roofy

867 Halsey Street

Brooklyn, NY 11233BBL 3-01491-0040Map

Owner of record: Halsey Brothers LLC

867 Halsey Street is a walk-up apartment building built in 1910 in Brooklyn, 11233. It has 6 residential units across 3 floors. The owner of record is Halsey Brothers LLC. HPD has recorded 24 housing violations here, most recently on September 12, 2026. 1 of the 24 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.

HPD violations
24
DOB violations
17
ECB violations
10
HPD complaints
255

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Sep 12, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
6
About 100% of the building's 6 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 24

  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Sep 12, 2026

    Open — Nov certified on time
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west

    Sep 4, 2025 · Apt 1L

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west

    Sep 4, 2025 · Apt 1L

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective caulking at bathtub in the bathroom located at apt 1l, 1st story, 1st apartment from south at west

    Sep 4, 2025 · Apt 1L

    Closed — Violation dismissed
  • B

    Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 1l, 1st story, 1st apartment from south at west

    Sep 4, 2025 · Apt 1L

    Closed — Violation dismissed
  • B

    Refit at door in the entrance located at apt 1l, 1st story, 1st apartment from south at west

    Sep 4, 2025 · Apt 1L

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Sep 28, 2021 · Apt 2R

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at basement

    Sep 28, 2021

    Closed — Violation dismissed
  • I

    The premises has been selected to participate in the alternative enforcement program which may result in building-wide inspections, fees, and extensive repair work to correct violations and underlying conditions. charges for repair work done pursuant to this order, if not paid, will become liens on the property

    Jan 31, 2012

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north at west located at apt 3, 3rd story, 1st apartment from north at east

    Sep 8, 2011 · Apt 3

    Closed — Violation closed
Show 14 more ↓
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from north at east wall in the 2nd room from north at west located at apt 3, 3rd story, 1st apartment from north at east

    Sep 8, 2011 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at east wall, 1st door frame from west at north wall, 2nd door frame from west at north wall, 1st window frame from east at south wall, 1st window frame from south at west wall in the 4th room from north at east located at apt 3, 3rd story, 1st apartment from north at east

    Sep 8, 2011 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at north wall in the 3rd room from north at east located at apt 3, 3rd story, 1st apartment from north at east

    Sep 8, 2011 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from east at south wall in the 3rd room from north at west located at apt 3, 3rd story, 1st apartment from north at east

    Sep 8, 2011 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st window frame from west at north wall, 2nd window frame from west at north wall in the kitchen located at apt 3, 3rd story, 1st apartment from north at east

    Sep 8, 2011 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 2nd window frame from west at north wall in the bathroom located at apt 3, 3rd story, 1st apartment from north at east

    Sep 8, 2011 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) south wall, 1st window frame from west at north wall in the 1st room from north at west located at apt 3, 3rd story, 1st apartment from north at east

    Sep 2, 2011 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from east at south wall in the 1st kitchen from north at east located at apt 3, 3rd story, 1st apartment from north at east

    Sep 2, 2011 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at east wall, baseboard at west wall, 1st door frame from west at north wall in the 4th room from north at east located at apt 3, 3rd story, 1st apartment from north at east

    Nov 28, 2010 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at east wall, baseboard at west wall, 1st closet from north at east wall door frame, 1st door frame from west at north wall in the 3rd room from north at west located at apt 3, 3rd story, 1st apartment from north at east

    Nov 28, 2010 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at west wall, 1st door frame from west at north wall, 1st door frame from east at south wall in the 3rd room from north at east located at apt 3, 3rd story, 1st apartment from north at east

    Nov 28, 2010 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north at west located at apt 3, 3rd story, 1st apartment from north at east

    Nov 28, 2010 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) ceiling, 1st riser from west at north wall, 1st window frame from west at north wall in the bathroom located at apt a1, 1st story, 1st apartment from north at east

    Sep 6, 2009 · Apt A1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) south wall, east wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 4th room from north located at apt a1, 1st story, 1st apartment from north at east

    Sep 6, 2009 · Apt A1

    Closed — Violation closed

DOB building violations · 17

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 2, 2012

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
Show 7 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 10

  • Class - 2

    Work does not conform to aproved plans and/or construction documents and/or approved amendments.1-rear yard deck(approx 20'x9'),concrete pads & finishes(a/c units)not shown on dwgs.2-roof plan & rear facade not

    Jul 31, 2012

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner. 1- front facademissing mortor 2- top exterior front facade & roof parapet (exp #4) concrete panel not secure to building - seperating from brick facade.

    Apr 26, 2012

    Resolve
  • Class - 2

    Fail to maintain bldg in code-compliant manner.1-front facade missing mortar.2-top extends-front facade & roof parapet(exp#4)concrete panel not secure to bldg-separating fr brick facade.3-exp#4-front chimney mi

    Apr 26, 2012

    Resolve
  • Class - 1

    Failure to maintain exterior bldg wall. at front 3rd flr heavy, large pcs of solid limestone are bulging and partially dislodged. separatingfrom primary wall approx 2 1/2" one a length of approx 4'x2'. other

    Feb 1, 2012 · Penalty $5,000

    Resolve
  • Class - 1

    Sec. 28-209.1. failure to comply w/commissioner's order to correct unlawful use or conditions. observed in basement reconnected gas piping from boiler/(hwh) line to tenant line and meter (apt #2). no actions

    Sep 29, 2010 · Penalty $8,000

    Resolve
  • Class - 1

    Work w/o permit observe in basement illegally reconnected gas piping from boiler/hwh line to tenant line (apt #2). pipes not property supported. no permit found on dob files,no test,inspection performed.

