roofy

264 Sullivan Place

Brooklyn, NY 11225BBL 3-01308-0025Map

Owner of record: 262-264 Sullivan Group LLC

264 Sullivan Place is an elevator apartment building built in 2017 in Brooklyn, 11225. It has 25 residential units across 7 floors. The owner of record is 262-264 Sullivan Group LLC. HPD has recorded 37 housing violations here, most recently on March 26, 2026. 18 of the 37 most recent violations are still open. City tax records listed 10 rent-stabilized apartments here in 2024.

HPD violations
37
DOB violations
5
ECB violations
30
HPD complaints
61

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Mar 26, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
10
About 40% of the building's 25 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 37

  • C

    M/d law abate the nuisance consisting of refrigerator with doors intact at cellar

    Mar 26, 2026

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt 4d, 4th story, 2nd apartment from south at west original violation 18738238 issued 26-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Mar 26, 2026 · Apt 4D

    Open — Notice of issuance sent to tenant
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt 4d, 4th story, 2nd apartment from south at west

    Mar 26, 2026 · Apt 4D

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4d, 4th story, 2nd apartment from south at west

    Mar 26, 2026 · Apt 4D

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4d, 4th story, 2nd apartment from south at west

    Mar 26, 2026 · Apt 4D

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective door off track at north in the 1st room from north at west located at apt 4d, 4th story, 2nd apartment from south at west

    Mar 26, 2026 · Apt 4D

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 4d, 4th story, 2nd apartment from south at west

    Mar 26, 2026 · Apt 4D

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall in the 1st room from north at west located at apt 4e, 4th story, 2nd apartment from west at north

    Oct 22, 2025 · Apt 4E

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood base sink cabinet in the kitchen located at apt 4e, 4th story, 2nd apartment from west at north

    Oct 22, 2025 · Apt 4E

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 13, 2025

    Closed — Violation dismissed
Show 27 more ↓
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 29, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 17, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 11, 2023

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Sep 11, 2023

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Sep 11, 2023

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 11, 2023

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Sep 11, 2023

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 31, 2023

    Closed — Violation dismissed
  • C

    Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2e, 2nd story, 1st apartment from west at north

    Oct 4, 2021 · Apt 2E

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from west at north

    Oct 4, 2021 · Apt 2E

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from west at north

    Oct 4, 2021 · Apt 2E

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... approximately 6 sq. ft at south and east wall in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west

    Aug 19, 2021 · Apt 3D

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Aug 19, 2021

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Aug 19, 2021

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Aug 19, 2021

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 19, 2021

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Aug 19, 2021

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... approximately 6 sq. ft at south and east wall in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west original violation 14510631 issued 19-aug-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Aug 19, 2021 · Apt 3D

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 19, 2021

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 20, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 20, 2021

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit located at apt 2e, 2nd story, 2nd apartment from west at north

    Jan 7, 2020 · Apt 2E

    Closed — Violation closed
  • C

    Properly repair the broken or defective radiator at west wall in the 1st room from north at east located at apt 2e, 2nd story, 2nd apartment from west at north

    Jan 7, 2020 · Apt 2E

    Closed — Violation closed
  • C

    Properly repair the broken or defective radiator(s) in the 1st room from north at west located at apt 2e, 2nd story, 2nd apartment from west at north

    Jan 7, 2020 · Apt 2E

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at cooking range in the kitchen located at apt 2fl, 2nd story

    Jan 12, 2009 · Apt 2FL

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story

    Jan 12, 2009 · Apt 2FL

    Closed — Violation closed
  • B

    Discontinue the rooming unit ... in the entire apartment located at apt 2fl, 2nd story

    Jan 12, 2009 · Apt 2FL

    Closed — Violation closed

DOB building violations · 5

  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 28, 2020

    Dob violation - resolved
  • Construction other optional

    Stop all work except to make site safe contact bklyn borough commissio ners office at 718 802-3677

    Dec 18, 2018

    Dob violation - dismissed
  • Public assembly none

    Pa-public assembly none

    Dec 7, 1988

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Dec 7, 1988

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Nov 7, 1988

    Dob violation - dismissed

ECB violations · 30

  • Class - 2

    Insulation placement and/or r-values do not meet min. required. nb job #34033001. at time of an energy compliance inspection. i observed that the exterior walls on exposures #1, #2, #3 and #4 from 1st to 7th fl

