roofy

1180 President Street

Brooklyn, NY 11225BBL 3-01282-0034Map

Owner of record: Mhany Cluster Housing Development Fund C Orporation

1180 President Street is a walk-up apartment building built in 1915 in Brooklyn, 11225. It has 19 residential units across 4 floors. The owner of record is Mhany Cluster Housing Development Fund C Orporation. HPD has recorded 1,629 housing violations here, most recently on September 14, 2026. 34 of the 50 most recent violations are still open. City tax records listed 20 rent-stabilized apartments here in 2024.

HPD violations
1,629
DOB violations
29
ECB violations
46
HPD complaints
1,527

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 14, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
20
About 100% of the building's 19 apartments
Up from 19 in 2019

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 1,629

  • B

    Fire egress defective. remove the obstruction in fireproof passageway consisting of construction material at fire passage way

    Sep 14, 2026

    Open — Nov certified on time
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 3rd story balcony at 1st stack from west at north (building front) at fire escape

    Sep 14, 2026

    Open — Nov sent out
  • B

    Provide dwelling with a janitor or responsible person or janitorial service.

    Sep 14, 2026

    Open — Nov sent out
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Sep 14, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor . frame missing at wall at public hall, 1st story

    Sep 14, 2026

    Open — Nov sent out
  • B

    Fire egress defective. remove the obstruction in fireproof passageway free standing wood door and the storage of construction materails at, northwest section, exit corridor, building front yard at fire passage way

    Sep 2, 2026

    Open — Nov certified on time
  • B

    Properly repair with similar material the broken or defective cracked and missing mortar at, ceiling exit corridor , northwest section, building front yard at fire passage way

    Sep 2, 2026

    Open — Nov sent out
  • B

    Replace with new the missing iron guardrails above stair below grade at southwest secrion, building front yard, at fire passage way

    Sep 2, 2026

    Open — Nov sent out
  • B

    Replace with new the missing grab bars at walls, to bathtub and water closet in the bathroom located at apt 11, 3rd story, 2nd apartment from west at north

    Sep 2, 2026 · Apt 11

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department wood baseboards at north and south walls in the private hallway located at apt 11, 3rd story, 2nd apartment from west at north

    Sep 2, 2026 · Apt 11

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective wood floor in the 2nd room from north at west located at apt 11, 3rd story, 2nd apartment from west at north

    Sep 2, 2026 · Apt 11

    Open — Civ14 mailed
  • B

    Abate the nuisance consisting of pests. evidence of spiders in the entire apartment located at apt 11, 3rd story, 2nd apartment from west at north

    Sep 2, 2026 · Apt 11

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 11, 3rd story, 2nd apartment from west at north

    Sep 2, 2026 · Apt 11

    Open — Notice of issuance sent to tenant
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 11, 3rd story, 2nd apartment from west at north

    Sep 2, 2026 · Apt 11

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective wood floor in the foyer located at apt 11, 3rd story, 2nd apartment from west at north

    Sep 2, 2026 · Apt 11

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wood saddle at entrance door south wall in the foyer located at apt 11, 3rd story, 2nd apartment from west at north

    Sep 2, 2026 · Apt 11

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 11, 3rd story, 2nd apartment from west at north

    Sep 2, 2026 · Apt 11

    Open — Nov sent out
  • B

    Replace with new the missing iron gurdrails above stair below grade at, northwest section, building 's front yard, at fire passage way

    Jul 23, 2026

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of aluminum ladder at, south wall, at public hall stairs, 1st story

    Jul 23, 2026

    Open — Nov certified on time
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes storage of household items at , balcony , buidling front yard, at fire escape, 3rd story

    Jul 23, 2026

    Open — Nov certified on time
  • B

    Properly repair or replace the broken or defective cracked wood door in the entrance at north wall in the 3rd room from north at west located at apt 3, 1st story, 2nd apartment from east at south , section ''south''

    Jul 23, 2026 · Apt 3

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective cracked wood door in the entrance at west wall in the 3rd room from north at east located at apt 3, 1st story, 2nd apartment from east at south , section ''south''

    Jul 23, 2026 · Apt 3

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperative in the entire apartment located at apt 3, 1st story, 2nd apartment from east at south , section ''south''

    Jul 23, 2026 · Apt 3

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperative in the entire apartment located at apt 3, 1st story, 2nd apartment from east at south , section ''south''

    Jul 23, 2026 · Apt 3

    Open — Civ14 mailed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3, 1st story, 2nd apartment from east at south , section ''south''

    Jul 23, 2026 · Apt 3

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective gasket at refrigerator door in the kitchen located at apt 3, 1st story, 2nd apartment from east at south , section ''south''