    Apr 7, 2010 · Penalty $8,000

    Resolve
  • Class - 1

    Failure to have new or altered plumbing system tested. observe in basement illegally reconnected gas piping from boiler.hwh line to tenant line (apt #2) pipes not properly supported. no permit found on dob file

    Apr 7, 2010 · Penalty $5,000

    Resolve
  • Class - 3

    Failure to maintain building in code-complaint manner. noted: 3 stories building found with cracks throughout 2nd flr apt & ceiling near sky light a 3rd flr. remedy: repair building.

    Apr 7, 2010 · Penalty $500

    Resolve
  • Class - 2

    Failure to maintain building walls. 3 stories building found with vertical crack. approx 1/2" x 5'h at south/east corner. front facade between 2nd flr & 3rd flr stories are bulging. remedy: maintain building

    Apr 6, 2010 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to maintain other bldg parts as noted:@ a four storied brick framed structure the leader is not connected to a sewer line, &/or has no drainage system to collect flow of water.note:condition exist on

    Jul 14, 2006 · Penalty $2,500

    Resolve

Complaints

  • Flooring/stairs

    Floor

    Aug 19, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Aug 6, 2026 · Apt 2R

    Close
  • Flooring/stairs

    Floor

    Aug 6, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Sep 2, 2025 · Apt 1L

    Close
  • Heat/hot water

    Apartment only

    Sep 28, 2021 · Apt 2R

    Close
  • Heating

    Heat related

    Dec 26, 2011 · Apt SUIT2

    Close
  • Nonconst

    Rubbish

    Dec 9, 2011 · Apt NA

    Close
  • General

    Doors

    Dec 9, 2011 · Apt NA

    Close
  • General

    Locks

    Dec 9, 2011 · Apt NA

    Close
  • General

    Locks

    Dec 9, 2011 · Apt NA

    Close
Show 40 more ↓
  • Nonconst

    Carbon monoxide

    Dec 6, 2011 · Apt 2L

    Close
  • Nonconst

    Carbon monoxide

    Dec 6, 2011 · Apt 2R

    Close
  • Nonconst

    Smoke detector

    Dec 6, 2011 · Apt 2L

    Close
  • Nonconst

    Smoke detector

    Dec 6, 2011 · Apt 2R

    Close
  • Nonconst

    Vermin

    Aug 31, 2011 · Apt 3

    Close
  • Heating

    Heat related

    Aug 31, 2011 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Aug 31, 2011 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Aug 31, 2011 · Apt 3

    Close
  • Heating

    Heat related

    Aug 24, 2011 · Apt 1B

    Close
  • Plumbing

    Water supply

    Aug 18, 2011 · Apt 3

    Close
  • Heating

    Heat related

    Jul 27, 2011 · Apt 3

    Close
  • Heating

    Heat related

    Jul 27, 2011 · Apt 3

    Close
  • Plumbing

    Sewer

    Jul 11, 2011 · Apt 2

    Close
  • Heating

    Heat related

    Jul 7, 2011 · Apt 3

    Close
  • Appliance

    Electric/gas range

    Jul 6, 2011 · Apt 2

    Close
  • Heating

    Heat related

    Jul 6, 2011 · Apt 1B

    Close
  • Heating

    Heat related

    Jul 1, 2011 · Apt 3

    Close
  • General

    Mold

    Jul 1, 2011 · Apt 3

    Close
  • Heating

    Heat related

    Jun 30, 2011 · Apt 3

    Close
  • Heating

    Heat related

    Jun 29, 2011 · Apt 1B

    Close
  • Heating

    Heat related

    Jun 24, 2011 · Apt 3

    Close
  • General

    Ventilation system

    Jun 23, 2011 · Apt 2

    Close
  • Plumbing

    Water supply

    Jun 23, 2011 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Jun 23, 2011 · Apt 2

    Close
  • Electric

    Bell-buzzer/intercom

    Jun 23, 2011 · Apt 2

    Close
  • General

    Mold

    Jun 23, 2011 · Apt 2

    Close
  • Electric

    Electric-supply

    May 25, 2011 · Apt 3

    Close
  • Electric

    Electric-supply

    May 25, 2011 · Apt SUIT2

    Close
  • Heating

    Heat related

    May 25, 2011 · Apt 3

    Close
  • Electric

    Electric-supply

    May 25, 2011 · Apt 1B

    Close
  • General

    Doors

    May 23, 2011 · Apt 2

    Close
  • General

    Mold

    May 23, 2011 · Apt 2

    Close
  • Electric

    Bell-buzzer/intercom

    May 23, 2011 · Apt 2

    Close
  • Nonconst

    Vermin

    May 23, 2011 · Apt 2

    Close
  • Nonconst

    Carbon monoxide

    May 23, 2011 · Apt 2

    Close
  • General

    Doors

    May 23, 2011 · Apt 2

    Close
  • Paint/plaster

    Wall

    May 23, 2011 · Apt 2

    Close
  • General

    Doors

    May 23, 2011 · Apt 2

    Close
  • Nonconst

    Smoke detector

    May 23, 2011 · Apt 2

    Close
  • General

    Floor

    May 23, 2011 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1910
Floors
3
Residential units
6
Building area
4,875 ft²
Lot area
2,500 ft²
Zoning
R6B
Community board
303
Council district
41
Block / lot
1491 / 40
Assessed value
$621,000
Landmark / historic district
No

HPD registration #382787, last renewed Jul 30, 2026.

Questions about 867 Halsey Street

Who owns 867 Halsey Street?

The owner of record in NYC Department of City Planning PLUTO data is Halsey Brothers LLC.

Does 867 Halsey Street have violations?

Yes. NYC HPD has recorded 24 housing violations at this property.

Is 867 Halsey Street rent stabilized?

NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 867 Halsey Street built?

City records list 1910 as the year it was built.

How many apartments are in 867 Halsey Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.