264 Sullivan Place
Brooklyn, NY 11225BBL 3-01308-0025Map
Owner of record: 262-264 Sullivan Group LLC
264 Sullivan Place is an elevator apartment building built in 2017 in Brooklyn, 11225. It has 25 residential units across 7 floors. The owner of record is 262-264 Sullivan Group LLC. HPD has recorded 37 housing violations here, most recently on March 26, 2026. 18 of the 37 most recent violations are still open. City tax records listed 10 rent-stabilized apartments here in 2024.
- HPD violations
- 37
- DOB violations
- 5
- ECB violations
- 30
- HPD complaints
- 61
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 37
- CImmediately hazardous
M/d law abate the nuisance consisting of refrigerator with doors intact at cellar
Mar 26, 2026
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt 4d, 4th story, 2nd apartment from south at west original violation 18738238 issued 26-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Mar 26, 2026 · Apt 4D
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt 4d, 4th story, 2nd apartment from south at west
Mar 26, 2026 · Apt 4D
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4d, 4th story, 2nd apartment from south at west
Mar 26, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4d, 4th story, 2nd apartment from south at west
Mar 26, 2026 · Apt 4D
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective door off track at north in the 1st room from north at west located at apt 4d, 4th story, 2nd apartment from south at west
Mar 26, 2026 · Apt 4D
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 4d, 4th story, 2nd apartment from south at west
Mar 26, 2026 · Apt 4D
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall in the 1st room from north at west located at apt 4e, 4th story, 2nd apartment from west at north
Oct 22, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood base sink cabinet in the kitchen located at apt 4e, 4th story, 2nd apartment from west at north
Oct 22, 2025 · Apt 4E
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Closed — Violation dismissed
Show 27 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 11, 2023
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Sep 11, 2023
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Sep 11, 2023
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 11, 2023
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Sep 11, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2e, 2nd story, 1st apartment from west at north
Oct 4, 2021 · Apt 2E
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from west at north
Oct 4, 2021 · Apt 2E
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from west at north
Oct 4, 2021 · Apt 2E
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 6 sq. ft at south and east wall in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west
Aug 19, 2021 · Apt 3D
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 19, 2021
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Aug 19, 2021
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 19, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 19, 2021
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 19, 2021
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 6 sq. ft at south and east wall in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west original violation 14510631 issued 19-aug-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 19, 2021 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 19, 2021
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 20, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit located at apt 2e, 2nd story, 2nd apartment from west at north
Jan 7, 2020 · Apt 2E
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective radiator at west wall in the 1st room from north at east located at apt 2e, 2nd story, 2nd apartment from west at north
Jan 7, 2020 · Apt 2E
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective radiator(s) in the 1st room from north at west located at apt 2e, 2nd story, 2nd apartment from west at north
Jan 7, 2020 · Apt 2E
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at cooking range in the kitchen located at apt 2fl, 2nd story
Jan 12, 2009 · Apt 2FL
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story
Jan 12, 2009 · Apt 2FL
Closed — Violation closed - BHazardous
Discontinue the rooming unit ... in the entire apartment located at apt 2fl, 2nd story
Jan 12, 2009 · Apt 2FL
Closed — Violation closed
DOB building violations · 5
- Elevator elevatorrequired
E-elevator elevatorrequired
Feb 28, 2020
Dob violation - resolved - Construction other optional
Stop all work except to make site safe contact bklyn borough commissio ners office at 718 802-3677
Dec 18, 2018
Dob violation - dismissed - Public assembly none
Pa-public assembly none
Dec 7, 1988
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 7, 1988
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 7, 1988
Dob violation - dismissed
ECB violations · 30
- Class - 2
Insulation placement and/or r-values do not meet min. required. nb job #34033001. at time of an energy compliance inspection. i observed that the exterior walls on exposures #1, #2, #3 and #4 from 1st to 7th fl
Feb 21, 2018 · Penalty $2,000
Resolve - Class - 1
Bc3309.10 failure to protect or adequately protect adjoining property during construction operations. no roof protection. at time of inspection of a new 7 story building under construction at bulk head level ac
Jan 11, 2018 · Penalty $1,600
Resolve - Class - 1
Bc3307.7 no protection provided from job site fence to sidewalk shed. at time of inspection of a 7 story new building under construction active job site. i observed that there were no protection provided betwee
Jan 11, 2018 · Penalty $400
Resolve - Class - 2
Fence. at time of inspection, i observed job site fence at exp 1 not plumb. the fence was sagging inward and did not appear to be adequately secured. rem: maintain jobsite fence as per code.