    Jul 23, 2026 · Apt 3

    Open — Civ14 mailed
  • B

    Properly repair or replace the broken or defective base cabinet door and interior at north wall in the kitchen located at apt 3, 1st story, 2nd apartment from east at south , section ''south''

    Jul 23, 2026 · Apt 3

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 5, 2026

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 11, 3rd story, 1st apartment from west at north

    Nov 20, 2025 · Apt 11

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system locked door at boiler room

    Nov 20, 2025

    Closed — Violation closed
  • B

    Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 9, 2nd story, 2nd apartment from east at south

    Jun 18, 2025 · Apt 9

    Open — First no access to re- inspect violation
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the kitchen located at apt 6, 2nd story, 2nd apartment from west at north

    May 10, 2025 · Apt 6

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north, the 2nd room from north at west, the bathroom , the 1st room from north at west, the foyer , the kitchen , the 1st room from north at east located at apt 6, 2nd story, 2nd apartment from west at north

    May 10, 2025 · Apt 6

    Open — Not complied with
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6, 2nd story, 2nd apartment from west at north

    May 10, 2025 · Apt 6

    Open — Not complied with
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 6, 2nd story, 2nd apartment from west at north

    May 10, 2025 · Apt 6

    Closed — Violation closed
  • A

    Properly repair the source and abate the evidence of a water leak at west wall in the kitchen located at apt 6, 2nd story, 2nd apartment from west at north

    May 10, 2025 · Apt 6

    Open — Not complied with
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the fire retaradant materials sheetrock ceiling in the kitchen located at apt 6, 2nd story, 2nd apartment from west at north

    May 10, 2025 · Apt 6

    Closed — Violation dismissed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 6, 2nd story, 2nd apartment from west at north

    May 10, 2025 · Apt 6

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 6, 2nd story, 2nd apartment from west at north

    May 10, 2025 · Apt 6

    Open — Not complied with
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 6, 2nd story, 2nd apartment from west at north

    May 10, 2025 · Apt 6

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... at the south wall in the 3rd room from north located at apt 4, 1st story, 1st apartment from south at west

    Apr 14, 2025 · Apt 4

    Closed — Violation closed
  • B

    Provide an adequate supply of gas to the fixtures at range for cooking in the kitchen located at apt 9, 2nd story, 2nd apartment from east at south

    Feb 25, 2025 · Apt 9

    Closed — Violation dismissed
  • B

    Provide an adequate supply of gas to the fixtures at range for cooking in the kitchen located at apt 9, 2nd story, 2nd apartment from east at south

    Feb 25, 2025 · Apt 9

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of rodents / rats at front court yard

    Jan 2, 2025

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 4, 1st story, 1st apartment from south at west

    Jan 2, 2025 · Apt 4

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of deep freezer with door intact at front court at public hall, 1st story

    Jan 2, 2025

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of electric bike at public hall, 1st story

    Jan 2, 2025

    Closed — Violation closed
  • C

    Abate the infestation consisting of rodents at front court at public hall, 1st story

    Jan 2, 2025

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... at south wall apprx. 10 sq. ft. in the 1st room from north located at apt 4, 1st story, 1st apartment from south at west

    Jan 2, 2025 · Apt 4

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the entire apartment located at apt 3, 1st story, 1st apartment from east at south

    Dec 23, 2024 · Apt 3

    Closed — Violation closed

DOB building violations · 29

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 9, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 31, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 31, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 31, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 3, 2018

    Dob violation - dismissed
Show 19 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 15, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 15, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 31, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 25, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 25, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jan 4, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 22, 2000

    Dob violation - active
  • Construction other optional

    C-construction other optional

    May 22, 2000

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jul 25, 1994

    Dob violation - dismissed

ECB violations · 46

  • Class - 2

    Ecb nov for failure to maintain. atoi observed in apts #8 &11, gas pipes & water lines not capped., repair and/or replace

    May 2, 2025

    Resolve
  • Class - 2

    Pswo issued for ww/op. atoi observed active construction work in apt #8 under active permit #b00480418-i1-gc. however, no pemit for plumbing work was filed with dob atoi. new water copper pipes installed. work

    May 2, 2025

    Resolve
  • Class - 1

    Pswo issued for ww/op. atoi observed active construction work in apt #8 under active permit #b00480418-i1-gc. however, no pemit for electrical work was filed with dob atoi. new breaker box, wiring, outlets, swi

    May 2, 2025 · Penalty $800

    Resolve
  • Class - 1

    Observed in the basement installed electric hot water heater using flexes hose on water lines. also no temperature relief valve discharge piped out which is contrary to code refer to section pc 504.6 (5), repai

