650 Empire Boulevard
Brooklyn, NY 11213BBL 3-01326-0035Map
Owner of record: 660 Empire Blvd Assoc
650 Empire Boulevard is a walk-up apartment building built in 1926 in Brooklyn, 11213. It has 42 residential units across 4 floors. The owner of record is 660 Empire Blvd Assoc. HPD has recorded 374 housing violations here, most recently on September 14, 2026. 30 of the 50 most recent violations are still open. City tax records listed 42 rent-stabilized apartments here in 2024.
- HPD violations
- 374
- DOB violations
- 2
- ECB violations
- 1
- HPD complaints
- 428
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 374
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
Sep 14, 2026
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). north wall in the 2nd room from north located at apt 10d, 4th story, 1st apartment from east at south
Jul 25, 2026 · Apt 10D
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom located at apt 10d, 4th story, 1st apartment from east at south
Jul 25, 2026 · Apt 10D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the 4th room from north located at apt 10d, 4th story, 1st apartment from east at south
Jul 25, 2026 · Apt 10D
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 10d, 4th story, 1st apartment from east at south
Jul 25, 2026 · Apt 10D
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 10d, 4th story, 1st apartment from east at south
Jul 25, 2026 · Apt 10D
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from north at east wall in the 4th room from north located at apt 10d, 4th story, 1st apartment from east at south
Jul 25, 2026 · Apt 10D
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 2nd room from north located at apt 10d, 4th story, 1st apartment from east at south
Jul 25, 2026 · Apt 10D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the private hallway located at apt 10d, 4th story, 1st apartment from east at south
Jul 25, 2026 · Apt 10D
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, west wall in the bathroom located at apt 10d, 4th story, 1st apartment from east at south
Jul 25, 2026 · Apt 10D
Open — Civ14 mailed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from east at south wall, 1st window frame from east at south wall, 1st window frame from east at south wall in the 4th room from north located at apt 10d, 4th story, 1st apartment from east at south
Jul 25, 2026 · Apt 10D
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective base cabinet door at south wall in the kitchen located at apt 10d, 4th story, 1st apartment from east at south
Jul 25, 2026 · Apt 10D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and west wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Mar 1, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Mar 1, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Mar 1, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and east wall in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Mar 1, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is missing in the entire apartment located at apt 2c, 3rd story, 1st apartment from west at north , section ''west''
Feb 28, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 2c, 3rd story, 1st apartment from west at north , section ''west''
Feb 28, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroom located at apt 2c, 3rd story, 1st apartment from west at north , section ''west''
Feb 28, 2026 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen located at apt 1a, 1st story, 1st apartment from west at north , section at west
Feb 13, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall and ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at north , section at west
Feb 13, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north , section at west original violation 18641108 issued 13-feb-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Feb 13, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north , section at west
Feb 13, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1a, 1st story, 1st apartment from west at north , section at west
Feb 13, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall and ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from west at north , section at west
Feb 13, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north , section at west
Feb 13, 2026 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north , section at west
Feb 13, 2026 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north , section at west
Feb 13, 2026 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at north , section at west
Feb 13, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Feb 11, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt c10, 3rd story, 1st apartment from east at south , section ''east'', at east
Jan 7, 2026 · Apt C10
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt c10, 3rd story, 1st apartment from east at south , section ''east'', at east
Jan 7, 2026 · Apt C10
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt c10, 3rd story, 1st apartment from east at south , section ''east'', at east
Jan 7, 2026 · Apt C10
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at, less than 10,sqft , ceiling and walls at , trash room , south wall, building ' s lobby , at public hall, 1st story original violation 18510910 issued 16-dec-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Dec 16, 2025
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 10d, 4th story, 1st apartment from east at south , section ''east''
Dec 16, 2025 · Apt 10D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant materials plaster at ceiling at , trash room , south wall, building ' s lobby , at public hall, 1st story
Dec 16, 2025
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective cracked glass at, window upper sash , 1st from north at, east wall, in the 2nd room from north located at apt 10d, 4th story, 1st apartment from east at south , section ''east''
Dec 16, 2025 · Apt 10D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st base cabinet from north at east wall, ceiling, 1st door frame from south at west wall, north wall, south wall, east wall, west wall, 1st wall cabinet from west at north wall, 1st window frame from north at east wall in the kitchen located at apt 10d, 4th story, 1st apartment from east at south , section ''east''
Dec 16, 2025 · Apt 10D
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 2nd window frame from north at east wall in the 2nd room from north located at apt 10d, 4th story, 1st apartment from east at south , section ''east''
Dec 16, 2025 · Apt 10D
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from east at south wall in the 4th room from north located at apt 10d, 4th story, 1st apartment from east at south , section ''east''
Dec 16, 2025 · Apt 10D
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant materials plaster at ceiling, east section, at public hall, 4th story
Dec 16, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door at, entrance door , north wall, in the 4th room from north located at apt 10d, 4th story, 1st apartment from east at south , section ''east''
Dec 16, 2025 · Apt 10D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective floor at wood base cabinet ,at south wall , in the kitchen located at apt 10d, 4th story, 1st apartment from east at south , section ''east''
Dec 16, 2025 · Apt 10D
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 10d, 4th story, 1st apartment from east at south , section ''east''
Dec 16, 2025 · Apt 10D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 10d, 4th story, 1st apartment from east at south , section ''east''
Dec 16, 2025 · Apt 10D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall, north wall, east wall, ceiling, baseboard at west wall in the 2nd room from north located at apt 10d, 4th story, 1st apartment from east at south , section ''east''
Dec 16, 2025 · Apt 10D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperative in the entire apartment located at apt 10d, 4th story, 1st apartment from east at south , section ''east''
Dec 16, 2025 · Apt 10D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperative in the entire apartment located at apt 10d, 4th story, 1st apartment from east at south , section ''east''
Dec 16, 2025 · Apt 10D
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 3 in the entire apartment located at apt 10d, 4th story, 1st apartment from east at south , section ''east''
Dec 16, 2025 · Apt 10D
Closed — Violation dismissed - BHazardous
Refit entrance door in the bathroom located at apt 10d, 4th story, 1st apartment from east at south , section ''east''
Dec 16, 2025 · Apt 10D
Closed — Violation dismissed
DOB building violations · 2
- Construction other optional
Failure to maintain building in a code compliant manner. at time of inspection observed in apt 1c in front bedroom, large diagonal crack, vertical cracks in corner and horizontal cracks at ceiling. floor at several locations not level.