Dec 21, 2017
Resolve - Class - 1
At time of inspection, i observed work in process at roof level with no means of safety measures in place. no guardrails or netting system was in place while material & personnel in place. stop all work at roof
Dec 21, 2017 · Penalty $1,200
Resolve - Class - 1
No caz. at time of inspection, i observed cmu being placed at exp 1 on the 6th floor terrace. the area was open without fall protection and at times unattended. no controlled access zone has put into place to d
Dec 21, 2017 · Penalty $5,000
Resolve - Class - 1
Bc3301.4 no inspection logs for safety straps. at time of inspection, i observed concrete embedded safety straps in use by worker. i requested inspection logs or record of concrete embedded safety straps indica
Dec 21, 2017 · Penalty $400
Resolve - Class - 1
Bc3308.5 inadequate netting. at time of inspection i observed inadequate netting system throughout entire building. zero cables were loose and draping, nettings were not tied down onto cables, were sagging and
Dec 21, 2017 · Penalty $400
Resolve - Class - 1
Bc3308.5.6 temporary removal. at time of inspection, i observed the entire netting was removed on the 5th floor slab for the installation of metal framing along the edge. areas of no netting were not isolated n
Dec 21, 2017 · Penalty $400
Resolve - Class - 2
Sec. 3301.02 logs. at the time of my inspection,of a 7 sty nb currently at foundation level w/construction operations in progress. upon request for construction superintendent daily logs as required for constru
Aug 31, 2017
Resolve
Show 20 more ↓
- Class - 1
Construction superintendent failed to perform duties as per rule. at time of my inspection of a 2 sty nb currrently at foundation level w/construction operations in progress upon request for construction superi
Aug 31, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to provide reqd notification prior to the commencement of dem olition.noted:a check of dob records at time of inspection indicates that notification was not given. rem:comply w/code
Aug 22, 2017 · Penalty $1,200
Resolve - Class - 2
Failure to provide approved/accepted plans @ job site @ time of insp. noted @ time of insp observed construction activity work, contractor failure to provide fence drawing plans. rem: provide plan.
Apr 21, 2017
Resolve - Class - 1
Bc107.7.1:the respondent failed to meet the minimum requirements of the code(28-101.2)and produced foundation/earthwork/support of excavation drawings for job#321033001 that did not identify the bottom of the
Apr 21, 2017 · Penalty $1,600
Resolve - Class - 1
Work does not conform to approved construction documents &/or approvedamendments. @ time insp observed shoring for support of excavation @ exp#1,2,4. inadequate contractor not following procedure of install & p
Apr 21, 2017 · Penalty $250
Resolve - Class - 1
Failure to notify dob w/ 24-48 hours of the start of excavation. @ time of insp observed construction site w/ rebars install to new footing work in progress. during insp after search on bis noted that the const
Apr 21, 2017 · Penalty $1,200
Resolve - Class - 1
Work does not conform to approved construction documents &/or approvedamendments. @ time of insp observed soldier piles has install @ exp#1 no plans or details has provided. rem: conform work to approved constr
Apr 21, 2017 · Penalty $250
Resolve - Class - 1