    Mar 6, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping note:atoi observed excessiveamnts of stored household items.boxes wood black garbage bags thruout cellar&rearyd this poses safety hazard to occupants of bldg comply w/n

    Oct 14, 2022

    Resolve
  • Class - 1

    Bc3303.10 failure to comply w/tpp note:atoi observed work being performed under aforementioned job#.contractor failed to comply w/health requirement sec of tpp.theres excessive amnts of dust accumulation thruou

    Oct 14, 2022

    Resolve
  • Class - 1

    Failure to file for require tenant protection plan.note:at time of inspection observed work being performed under aforementioned job number submitted and filed job requires tpp due to 3 units #8 #9 #11 remainin

    Mar 29, 2022 · Penalty $10,000

    Resolve
  • Class - 1

    Filed certificate form,application etc containing material false statement.note:at time of inspection observed work being performed under aforemented job number in submitted & filed (pw-01) states building will

    Mar 29, 2022

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order contained in summons/violation#35381413h issued on 2/7/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. remedy:comply w/ commission

    Apr 4, 2019

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner.no fire stoppingper nc 712.3;27-345.noted:at cellar level.work has been done incomplete i saw holes throughout cellar in walls and ceiling no fire stopping

    Feb 7, 2019 · Penalty $625

    Resolve
Show 36 more ↓
  • Class - 1

    Filed a certificate of correction or other related materials containing materials false statement(s).noted:above construction co filed a certificate of correction for vio #35341616l on 10/10/18-under today insp

    Feb 7, 2019

    Resolve
  • Class - 2

    Failure to comply w/commissioner's order contained in summons/violation #35262027x issued on 10/15/18 and to file a certificate of correct tion pursuant to 28-201.1 and 1rcny 102-01. failure to maintain buildi

    Jan 8, 2019 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35362027x issued on 10-15-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg walls & appurtenances. remedy: comply

    Nov 21, 2018 · Penalty $625

    Resolve
  • Class - 1

    Reissued #35341617n failure to maintain building walls or appurtenancenoted:at roof level chimney missing mortar from joints,water entering building from exterior walls at exposures #2 & 4.rem:maintain building

    Oct 15, 2018

    Resolve
  • Class - 1

    Unlawful act. failure to comply with an order of the commissioner. records indicate no application filed to remove, correct and certify violations contained in summons #35344711n. rmdy: comply w/commission

    Sep 13, 2018 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35341617n issued on 07/20/2018 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commis

    Sep 5, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35341616l issued on 07/20/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi

    Sep 5, 2018 · Penalty $625

    Resolve
  • Class - 2

    48a,50,50a,50b,50c,50d,50e,50f,50g,50h,50i. 50-oil tank manhole gask et missing; 50a- coldwater pipes sweating onto boiler; 50b-cracks in base of chimney outside yard; 50c- cement blocks missing at oil tank

    Jul 24, 2018 · Penalty $625

    Active
  • Class - 1

    Failure to maintain bldg walls or appurtenances. roof level chimney mortar fall from(joint),& water entering bldg from exterior walls exp#2&4 needs repointing. remedy: maintain exterior bldg wall.

    Jul 20, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. no fire stopping per bc 712.3;27-345. cellar level no fire stop done thru-out cellar in walls & ceiling,foam used to fill holes no fire stop. remedy: provide/

    Jul 20, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. observed on 7-20-18at above address excessive amount of storage throughout the cellar level. remedy: repair & or replace.

    Jul 20, 2018

    Resolve
  • Class - 1

    Failure to ground electrical systems.observed at water main located in the cellar.main grounding conductor for buildings electrical systems disconnected from water main pipe;floating ground.please know that fai

    Jul 20, 2018 · Penalty $4,800

    Resolve
  • Class - 1

    Unapproved,unsafe,unsuitable electrical equipment,apparatus,materials,devices,appliances or wiring in user observed throughout cellar. exposed energized wiring methods,defective light fixtures,switches & recept

    Jul 20, 2018 · Penalty $4,000

    Resolve
  • Class - 1

    51 boiler is leaking. oil tank is leaking. repair all hazardous conditions immediately and call dob 232-393-2784 to lift cease use order.

    Jul 20, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. observed on 7/20/2018 @ above address fernco couplings installed throughout cellar. rem: repair &/or replace.