    Feb 21, 2018 · Penalty $2,000

    Resolve
  • Class - 1

    Bc3309.10 failure to protect or adequately protect adjoining property during construction operations. no roof protection. at time of inspection of a new 7 story building under construction at bulk head level ac

    Jan 11, 2018 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3307.7 no protection provided from job site fence to sidewalk shed. at time of inspection of a 7 story new building under construction active job site. i observed that there were no protection provided betwee

    Jan 11, 2018 · Penalty $400

    Resolve
  • Class - 2

    Fence. at time of inspection, i observed job site fence at exp 1 not plumb. the fence was sagging inward and did not appear to be adequately secured. rem: maintain jobsite fence as per code.

    Dec 21, 2017

    Resolve
  • Class - 1

    At time of inspection, i observed work in process at roof level with no means of safety measures in place. no guardrails or netting system was in place while material & personnel in place. stop all work at roof

    Dec 21, 2017 · Penalty $1,200

    Resolve
  • Class - 1

    No caz. at time of inspection, i observed cmu being placed at exp 1 on the 6th floor terrace. the area was open without fall protection and at times unattended. no controlled access zone has put into place to d

    Dec 21, 2017 · Penalty $5,000

    Resolve
  • Class - 1

    Bc3301.4 no inspection logs for safety straps. at time of inspection, i observed concrete embedded safety straps in use by worker. i requested inspection logs or record of concrete embedded safety straps indica

    Dec 21, 2017 · Penalty $400

    Resolve
  • Class - 1

    Bc3308.5 inadequate netting. at time of inspection i observed inadequate netting system throughout entire building. zero cables were loose and draping, nettings were not tied down onto cables, were sagging and

    Dec 21, 2017 · Penalty $400

    Resolve
  • Class - 1

    Bc3308.5.6 temporary removal. at time of inspection, i observed the entire netting was removed on the 5th floor slab for the installation of metal framing along the edge. areas of no netting were not isolated n

    Dec 21, 2017 · Penalty $400

    Resolve
  • Class - 2

    Sec. 3301.02 logs. at the time of my inspection,of a 7 sty nb currently at foundation level w/construction operations in progress. upon request for construction superintendent daily logs as required for constru

    Aug 31, 2017

    Resolve
Show 20 more ↓
  • Class - 1

    Construction superintendent failed to perform duties as per rule. at time of my inspection of a 2 sty nb currrently at foundation level w/construction operations in progress upon request for construction superi

    Aug 31, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to provide reqd notification prior to the commencement of dem olition.noted:a check of dob records at time of inspection indicates that notification was not given. rem:comply w/code

    Aug 22, 2017 · Penalty $1,200

    Resolve
  • Class - 2

    Failure to provide approved/accepted plans @ job site @ time of insp. noted @ time of insp observed construction activity work, contractor failure to provide fence drawing plans. rem: provide plan.

    Apr 21, 2017

    Resolve
  • Class - 1

    Bc107.7.1:the respondent failed to meet the minimum requirements of the code(28-101.2)and produced foundation/earthwork/support of excavation drawings for job#321033001 that did not identify the bottom of the

    Apr 21, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Work does not conform to approved construction documents &/or approvedamendments. @ time insp observed shoring for support of excavation @ exp#1,2,4. inadequate contractor not following procedure of install & p

    Apr 21, 2017 · Penalty $250

    Resolve
  • Class - 1

    Failure to notify dob w/ 24-48 hours of the start of excavation. @ time of insp observed construction site w/ rebars install to new footing work in progress. during insp after search on bis noted that the const

    Apr 21, 2017 · Penalty $1,200

    Resolve
  • Class - 1

    Work does not conform to approved construction documents &/or approvedamendments. @ time of insp observed soldier piles has install @ exp#1 no plans or details has provided. rem: conform work to approved constr

    Apr 21, 2017 · Penalty $250

    Resolve
  • Class - 1

    Failure to safeguard all person & property affected by construction operations. noted: during drilling operation @ construction site contractor created damages to the adjoining bldg & sidewalk (house# 268 sulli