Failure to safeguard all person & property affected by construction operations. noted: during drilling operation @ construction site contractor created damages to the adjoining bldg & sidewalk (house# 268 sulli
Apr 21, 2017 · Penalty $1,600
Resolve - Class - 1
Sec: bc3309.6. failure to monitoring adjoining structures for movementin all direction during excavation related activity that may adversely affect adjoining structures. noted: @ time of insp observed excavatio
Apr 21, 2017 · Penalty $400
Resolve - Class - 1
Sidewalk not maintained consisting of large cracks, holes & voids, uneven due to construction activities creating a trip hazard for pedestrians. @ time of insp of a 7 story new bldg under construction, work in
Apr 20, 2017 · Penalty $250
Resolve - Class - 1
Sec: bc3301.2. failure to institute/maintain safety equipment measuresor temporary construction. no rebars caps. @ time of insp of a 7 storybldg under construction @ excavation/foundation stage, work in progres
Apr 20, 2017 · Penalty $400
Resolve - Class - 1
Sec: bc3304.7. safe means of ingress & egress. required means of egress shall be maintained @ all times during construction/demolition operation. note: @ time of insp of a 7 story new bldg under construction @
Apr 20, 2017 · Penalty $400
Resolve - Class - 1
Failure to provide protection @ sides of excavation. @ time of insp of a 7 story bldg under construction @ excavation/ foundation stage work in progress w/ 10 workers operator (equipment) rebar installers, & ca
Apr 20, 2017 · Penalty $1,200
Resolve - Class - 1
General contractor not maintaining construction superintendent as required by code. note: @ time of insp of a 7 story new bldg under construction @ foundation level, work in progress w/ 10 workers on site, addi
Apr 20, 2017 · Penalty $1,600
Resolve - Class - 1
No logs on site. notes: @ time of insp of a 7 story bldg under construction @ excavation stacie, work in progress w/ 10 workers namely equipment operator rebar installers & carpenters. upon request for the dail
Apr 20, 2017 · Penalty $400
Resolve - Class - 1
Occupancy contrary to that allowed by c of o and dob records 2sty class a apt converted into 5 class b rooms remedy: discontinue illegal use of amended c of o
Mar 12, 2009 · Penalty $12,000
Resolve - Non-hazardous
Occupancy contrary to that allowed by dob records.car garage use as storage of construction debris. remedy:discontinue illegal use
Dec 13, 2006 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit: work as noted: at a 2 storied brick framed structure the basement has been illegally converted class a sub-division with the erection of walls to form multiple rooming units. two apts. ha
Oct 24, 2005 · Penalty $500
Resolve - Non-hazardous
Residence altered for occupancy as a dwelling for more than the legally approved number of families: as noted: at a two storied brick framed structure two apts. have illegally been converted to form multiple ro
Oct 24, 2005 · Penalty $5,300
Resolve - Non-hazardous
Failure to maintain building: as noted: at a two storied brick frame structure the underside of the ceiling @ the pourch has a serious water condition approx. 5' x 5' @ the west side of the ceiling. note: crack
Oct 24, 2005 · Penalty $350
Resolve
Complaints
- Safety
Fire escape
Mar 25, 2026 · Apt 3D
Close - Safety
Sprinkler
Mar 25, 2026 · Apt 3D
Close - Safety
Fire escape
Mar 25, 2026 · Apt BLDG
Close - Door/window
Door
Feb 25, 2026 · Apt 4D
