1310 St Johns Place
Brooklyn, NY 11213BBL 3-01383-0027Map
Owner of record: C S N Properties INC.
1310 St Johns Place is a walk-up apartment building built in 1908 in Brooklyn, 11213. It has 12 residential units across 4 floors. The owner of record is C S N Properties INC.. HPD has recorded 189 housing violations here, most recently on September 2, 2026. 37 of the 50 most recent violations are still open. City tax records listed 11 rent-stabilized apartments here in 2024.
- HPD violations
- 189
- DOB violations
- 9
- ECB violations
- 4
- HPD complaints
- 701
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 189
- BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Sep 2, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story
Sep 2, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd story
Sep 2, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story
Sep 2, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Sep 2, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Sep 2, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 3rd story
Sep 2, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective intercom system from building entrance to west wall in the foyer located at apt 4c, 4th story, 1st apartment from south at west
Jul 22, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the 4th room from north located at apt 4c, 4th story, 1st apartment from south at west
Jul 22, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt 4c, 4th story, 1st apartment from south at west
Jul 22, 2026 · Apt 4C
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
Jul 22, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
Jul 22, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective grout around the bathtub in the bathroom located at apt 4c, 4th story, 1st apartment from south at west
Jul 22, 2026 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement at boiler room
Mar 19, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Mar 19, 2026 · Apt 2A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 4c, 4th story, 2nd apartment from east at south
Mar 16, 2026 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at entrance door in the entrance located at apt 1a, 1st story, 1st apartment from west at north
Mar 16, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Mar 16, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from east located at apt 1a, 1st story, 1st apartment from west at north
Mar 16, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash of window, 2nd window from east at south wall in the 3rd room from north located at apt 2a, 2nd story, 1st apartment from west at north
Mar 14, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2a, 2nd story, 1st apartment from west at north
Mar 14, 2026 · Apt 2A
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet at west wall. in the 4th room from north located at apt 4c, 4th story, 2nd apartment from east at south
Mar 9, 2026 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Mar 9, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4c, 4th story, 2nd apartment from east at south
Mar 9, 2026 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective due to the latch set at the vestibule , 1st story
Jan 18, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective locking mechanism at the door at the vestibule , 1st story
Jan 18, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked basement at boiler room
Jan 14, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 1st apartment from west at north
Jan 14, 2026 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 8, 2026
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective regrout ceramic wall tiles in the bathroom located at apt 4c, 4th story, apartment at south
Jan 8, 2026 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south
Jan 8, 2026 · Apt 4C
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 19, 2025
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4c, 4th story, 1st apartment from north at east
Nov 9, 2025 · Apt 4C
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4c, 4th story, 1st apartment from north at east
Nov 9, 2025 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4c, 4th story, 1st apartment from north at east
Nov 9, 2025 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system at boiler room
Nov 9, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 2nd story
Nov 7, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at the vestibule door at public hall, 1st story
Nov 7, 2025
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor, 1st story
Nov 3, 2025
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the visible mold at caulking and grout joints of the ceramic tiles at south, west and north walls around bathtub, in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Nov 3, 2025 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Nov 3, 2025 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked from from fire passageway to cellar at boiler room
Nov 3, 2025
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling, in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Nov 3, 2025 · Apt 1A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at the ceiling and south wall, in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Nov 3, 2025 · Apt 1A
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of shopping cart, shoes rack and air conditioner at public hall, 2nd story