    Apr 21, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Sec: bc3309.6. failure to monitoring adjoining structures for movementin all direction during excavation related activity that may adversely affect adjoining structures. noted: @ time of insp observed excavatio

    Apr 21, 2017 · Penalty $400

    Resolve
  • Class - 1

    Sidewalk not maintained consisting of large cracks, holes & voids, uneven due to construction activities creating a trip hazard for pedestrians. @ time of insp of a 7 story new bldg under construction, work in

    Apr 20, 2017 · Penalty $250

    Resolve
  • Class - 1

    Sec: bc3301.2. failure to institute/maintain safety equipment measuresor temporary construction. no rebars caps. @ time of insp of a 7 storybldg under construction @ excavation/foundation stage, work in progres

    Apr 20, 2017 · Penalty $400

    Resolve
  • Class - 1

    Sec: bc3304.7. safe means of ingress & egress. required means of egress shall be maintained @ all times during construction/demolition operation. note: @ time of insp of a 7 story new bldg under construction @

    Apr 20, 2017 · Penalty $400

    Resolve
  • Class - 1

    Failure to provide protection @ sides of excavation. @ time of insp of a 7 story bldg under construction @ excavation/ foundation stage work in progress w/ 10 workers operator (equipment) rebar installers, & ca

    Apr 20, 2017 · Penalty $1,200

    Resolve
  • Class - 1

    General contractor not maintaining construction superintendent as required by code. note: @ time of insp of a 7 story new bldg under construction @ foundation level, work in progress w/ 10 workers on site, addi

    Apr 20, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    No logs on site. notes: @ time of insp of a 7 story bldg under construction @ excavation stacie, work in progress w/ 10 workers namely equipment operator rebar installers & carpenters. upon request for the dail

    Apr 20, 2017 · Penalty $400

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by c of o and dob records 2sty class a apt converted into 5 class b rooms remedy: discontinue illegal use of amended c of o

    Mar 12, 2009 · Penalty $12,000

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by dob records.car garage use as storage of construction debris. remedy:discontinue illegal use

    Dec 13, 2006 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work without a permit: work as noted: at a 2 storied brick framed structure the basement has been illegally converted class a sub-division with the erection of walls to form multiple rooming units. two apts. ha

    Oct 24, 2005 · Penalty $500

    Resolve
  • Non-hazardous

    Residence altered for occupancy as a dwelling for more than the legally approved number of families: as noted: at a two storied brick framed structure two apts. have illegally been converted to form multiple ro

    Oct 24, 2005 · Penalty $5,300

    Resolve
  • Non-hazardous

    Failure to maintain building: as noted: at a two storied brick frame structure the underside of the ceiling @ the pourch has a serious water condition approx. 5' x 5' @ the west side of the ceiling. note: crack

    Oct 24, 2005 · Penalty $350

    Resolve

Complaints

  • Safety

    Fire escape

    Mar 25, 2026 · Apt 3D

    Close
  • Safety

    Sprinkler

    Mar 25, 2026 · Apt 3D

    Close
  • Safety

    Fire escape

    Mar 25, 2026 · Apt BLDG

    Close
  • Door/window

    Door

    Feb 25, 2026 · Apt 4D

    Close
  • Door/window

    Door

    Feb 7, 2026 · Apt 4D

    Close
  • Flooring/stairs

    Floor

    Feb 7, 2026 · Apt 4D

    Close
  • Door/window

    Window frame

    Feb 7, 2026 · Apt 4D

    Close
  • Flooring/stairs

    Floor

    Jan 27, 2026 · Apt 4D

    Close
  • Unsanitary condition

    Mold

    Oct 16, 2025 · Apt 4E

    Close
  • Door/window

    Door

    Jan 3, 2025 · Apt 4D

    Close
Show 40 more ↓
  • Door/window

    Window frame

    Jan 3, 2025 · Apt 4D

    Close
  • Unsanitary condition

    Pests

    Jul 31, 2024 · Apt 5C

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 29, 2022 · Apt BLDG

    Close
  • Safety

    Carbon monoxide detector

    Sep 30, 2021 · Apt 2E

    Close
  • Appliance

    Electric/gas range

    Sep 30, 2021 · Apt 2E

    Close
  • Unsanitary condition

    Mold

    Aug 17, 2021 · Apt 3D

    Close
  • Unsanitary condition

    Mold

    Jul 23, 2021 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Jan 6, 2020 · Apt 2E