Close - Door/window
Door
Feb 7, 2026 · Apt 4D
Close - Flooring/stairs
Floor
Feb 7, 2026 · Apt 4D
Close - Door/window
Window frame
Feb 7, 2026 · Apt 4D
Close - Flooring/stairs
Floor
Jan 27, 2026 · Apt 4D
Close - Unsanitary condition
Mold
Oct 16, 2025 · Apt 4E
Close - Door/window
Door
Jan 3, 2025 · Apt 4D
Close
Show 40 more ↓
- Door/window
Window frame
Jan 3, 2025 · Apt 4D
Close - Unsanitary condition
Pests
Jul 31, 2024 · Apt 5C
Close - Unsanitary condition
Garbage/recycling storage
Dec 29, 2022 · Apt BLDG
Close - Safety
Carbon monoxide detector
Sep 30, 2021 · Apt 2E
Close - Appliance
Electric/gas range
Sep 30, 2021 · Apt 2E
Close - Unsanitary condition
Mold
Aug 17, 2021 · Apt 3D
Close - Unsanitary condition
Mold
Jul 23, 2021 · Apt 3D
Close - Heat/hot water
Apartment only
Jan 6, 2020 · Apt 2E
Close - Heat/hot water
Apartment only
Dec 28, 2019 · Apt 2E
Close - Heating
Heat related
Mar 17, 2009 · Apt BSMT
Close - Heating
Heat related
Jan 17, 2009 · Apt 2
Close - Heating
Heat related
Dec 13, 2008 · Apt 2
Close - General
Cooking gas
Dec 11, 2008 · Apt 2FL
Close - Heating
Heat related
Dec 11, 2008 · Apt 2FL
Close - General
Cooking gas
Dec 9, 2008 · Apt 2FL
Close - Heating
Heat related
Dec 9, 2008 · Apt 2FL
Close - Heating
Heat related
Dec 9, 2008 · Apt BLDG
Close - General
Mold
Jan 12, 2006 · Apt 2
Close - Heating
Heat related
Jan 9, 2006 · Apt 2
Close - Nonconst
Vermin
Jan 9, 2006 · Apt 2
Close - Nonconst
Vermin
Jan 9, 2006 · Apt 2
Close - Nonconst
Vermin
Jan 9, 2006 · Apt 2
Close - General
Mold
Jan 9, 2006 · Apt 2
Close - General
Mold
Jan 9, 2006 · Apt 2
Close - Nonconst
Vermin
Oct 21, 2005 · Apt 1FL
Close - Plumbing
Water-leaks
Oct 21, 2005 · Apt BSMT
Close - Plumbing
Water supply
Oct 21, 2005 · Apt 1FL
Close - Plumbing
Radiator
Oct 21, 2005 · Apt 1FL
Close - Paint/plaster
Wall
Oct 21, 2005 · Apt 1FL
Close - Paint/plaster
Wall
Oct 21, 2005 · Apt 1FL
Close - Plumbing
Radiator
Oct 21, 2005 · Apt 1FL
Close - Plumbing
Radiator
Oct 21, 2005 · Apt 1FL
Close - General
Floor
Oct 21, 2005 · Apt 1FL
Close - Plumbing
Water-leaks
Oct 21, 2005 · Apt 1FL
Close - Paint/plaster
Ceiling
Oct 21, 2005 · Apt 1FL
Close - Paint/plaster
Ceiling
Oct 21, 2005 · Apt 1FL
Close - Electric
Lighting
Oct 21, 2005 · Apt 1FL
Close - General
Mold
Oct 21, 2005 · Apt 1FL
Close - Plumbing
Basin/sink
Oct 21, 2005 · Apt 1FL
Close - Electric
Lighting
Oct 21, 2005 · Apt BSMT
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2017
- Floors
- 7
- Residential units
- 25
- Building area
- 21,205 ft²
- Lot area
- 4,900 ft²
- Zoning
- R7-1
- Community board
- 309
- Council district
- 35
- Block / lot
- 1308 / 25
- Assessed value
- $2,085,750
- Landmark / historic district
- No
HPD registration #388597, last renewed Oct 6, 2025.
Questions about 264 Sullivan Place
Who owns 264 Sullivan Place?
The owner of record in NYC Department of City Planning PLUTO data is 262-264 Sullivan Group LLC.
Does 264 Sullivan Place have violations?
Yes. NYC HPD has recorded 37 housing violations at this property.
Is 264 Sullivan Place rent stabilized?
NYC Department of Finance tax bills listed 10 rent-stabilized units here in 2024 (about 40% of its 25 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 264 Sullivan Place built?
City records list 2017 as the year it was built.
How many apartments are in 264 Sullivan Place?
It has 25 residential units and 26 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.