Sep 20, 2023
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed
ECB violations · 1
- Class - 1
In apt 1c, in front bedroom, large horizontal crack appears,also noted in corners, at ceiling large cracks appear. noted floor in several areas not level and feels sagging in multiple areas., repair and/replace
Sep 20, 2023 · Penalty $1,250
Resolve
Complaints
- Paint/plaster
Wall
Oct 14, 2026 · Apt 11C
Open - Water leak
Damp spot
Oct 14, 2026 · Apt 11C
Open - Paint/plaster
Ceiling
Oct 14, 2026 · Apt 11C
Open - Unsanitary condition
Garbage/recycling storage
Sep 27, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 15, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jul 13, 2026 · Apt 10D
Close - Unsanitary condition
Pests
Jul 13, 2026 · Apt 10D
Close - Flooring/stairs
Floor
Jul 13, 2026 · Apt 10D
Close - Electric
Outlet/switch
Jul 13, 2026 · Apt 10D
Close - Unsanitary condition
Mold
Jul 13, 2026 · Apt 10D
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
Jul 13, 2026 · Apt 10D
Close - Flooring/stairs
Floor
Jul 13, 2026 · Apt 10D
Close - Plumbing
Basin/sink
Jul 13, 2026 · Apt 10D
Close - General
Cabinet
Jul 13, 2026 · Apt 10D
Close - Unsanitary condition
Pests
Mar 19, 2026 · Apt C10
Close - Heat/hot water
Entire building
Mar 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt B7
Close - Water leak
Heavy flow
Feb 15, 2026 · Apt 1A
Close - Water leak
Heavy flow
Feb 15, 2026 · Apt 2C
Close - Plumbing
Bathtub/shower
Feb 15, 2026 · Apt 2C
Close - Plumbing
Toilet
Feb 15, 2026 · Apt 2C
Close - Plumbing
Basin/sink
Feb 15, 2026 · Apt 2C
Close - Paint/plaster
Wall
Feb 15, 2026 · Apt 2C
Close - Plumbing
Bathtub/shower
Feb 15, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt B7
Close - Paint/plaster
Ceiling
Feb 5, 2026 · Apt 1A
Close - Water leak
Damp spot
Feb 5, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Jan 11, 2026 · Apt 1A
Close - Water leak
Heavy flow
Jan 11, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 6, 2026 · Apt 6A
Close - Heat/hot water
Entire building
Dec 29, 2025 · Apt 7B
Close - Unsanitary condition
Pests
Dec 29, 2025 · Apt C10
Close - Paint/plaster
Wall
Dec 10, 2025 · Apt 10D
Close - Door/window
Door
Dec 10, 2025 · Apt 10D
Close - Paint/plaster
Ceiling
Dec 10, 2025 · Apt 10D
Close - Unsanitary condition
Mold
Nov 13, 2025 · Apt C10
Close - Unsanitary condition
Pests
Nov 13, 2025 · Apt C10
Close - Heat/hot water
Entire building
Oct 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 24, 2025 · Apt C10
Close - Heat/hot water
Entire building
Oct 22, 2025 · Apt D10
Close - Unsanitary condition
Mold
Oct 13, 2025 · Apt 1A
Close - Water leak
Slow leak
Oct 13, 2025 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1926
- Floors
- 4
- Residential units
- 42
- Building area
- 36,150 ft²
- Lot area
- 13,000 ft²
- Zoning
- R7-1
- Community board
- 309
- Council district
- 40
- Block / lot
- 1326 / 35
- Assessed value
- $678,600
- Landmark / historic district
- No
HPD registration #336183, last renewed Nov 19, 2025.
Questions about 650 Empire Boulevard
Who owns 650 Empire Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 660 Empire Blvd Assoc.
Does 650 Empire Boulevard have violations?
Yes. NYC HPD has recorded 374 housing violations at this property.
Is 650 Empire Boulevard rent stabilized?
NYC Department of Finance tax bills listed 42 rent-stabilized units here in 2024 (about 100% of its 42 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 650 Empire Boulevard built?
City records list 1926 as the year it was built.
How many apartments are in 650 Empire Boulevard?
It has 42 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.