    Close
  • Heat/hot water

    Apartment only

    Dec 28, 2019 · Apt 2E

    Close
  • Heating

    Heat related

    Mar 17, 2009 · Apt BSMT

    Close
  • Heating

    Heat related

    Jan 17, 2009 · Apt 2

    Close
  • Heating

    Heat related

    Dec 13, 2008 · Apt 2

    Close
  • General

    Cooking gas

    Dec 11, 2008 · Apt 2FL

    Close
  • Heating

    Heat related

    Dec 11, 2008 · Apt 2FL

    Close
  • General

    Cooking gas

    Dec 9, 2008 · Apt 2FL

    Close
  • Heating

    Heat related

    Dec 9, 2008 · Apt 2FL

    Close
  • Heating

    Heat related

    Dec 9, 2008 · Apt BLDG

    Close
  • General

    Mold

    Jan 12, 2006 · Apt 2

    Close
  • Heating

    Heat related

    Jan 9, 2006 · Apt 2

    Close
  • Nonconst

    Vermin

    Jan 9, 2006 · Apt 2

    Close
  • Nonconst

    Vermin

    Jan 9, 2006 · Apt 2

    Close
  • Nonconst

    Vermin

    Jan 9, 2006 · Apt 2

    Close
  • General

    Mold

    Jan 9, 2006 · Apt 2

    Close
  • General

    Mold

    Jan 9, 2006 · Apt 2

    Close
  • Nonconst

    Vermin

    Oct 21, 2005 · Apt 1FL

    Close
  • Plumbing

    Water-leaks

    Oct 21, 2005 · Apt BSMT

    Close
  • Plumbing

    Water supply

    Oct 21, 2005 · Apt 1FL

    Close
  • Plumbing

    Radiator

    Oct 21, 2005 · Apt 1FL

    Close
  • Paint/plaster

    Wall

    Oct 21, 2005 · Apt 1FL

    Close
  • Paint/plaster

    Wall

    Oct 21, 2005 · Apt 1FL

    Close
  • Plumbing

    Radiator

    Oct 21, 2005 · Apt 1FL

    Close
  • Plumbing

    Radiator

    Oct 21, 2005 · Apt 1FL

    Close
  • General

    Floor

    Oct 21, 2005 · Apt 1FL

    Close
  • Plumbing

    Water-leaks

    Oct 21, 2005 · Apt 1FL

    Close
  • Paint/plaster

    Ceiling

    Oct 21, 2005 · Apt 1FL

    Close
  • Paint/plaster

    Ceiling

    Oct 21, 2005 · Apt 1FL

    Close
  • Electric

    Lighting

    Oct 21, 2005 · Apt 1FL

    Close
  • General

    Mold

    Oct 21, 2005 · Apt 1FL

    Close
  • Plumbing

    Basin/sink

    Oct 21, 2005 · Apt 1FL

    Close
  • Electric

    Lighting

    Oct 21, 2005 · Apt BSMT

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
2017
Floors
7
Residential units
25
Building area
21,205 ft²
Lot area
4,900 ft²
Zoning
R7-1
Community board
309
Council district
35
Block / lot
1308 / 25
Assessed value
$2,085,750
Landmark / historic district
No

HPD registration #388597, last renewed Oct 6, 2025.

Questions about 264 Sullivan Place

Who owns 264 Sullivan Place?

The owner of record in NYC Department of City Planning PLUTO data is 262-264 Sullivan Group LLC.

Does 264 Sullivan Place have violations?

Yes. NYC HPD has recorded 37 housing violations at this property.

Is 264 Sullivan Place rent stabilized?

NYC Department of Finance tax bills listed 10 rent-stabilized units here in 2024 (about 40% of its 25 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 264 Sullivan Place built?

City records list 2017 as the year it was built.

How many apartments are in 264 Sullivan Place?

It has 25 residential units and 26 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.