2041 Pacific Street
Brooklyn, NY 11233BBL 3-01431-0037Map
Owner of record: NYC Pact Preservation Partners LLC
2041 Pacific Street is a walk-up apartment building built in 1910 in Brooklyn, 11233. It has 48 residential units across 4 floors. The owner of record is NYC Pact Preservation Partners LLC. HPD has recorded 105 housing violations here, most recently on April 5, 2026. 5 of the 50 most recent violations are still open.
- HPD violations
- 105
- DOB violations
- 13
- ECB violations
- 4
- HPD complaints
- 92
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 105
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from north located at apt 3l, 3rd story, 2nd apartment from south at west
Apr 5, 2026 · Apt 3L
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked celler at boiler room
Apr 5, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1j, 1st story, 1st apartment from north at east
Apr 5, 2026 · Apt 1J
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule entrance , 1st story
Dec 8, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 3f, 3rd story, 1st apartment from north at east
Nov 30, 2025 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door
Nov 30, 2025
Open — Violation will be reinspected - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door
Nov 30, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door , 1st story
Nov 23, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door , 1st story
Nov 23, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2e, 2nd story, 1st apartment from west at north
Sep 24, 2025 · Apt 2E
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jul 10, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1j, 1st story, 1st apartment from north at east
Jul 10, 2025 · Apt 1J
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 10, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 10, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lock set and assembly at vestibule door , 1st story, section ''west''
Jul 2, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at trash chute hopper door at public hall, 4th story, section ''g-l''
May 15, 2025
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of construction materials at public hall, 3rd story, section ''g-l''
May 15, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1j, 1st story, 1st apartment from north at east
Apr 2, 2025 · Apt 1J
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 1st story, section at east
Apr 2, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall at public hall, 1st story, section at east
Apr 2, 2025
Closed — Violation closed - BHazardous
Provide security in the event of a power outages by means of acceptable mechanical heavy duty lock and latch set at building entrance door at public hall, 1st story
Mar 23, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device install at the building entrance door at public hall, 1st story
Mar 23, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at entrance door to building at public hall, 1st story
Mar 16, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar
Mar 1, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1j, 1st story, 1st apartment from north at east
Mar 1, 2025 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the 1st room from north located at apt 1j, 1st story, 1st apartment from east at south
Jan 29, 2025 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 1st room from north located at apt 1j, 1st story, 1st apartment from east at south
Jan 29, 2025 · Apt 1J
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective mortise lockset in the entrance located at apt 1j, 1st story, 1st apartment from east at south
Jan 29, 2025 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods drop ladder in down position, stack at south yard at east
Jan 29, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar at boiler room
Jan 25, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1j, 1st story, 1st apartment from north at east
Jan 25, 2025 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 3rd room from east located at apt 1j, 1st story, 1st apartment from north at east
Jan 25, 2025 · Apt 1J
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch at door in the entrance located at apt 1j, 1st story, 1st apartment from north at east
Jan 10, 2025 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 1j, 1st story, 1st apartment from north at east
Jan 10, 2025 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at public hall, 1st story
Oct 23, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 3e, 3rd story, 1st apartment from west at north
Oct 23, 2024 · Apt 3E
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 3e, 3rd story, 1st apartment from west at north
Oct 23, 2024 · Apt 3E
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3e, 3rd story, 1st apartment from west at north
Oct 23, 2024 · Apt 3E
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 3e, 3rd story, 1st apartment from west at north
Oct 23, 2024 · Apt 3E
Closed — Violation closed - BHazardous
Repair or replace the smoke detector inoperable in the entire apartment located at apt 3e, 3rd story, 1st apartment from west at north
Oct 23, 2024 · Apt 3E
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 3e, 3rd story, 1st apartment from west at north
Oct 23, 2024 · Apt 3E
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the private hallway located at apt 3e, 3rd story, 1st apartment from west at north
Oct 23, 2024 · Apt 3E
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2c, 2nd story, 2nd apartment from east at south
Oct 15, 2024 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... (greater than 30 sq ft) on north wall, west wall, east wall, ceiling in the 2nd bathroom located at apt 2c, 2nd story, 2nd apartment from east at south
Oct 15, 2024 · Apt 2C
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the private hallway located at apt 2c, 2nd story, 2nd apartment from east at south
Oct 15, 2024 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 2nd apartment from east at south
Oct 15, 2024 · Apt 2C
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet continously running water in the 2nd bathroom located at apt 2c, 2nd story, 2nd apartment from east at south
Oct 15, 2024 · Apt 2C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood baseboard at east wall in the 3rd room from east at south located at apt 2c, 2nd story, 2nd apartment from east at south
Oct 15, 2024 · Apt 2C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 2nd room from east at south located at apt 2c, 2nd story, 2nd apartment from east at south
Oct 15, 2024 · Apt 2C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective rubber gasket on door at refrigerator in the kitchen located at apt 2c, 2nd story, 2nd apartment from east at south
Oct 15, 2024 · Apt 2C
Closed — Violation closed
DOB building violations · 13
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Construction other optional
Stop all work make site safe only, contact borough comm.office at 718 802-3 677
May 2, 2016
Dob violation - dismissed
Show 3 more ↓
- Construction other optional
Maintain egress for the fire escape,drop ladder,also remove illegal ha rdware from side egress
Apr 22, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 6, 1988
Dob violation - dismissed
ECB violations · 4
- Class - 2
Failure to obtain a temporary construction permit upon insp. noted:there are temporary construction installed in passageway & dob records shows no permit for temporary construction has been issued.remedy:obtai
Apr 18, 2009
Resolve - Hazardous
Work w/o a permit; expired permit. remedy: renew permit.