    Jul 20, 2018 · Penalty $625

    Resolve
  • Class - 1

    Failure to comply w/ the commissioner's order contained in summons# 35312941m & 35287516j issued on 9/25/17 & to file a c of c pursuant to 28-201.1, 28-204.4, 1rcny 102-01. summons# 35287516j cites expose wires

    Jul 5, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Unlawful act,failure to comply w/an order of the commissioner. records indicate no application filed to correct,certify & remove violations contained in summons#35287516j & 35274536y. remedy: comply w/comm's or

    Apr 18, 2018 · Penalty $6,250

    Resolve
  • Class - 2

    10a,21c,50. found cast iron boiler with no name plate. boiler has defects to correct. correct all violating conditions and submit a certificate of correction.

    Apr 11, 2018 · Penalty $625

    Active
  • Class - 1

    An unlawful act. failure to comply w/an order of the commissioner. failure to correct & certify summons#35274205j; issued on 10-24-17. remedy: comply w/ec code/obtain permit.

    Jan 3, 2018 · Penalty $2,400

    Resolve
  • Class - 1

    Unlawful acts,failure to comply w/an order of the commissioner. records indicate no application filed to correct remove & certify violations contained in summons#35287516j. remedy: comply w/comm's order.

    Oct 24, 2017 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. service equipment boiler. observed in boiler room in cellar back flow preventer on water supply to boiler leaking & flooding around boiler & fuel oil leaking

    Aug 9, 2017 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway. noted: observed at the west side of building, exit is obstructed by garbage bags, wood, pieces of gypsum wallboards, debris, buckets creating a trip hazard in an

    Aug 9, 2017 · Penalty $1,200

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. noted: observed at roof bulk head horizontal cracks, spalling plaster due to water penetration on three walls around skylight. remedy: repair and/or replac

    Aug 9, 2017

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. no fire stopping per bc 712.3; 27-345. noted: throughout cellar at various locations with no fire stopping provide. remedy: provide/maintain fire stopping.

    Aug 9, 2017

    Resolve
  • Class - 2

    Failure to provide ground fault circuit interrupter receptacle as required.observed sump pimp in boiler rm w/o a gfc1 type receptacle or fci ckt protection as required.rem comply w/ code/provide gfci protection

    Aug 9, 2017 · Penalty $2,400

    Resolve
  • Class - 1

    Unapproved/unsafe/unsuitable electrical equipment materials,apparatus,device appliance or wiring in use.observed open junction brakes,exposed energized wires,unsafe use of extension cords.also noted improper te

    Aug 8, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to maintain bldg in code-compliant manner: no fire stopping per bc712.3; 27-345. note: missing fire stopping around pipe penetration areas @ cellar level. rem: provide/maintain fire stopping.

    Mar 2, 2017 · Penalty $1,250

    Resolve
  • Class - 1

    Miscellaneous violation future connections exist on gas piping.at the time of inspection i observed in cellar numberous future connections existings on gas piping throughout the cellar which is contrary to the

    Mar 2, 2017 · Penalty $4,000

    Active
  • Class - 2

    Exit door not self closing. note: bulkhead exit door to roof level not self-closing. rem: repair/replace door.

    Mar 2, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. failure to comply with the commissioners order contained in summons/violation#35216302x issued on 10/24/16 and to file a certificate of corr

    Jan 19, 2017 · Penalty $800

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. at cellar level no fire stopping throughout at time of inspection(exposed)beams & joist. remedy: comply w/notice of violation.

    Oct 24, 2016 · Penalty $500

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. at the time of my inspection,12:45pm on 10/24/16 at the above place of occurance address i observed in the gas meter area in the cellar excessive storage which

    Oct 24, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    Sec. 408.2 misc violations: future connections installed on gas pipingdownstream of appliances. at the time of my inspection,12:45pm on 10/24/16 at the above place of occurrance address i observed in the cellar

    Oct 24, 2016 · Penalty $1,000

    Active
  • Non-hazardous

    Work w/o a permit. work noted:interior demolition of partition walls & celing throughout apt. #9 and 2nd fl. at premises.stop all work.remedy:obtain a permit if feasible, or restore to prior legal condition. ca

    Jan 4, 2005 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain defects are brickward loose,missing at chiminey at top.also chiminey out of plumb bricks hanging in danger of falling into court yard.chimney approx.8 height at roof at central.also bulkhead

    May 22, 2000 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain extencion building wall.defect is parapet wall at roof out of plums at front of building.leaning out fowards sidewalk approximately 4 at center.remedy:erect sidewalk shed immediately.make

