roofy

846 Monroe Street

Brooklyn, NY 11221BBL 3-01481-0026Map

Owner of record: 846 Monroe Residence LLC

846 Monroe Street is a walk-up apartment building built in 2017 in Brooklyn, 11221. It has 8 residential units across 4 floors. The owner of record is 846 Monroe Residence LLC. HPD has recorded 18 housing violations here, most recently on September 10, 2024. City tax records listed 3 rent-stabilized apartments here in 2024.

HPD violations
18
DOB violations
4
ECB violations
9
HPD complaints
11

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Sep 10, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
3
About 38% of the building's 8 apartments
Down from 5 in 2022

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 18

  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling at upper level in the bathroom located at apt 4b, 4th story, 2nd apartment from north at east

    Sep 10, 2024 · Apt 4B

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at 1st egress door from east at south in the 3rd room from east at south located at apt 4b, 4th story, 2nd apartment from north at east

    Sep 10, 2024 · Apt 4B

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at upper level in the bathroom located at apt 4b, 4th story, 2nd apartment from north at east

    Sep 10, 2024 · Apt 4B

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over the ceiling at upper level in the bathroom located at apt 4b, 4th story, 2nd apartment from north at east

    Sep 10, 2024 · Apt 4B

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hotwater exceeding the maximum temperature of 130 degrees at all hotwater fixtures in the entire apartment located at apt 4b, 4th story, 2nd apartment from north at east

    Sep 10, 2024 · Apt 4B

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective wood floor in the 2nd room from east at south located at apt 4b upper level, 4th story, 2nd apartment from north at east

    Sep 10, 2024 · Apt 4B

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from east at south located at apt 4b, 4th story, 2nd apartment from north at east

    Sep 10, 2024 · Apt 4B

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall in the 2nd room from east at south located at apt 4b, 4th story, 2nd apartment from north at east

    Sep 10, 2024 · Apt 4B

    Closed — Violation dismissed
  • A

    Properly repair the source and abate the evidence of a water leak at west wall in the 2nd room from east at south located at apt 4b, 4th story, 2nd apartment from north at east

    Sep 10, 2024 · Apt 4B

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at 2nd egress door from east at south in the 3rd room from east at south located at apt 4b, 4th story, 2nd apartment from north at east

    Sep 10, 2024 · Apt 4B

    Closed — Violation dismissed
Show 8 more ↓
  • B

    Properly repair with similar material the broken or defective wood floor in the 3rd room from east at south located at apt 4b, 4th story, 2nd apartment from north at east

    Sep 10, 2024 · Apt 4B

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    May 15, 2023

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    May 15, 2023

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    May 15, 2023

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    May 15, 2023

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    May 15, 2023

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    May 15, 2023

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    May 15, 2023

    Closed — Violation closed

DOB building violations · 4

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 6, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 6, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 6, 2017

    Dob violation - dismissed
  • Construction other optional

    Stop all c-joist placement and use of stairs on floors 4 to roof submit approved structural drawings and all special inspection reports to ceu, no later than 08/11/2017

    Jul 28, 2017

    Dob violation - dismissed

ECB violations · 9

  • Class - 2

    Failure to provide approved construction documents and/or approved amendments. nb-job #32136666p on and energy coe compliance inspection fails to provide approved construction documents. rem: provide plans. con

    Oct 18, 2017 · Penalty $250

    Resolve
  • Class - 1

    Bc3303.4.1.1/maintenance-tripping hazard;at time of inspection of proposed 4 story new building observed sidewalk that was rutted at front of fence(exp 1)creating a hazard to public for tripping falling creatin

    Aug 5, 2017 · Penalty $400

    Resolve
  • Class - 2

    Bc3301.7 .failure to provide p.e. design drawings.as noted:at time of inspection at an active construction site observed workers hoisting material to roof,using stairs without a lending.from roof to 4th floor.

    Jul 21, 2017 · Penalty $250

    Resolve
  • Class - 1

    Failrue to institute/maintain safety equipment measure on temporary construction-no guardrails.as noted:at time of inspection at an active construction site observed workers on roof level working on masonry.no

    Jul 21, 2017 · Penalty $1,200

    Resolve
  • Class - 1

    Sidewalk not maintained conisting of large holes,cracks & uneven voidsdue to construction activities creating a trip hazard for pedestrians. at the time of inspection,active job site,i observed that the sidewal

    Jun 5, 2017 · Penalty $400

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction no guardrails. at time of inspection of a 4 sty bldg at 4th fl level,active work site,i observed that there were no guardrails a

    Jun 5, 2017 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction. no handrails at time of inspection of a 4 sty bldg at 4thfl level was missing handrails creating a hazardous condition for work

    Jun 5, 2017 · Penalty $1,000

    Resolve
  • Class - 1

    Sec. 3309.10 failure to protect or adequately protect adjoining property during construction/demolition operation-no roof protection at timeof inspection of a 4 sty bldg at 4th fl level,active work site,i obser

    Jun 5, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3309.12 failure to protect or adequately protect adjoining properties during construction/demolition-no overhead protection at the time of inspection of a 4 sty bldg at 4th fl level,active job site. i obse

    Jun 5, 2017 · Penalty $1,600

    Resolve

Complaints

  • Door/window

    Door

    Apr 2, 2026 · Apt LOBBY

    Close
  • Unsanitary condition

    Mold

    Aug 31, 2024 · Apt 4B

    Close
  • Water leak

    Slow leak

    Aug 2, 2024 · Apt 3B

    Close
  • Paint/plaster

    Wall

    Aug 2, 2024 · Apt 3B

    Close
  • Water leak

    Slow leak

    Aug 2, 2024 · Apt 3B

    Close
  • Paint/plaster

    Wall

    Aug 2, 2024 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Sep 23, 2023 · Apt 3A

    Close
  • Water leak

    Slow leak

    Sep 23, 2023 · Apt 3A

    Close
  • Safety

    Carbon monoxide detector

    Jan 16, 2023 · Apt 1S

    Close
  • General

    Ventilation system

    Jan 16, 2023 · Apt 1S

    Close
Show 1 more ↓
  • General

    Cooking gas

    Jan 16, 2023 · Apt 1S

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
2017
Floors
4
Residential units
8
Building area
7,276 ft²
Lot area
2,775 ft²
Zoning
R6B
Community board
303
Council district
41
Block / lot
1481 / 26
Assessed value
$669,600
Landmark / historic district
No

HPD registration #390065, last renewed Sep 4, 2025.

Questions about 846 Monroe Street

Who owns 846 Monroe Street?

The owner of record in NYC Department of City Planning PLUTO data is 846 Monroe Residence LLC.

Does 846 Monroe Street have violations?

Yes. NYC HPD has recorded 18 housing violations at this property.

Is 846 Monroe Street rent stabilized?

NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 38% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 846 Monroe Street built?

City records list 2017 as the year it was built.

How many apartments are in 846 Monroe Street?

It has 8 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.