating

    Heat related

    Nov 7, 2012 · Apt 3R

    Close
  • Heating

    Heat related

    Nov 4, 2012 · Apt 3R

    Close
  • Heating

    Heat related

    Nov 2, 2012 · Apt 3R

    Close
  • Heating

    Heat related

    Oct 31, 2012 · Apt BLDG

    Close
  • Heating

    Heat related

    Oct 10, 2012 · Apt 3L

    Close
  • Heating

    Heat related

    Oct 10, 2012 · Apt 3L

    Close
  • Plumbing

    Radiator

    Sep 15, 2012 · Apt 1L

    Close
  • Plumbing

    Radiator

    Sep 15, 2012 · Apt 1L

    Close
  • Plumbing

    Radiator

    Sep 15, 2012 · Apt 1L

    Close
  • Plumbing

    Radiator

    Sep 15, 2012 · Apt 1L

    Close
  • General

    Mold

    Aug 10, 2012 · Apt 1R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1912
Floors
3
Residential units
6
Building area
5,400 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
316
Council district
41
Block / lot
1516 / 45
Assessed value
$470,250
Landmark / historic district
No

HPD registration #364294, last renewed Aug 18, 2025.

Questions about 431 Marion Street

Who owns 431 Marion Street?

The owner of record in NYC Department of City Planning PLUTO data is Beyond Limits INC..

Does 431 Marion Street have violations?

Yes. NYC HPD has recorded 99 housing violations at this property.

Is 431 Marion Street rent stabilized?

NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 431 Marion Street built?

City records list 1912 as the year it was built.

How many apartments are in 431 Marion Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.