    May 22, 2000 · Penalty $2,500

    Resolve

Complaints

  • Flooring/stairs

    Floor

    Aug 26, 2026 · Apt APT11

    Close
  • Paint/plaster

    Wall

    Aug 26, 2026 · Apt APT11

    Close
  • General

    Janitor/super

    Aug 20, 2026 · Apt 11

    Close
  • Water leak

    Slow leak

    Jul 18, 2026 · Apt 3

    Close
  • General

    Cabinet

    Jul 18, 2026 · Apt 3

    Close
  • Appliance

    Electric/gas range

    Jul 18, 2026 · Apt 3

    Close
  • Heat/hot water

    Entire building

    Jan 28, 2026 · Apt 11

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 29, 2025 · Apt 11

    Close
  • Heat/hot water

    Apartment only

    Dec 29, 2025 · Apt 11

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Dec 15, 2025 · Apt 7

    Close
  • Heat/hot water

    Apartment only

    Nov 19, 2025 · Apt 11

    Close
  • Heat/hot water

    Apartment only

    Nov 19, 2025 · Apt 11

    Close
  • Heat/hot water

    Apartment only

    Nov 4, 2025 · Apt 9

    Close
  • General

    Cooking gas

    Nov 4, 2025 · Apt 9

    Close
  • Electric

    Lighting

    Oct 9, 2025 · Apt 20

    Close
  • Heat/hot water

    Apartment only

    Jul 2, 2025 · Apt 9

    Close
  • Heat/hot water

    Apartment only

    Jun 30, 2025 · Apt 9

    Close
  • Plumbing

    Water supply

    Jun 29, 2025 · Apt 9

    Close
  • Heat/hot water

    Apartment only

    Jun 28, 2025 · Apt 9

    Close
  • Heat/hot water

    Apartment only

    Jun 26, 2025 · Apt 9

    Close
  • General

    Cooking gas

    Jun 26, 2025 · Apt 9

    Close
  • Heat/hot water

    Entire building

    Jun 26, 2025 · Apt 9

    Close
  • General

    Cooking gas

    May 21, 2025 · Apt 9

    Close
  • Heat/hot water

    Apartment only

    May 18, 2025 · Apt 9

    Close
  • General

    Cooking gas

    May 18, 2025 · Apt 9

    Close
  • Plumbing

    Water supply

    May 3, 2025 · Apt 9

    Close
  • General

    Cooking gas

    May 3, 2025 · Apt 9

    Close
  • Safety

    Window guard broken/missing

    May 3, 2025 · Apt 6

    Close
  • Paint/plaster

    Ceiling

    May 2, 2025 · Apt 4

    Close
  • Unsanitary condition

    Mold

    May 2, 2025 · Apt 4

    Close
  • Water leak

    Heavy flow

    May 2, 2025 · Apt 4

    Close
  • Electric

    Power outage

    Apr 28, 2025 · Apt 6

    Close
  • Unsanitary condition

    Mold

    Apr 9, 2025 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2025 · Apt 20

    Close
  • Plumbing

    Water supply

    Feb 1, 2025 · Apt 9

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2025 · Apt 9

    Close
  • General

    Cooking gas

    Feb 1, 2025 · Apt 9

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2025 · Apt 9

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2025 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jan 31, 2025 · Apt 9

    Close
  • Appliance

    Electric/gas range

    Jan 31, 2025 · Apt 9

    Close
  • Unsanitary condition

    Mold

    Dec 30, 2024 · Apt 4

    Close
  • Flooring/stairs

    Floor

    Dec 30, 2024 · Apt 4

    Close
  • Water leak

    Slow leak

    Dec 12, 2024 · Apt 3

    Close
  • Safety

    Fire escape

    Dec 12, 2024 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Nov 13, 2024 · Apt 3

    Close
  • General

    Cooking gas

    Sep 17, 2024 · Apt 9

    Close
  • Plumbing

    Water supply

    Sep 17, 2024 · Apt 9

    Close
  • General

    Cooking gas

    Sep 1, 2024 · Apt 9

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1915
Floors
4
Residential units
19
Building area
16,600 ft²
Lot area
6,387 ft²
Zoning
R6
Community board
309
Council district
35
Block / lot
1282 / 34
Assessed value
$631,800
Landmark / historic district
No

HPD registration #303739, last renewed Oct 17, 2025.

Questions about 1180 President Street

Who owns 1180 President Street?

The owner of record in NYC Department of City Planning PLUTO data is Mhany Cluster Housing Development Fund C Orporation.

Does 1180 President Street have violations?

Yes. NYC HPD has recorded 1,629 housing violations at this property.

Is 1180 President Street rent stabilized?

NYC Department of Finance tax bills listed 20 rent-stabilized units here in 2024 (about 100% of its 19 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 1180 President Street built?

City records list 1915 as the year it was built.

How many apartments are in 1180 President Street?

It has 19 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.