May 8, 2008 · Penalty $500
Resolve - Non-hazardous
Failure to maintain (1) hand rail missing at main entrance stair (2) exit signs and light fixture missing or inoperative in hallway from 1 st to 4 sty remedy make all necessary repair to the satisfaction of dpt
Jul 6, 1988 · Penalty $1,000
Resolve - Non-hazardous
(1) ltg. fix. and exit sign missing or imoperative from 1fl thru 4fl (2) compactor door on 3 floor not close properly (3) intercom not operative.(4) exhaust fans in bathroom in community room are not operative
Jul 6, 1988
Resolve
Complaints
- Plumbing
Bathtub/shower
Apr 17, 2026 · Apt 4G
Close - Heat/hot water
Apartment only
Apr 7, 2026 · Apt APARTM
Close - Heat/hot water
Entire building
Apr 2, 2026 · Apt 1J
Close - Heat/hot water
Apartment only
Mar 14, 2026 · Apt 4D
Close - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 4D
Close - Heat/hot water
Apartment only
Jan 11, 2026 · Apt 3D
Close - Heat/hot water
Apartment only
Dec 11, 2025 · Apt 4D
Close - Heat/hot water
Apartment only
Dec 8, 2025 · Apt 4D
Close - Heat/hot water
Entire building
Dec 7, 2025 · Apt 2I
Close - Electric
Power outage
Dec 7, 2025 · Apt 2I
Close
Show 40 more ↓
- Heat/hot water
Entire building
Nov 30, 2025 · Apt 2C
Close - Heat/hot water
Entire building
Nov 29, 2025 · Apt 4D
Close - Plumbing
Water supply
Nov 25, 2025 · Apt 4D
Close - Heat/hot water
Apartment only
Nov 25, 2025 · Apt 4D
Close - Heat/hot water
Apartment only
Nov 20, 2025 · Apt 1E
Close - Heat/hot water
Entire building
Oct 30, 2025 · Apt 4E
Close - Heat/hot water
Apartment only
Oct 30, 2025 · Apt 1E
Close - Water leak
Heavy flow
Sep 22, 2025 · Apt 2E
Close - Electric
Power outage
Sep 22, 2025 · Apt 2E
Close - Unsanitary condition
Pests
Jun 27, 2025 · Apt 1J
Close - Unsanitary condition
Pests
Jun 27, 2025 · Apt 1J
Close - Safety
Window guard broken/missing
Jun 1, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
May 20, 2025 · Apt 4G
Close - Plumbing
Toilet
May 6, 2025 · Apt 3G
Close - Plumbing
Toilet
Apr 26, 2025 · Apt 4G
Close - Plumbing
Bathtub/shower
Apr 26, 2025 · Apt 4G
Close - Unsanitary condition
Pests
Mar 27, 2025 · Apt 1J
Close - Plumbing
Water supply
Mar 27, 2025 · Apt 1J
Close - Plumbing
Water supply
Mar 27, 2025 · Apt 1J
Close - Plumbing
Radiator
Mar 27, 2025 · Apt 1J
Close - Heat/hot water
Apartment only
Mar 20, 2025 · Apt 1J
Close - Heat/hot water
Apartment only
Mar 19, 2025 · Apt 2C
Close - Heat/hot water
Entire building
Mar 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2025 · Apt IJ
Close - Heat/hot water
Entire building
Mar 13, 2025 · Apt 1J
Close - Heat/hot water
Apartment only
Mar 9, 2025 · Apt 1J
Close - Heat/hot water
Apartment only
Mar 3, 2025 · Apt 1J
Close - Heat/hot water
Entire building
Mar 3, 2025 · Apt 4H
Close - Heat/hot water
Entire building
Mar 2, 2025 · Apt BLDG
Close - Plumbing
Basin/sink
Mar 2, 2025 · Apt 4H
Close - Plumbing
Toilet
Mar 2, 2025 · Apt 4H
Close - Heat/hot water
Apartment only
Feb 28, 2025 · Apt 1J
Close - Heat/hot water
Apartment only
Feb 23, 2025 · Apt 1J
Close - Water leak
Slow leak
Jan 29, 2025 · Apt 1J
Close - Heat/hot water
Apartment only
Jan 29, 2025 · Apt 1J
Close - Heat/hot water
Apartment only
Jan 28, 2025 · Apt 1J
Close - Heat/hot water
Entire building
Jan 26, 2025 · Apt 1J
Close - Heat/hot water
Entire building
Jan 21, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 21, 2025 · Apt 1J
Close - Paint/plaster
Wall
Jan 19, 2025 · Apt 1J
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1910
- Floors
- 4
- Residential units
- 48
- Building area
- 42,596 ft²
- Lot area
- 15,000 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 41
- Block / lot
- 1431 / 37
- Assessed value
- $2,030,400
- Landmark / historic district
- No
HPD registration #390950, last renewed Aug 25, 2025.
Questions about 2041 Pacific Street
Who owns 2041 Pacific Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Pact Preservation Partners LLC.
Does 2041 Pacific Street have violations?
Yes. NYC HPD has recorded 105 housing violations at this property.
Is 2041 Pacific Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2041 Pacific Street built?
City records list 1910 as the year it was built.
How many apartments are in 2041 Pacific Street?
It has 48 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.