Nov 3, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at the vestibule door , at public hall, 1st story
Nov 3, 2025
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at the ceiling and south wall, in the bathroom located at apt 1a, 1st story, 1st apartment from west at north original violation 18342720 issued 03-nov-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Nov 3, 2025 · Apt 1A
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing, in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Nov 3, 2025 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1a, 1st story, 1st apartment from west at north
Nov 3, 2025 · Apt 1A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Nov 3, 2025 · Apt 1A
Open — Nov sent out
DOB building violations · 9
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 10, 2021
Dob violation - active - Construction other optional
Failure to maintain building in a code compliant manner-front exposure at parapet level w/several cracks-out of plumb & missing caps - submit an engineers report for entire facade
Aug 17, 2021
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 4
- Class - 1
Failure to maintain bldg in code compliant manner. noted: observed during inspection of facade parapet level cracks all throughout,top out of level/plumb w/bricks missing throughout. causing a severe fall hazar
Oct 27, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to maintain building in code compliant manner. various cracks at parapet level out of plumb with missing caps and bricks at various levels.remedy:repair and/or replace - to coe maintain building
Aug 17, 2021 · Penalty $1,250
Active - Non-hazardous
B4a,50a.50a no signs posted in lobby for keys to heating system boiler room
Dec 18, 2006 · Penalty $180
Resolve - Non-hazardous
Failure to maintain. noted: staircase at main entrance has partially collapsed. approx. 4'x 4' landing between door frame and stairs has collapsed into cellar.remedy: make safe immediately. obtain all necessary
Jan 5, 2006 · Penalty $800
Resolve
Complaints
- Flooring/stairs
Floor
Oct 22, 2026 · Apt 4A
Open - General
Bell/buzzer/intercom
Oct 22, 2026 · Apt 4A
Open - Unsanitary condition
Pests
Oct 22, 2026 · Apt 4A
Open - Unsanitary condition
Pests
Oct 22, 2026 · Apt 4A
Open - Paint/plaster
Wall
Oct 22, 2026 · Apt 4A
Open - Heat/hot water
Apartment only
Oct 22, 2026 · Apt 4A
Open - Paint/plaster
Ceiling
Oct 22, 2026 · Apt 2A
Open - Heat/hot water
Entire building
Oct 22, 2026 · Apt 2A
Open - Water leak
Heavy flow
Aug 20, 2026 · Apt 3A
Close - Plumbing
Bathtub/shower
Aug 14, 2026 · Apt 2A
Close
Show 40 more ↓
- Plumbing
Basin/sink
Aug 14, 2026 · Apt 2A
Close - Unsanitary condition
Mold
Jul 14, 2026 · Apt 4C
Close - Electric
Outlet/switch
Jul 14, 2026 · Apt 4C
Close - Plumbing
Basin/sink
Jul 14, 2026 · Apt 4C
Close - Safety
Smoke detector
Jul 14, 2026 · Apt 4C
Close - Safety
Carbon monoxide detector
Jul 14, 2026 · Apt 4C
Close - General
Bell/buzzer/intercom
Jul 14, 2026 · Apt 4C
Close - Heat/hot water
Apartment only
Jun 25, 2026 · Apt 4C
Close - Heat/hot water
Entire building
May 21, 2026 · Apt 2A
Close - Unsanitary condition
Garbage/recycling storage
Apr 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 19, 2026 · Apt BLDG
Close - Electric
Wiring
Mar 18, 2026 · Apt 3C
Close - Unsanitary condition
Garbage/recycling storage
Mar 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 17, 2026 · Apt 2C
Close - Plumbing
Water supply
Mar 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2026 · Apt APARTM
Close - Heat/hot water
Apartment only
Mar 8, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Mar 7, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Mar 7, 2026 · Apt 2C
Close - Water leak
Heavy flow
Mar 7, 2026 · Apt 1A
Close - Water leak
Slow leak
Mar 7, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Mar 7, 2026 · Apt 4C
Close - Appliance
Electric/gas range
Mar 7, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Mar 7, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Mar 7, 2026 · Apt 2A
Close - Door/window
Window frame
Mar 7, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 6, 2026 · Apt 4C
Close - Door/window
Window frame
Feb 13, 2026 · Apt 2A
Close - Water leak
Slow leak
Feb 13, 2026 · Apt 2A
Close - Door/window
Door
Feb 13, 2026 · Apt 2A
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 4C
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BUILDI
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 13, 2026 · Apt 4C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1908
- Floors
- 4
- Residential units
- 12
- Building area
- 9,744 ft²
- Lot area
- 3,064 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 35
- Block / lot
- 1383 / 27
- Assessed value
- $326,250
- Landmark / historic district
- No
HPD registration #338310, last renewed Nov 24, 2025.
Questions about 1310 St Johns Place
Who owns 1310 St Johns Place?
The owner of record in NYC Department of City Planning PLUTO data is C S N Properties INC..
Does 1310 St Johns Place have violations?
Yes. NYC HPD has recorded 189 housing violations at this property.
Is 1310 St Johns Place rent stabilized?
NYC Department of Finance tax bills listed 11 rent-stabilized units here in 2024 (about 92% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1310 St Johns Place built?
City records list 1908 as the year it was built.
How many apartments are in 1310 St Johns Place?
It has 12 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.