1600 Bedford Avenue
Brooklyn, NY 11225BBL 3-01280-0039Map
Owner of record: 1600 Atm Realty LLC
1600 Bedford Avenue is a walk-up apartment building built in 1917 in Brooklyn, 11225. It has 16 residential units across 4 floors. The owner of record is 1600 Atm Realty LLC. HPD has recorded 182 housing violations here, most recently on April 22, 2026. 5 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 182
- DOB violations
- 9
- ECB violations
- 3
- HPD complaints
- 504
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 182
- BHazardous
Replace with new the missing escutheon plate at top and bottom of heat riser pipe in the 1st room from north located at apt 3b, 3rd story, 2nd apartment from south at west
Apr 22, 2026 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing escutheon plate at top and bottom of heat riser pipe in the bathroom located at apt 3b, 3rd story, 2nd apartment from south at west
Apr 22, 2026 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 2nd apartment from south at west
Apr 22, 2026 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of slide bolt capable of being padlock at door in the entrance located at apt 3c, 3rd story, 1st apartment from north at east
Apr 12, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Apr 12, 2026 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Apr 12, 2026 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Apr 12, 2026 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door , 1st story
May 8, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch at vestibule door , 1st story
May 8, 2024
Closed — Violation dismissed - ANon-hazardous
Replace with standard wire glass the present glass at vestibule door , 1st story
Apr 22, 2024
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Remove all encumbrances consisting of construction materials at public hall, 1st story
Apr 22, 2024
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at balcont at front at fire escape, 4th story
Apr 22, 2024
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Apr 22, 2024
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story
Apr 22, 2024 · Apt 3C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3c, 3rd story
Apr 22, 2024 · Apt 3C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entrance located at apt 3c, 3rd story, 1st apartment from north at east
Mar 25, 2024 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 3c, 3rd story, 1st apartment from north at east
Mar 25, 2024 · Apt 3C
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots 3rd. sty front of building fire escape at fire escape, 3rd story
Mar 25, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 25, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story
Mar 25, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 6, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Apr 6, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 7, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 7, 2021
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors at entrance to south fire passage way at public hall, 1st story
Oct 23, 2019
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots on 4th story balcony at building front
Oct 10, 2019
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors , in the entrance located at apt 4b, 4th story, 2nd apartment from south at west
Oct 10, 2019 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 4b, 4th story, 2nd apartment from south at west
Oct 10, 2019 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors leading to inner court at public hall, 1st story
Aug 26, 2019
Closed — Violation closed - BHazardous
Replace with new the missing marble tread 2nd up from bottom at stairs near door to inner court at public hall, 1st story
Aug 26, 2019
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint the front fire escape at all stories
Jul 25, 2019
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors ( fire door ) 1st from east at south at public hall, 1st story
Jul 25, 2019
Closed — Violation closed - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at front entrance door to building , 1st story
Jul 9, 2019
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at front entrance door to building , 1st story
Jul 9, 2019
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective mortar joints (eroded) at brickwork west wall in the 1st room from east at south located at apt 4c, 4th story, apartment at east
Feb 6, 2019 · Apt 4C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the 1st room from east at south located at apt 4c, 4th story, apartment at east
Feb 6, 2019 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt 4c, 4th story, apartment at east
Feb 6, 2019 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective mortar joints [eroded] at brickwork at south wall in the kitchen located at apt 4c, 4th story, 1st apartment from north at east
Feb 6, 2019 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective 4th marble nosing up from bottom at intermediate landing (trip hazard) at public hall stairs, 2nd story
Feb 6, 2019
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective mortar joints [eroded] at brickwork west wall in the 1st room from east at south located at apt 4c, 4th story, 1st apartment from north at east
Feb 6, 2019 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at north wall inside closet in the 1st room from east at center located at apt 4c, 4th story, 1st apartment from north at east
Feb 6, 2019 · Apt 4C
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wiring at north wall in the 1st room from east at center located at apt 4c, 4th story, 1st apartment from north at east
Feb 6, 2019 · Apt 4C
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors ... in the entrance located at apt 3c, 3rd story, 1st apartment from north at east
Oct 4, 2018 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from east at north located at apt 3c, 3rd story, 1st apartment from north at east
Oct 4, 2018 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective wood sub flooring in walking area in the 3rd room from east at north located at apt 3c, 3rd story, 1st apartment from north at east
Oct 4, 2018 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east
Oct 4, 2018 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 1st room from east at north located at apt 3c, 3rd story, 1st apartment from north at east
Oct 4, 2018 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east
Oct 4, 2018 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at north located at apt 3c, 3rd story, 1st apartment from north at east
Oct 4, 2018 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 4b, 4th story, 2nd apartment from south at west
Feb 9, 2016 · Apt 4B
Closed — Violation closed
DOB building violations · 9
- Construction other optional
C-construction other optional
Aug 29, 2019
Dob violation - active - Construction other optional
C-construction other optional
Aug 29, 2019
Dob violation - active - Construction other optional
Borough comm. has ordered all work stopped under permit#321127400 on 0 2/08/17 this stop work order issued due to the appl. of record has wit hdrawn from the project. unable to verify percentage of work completed stop all work immediately make site safe contact borough comm. office at 718 802-3677 for info
Feb 10, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 3
- Class - 1
Failure to maintain exterior building in a code-compliant manner. bricks over lintel of double window at 4th floor front facade, left side dislodged and fell to street. bricks at right side bulging. approximate
Apr 14, 2018 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintain bldg. defects noted: apt 1b living room and bathroom floors out of plumb and also sagging. remedy: repair and/or replace.
Nov 8, 2007
Resolve - Non-hazardous
Work w/o a permit.work noted:opening approx 7' x 8' between dining room & living room has been sealed creating 1 bdrm apt 1b.remedy:obtain permit.
Sep 21, 2007 · Penalty $500
Resolve
Complaints
- Unsanitary condition
Pests
Apr 1, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Mar 20, 2026 · Apt 3B
Close - Plumbing
Radiator
Mar 20, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Mar 20, 2026 · Apt 4C
Close - Unsanitary condition
Pests
Mar 20, 2026 · Apt 3C
Close - Plumbing
Bathtub/shower
Dec 29, 2025 · Apt 3B
Close - Unsanitary condition
Pests
Dec 29, 2025 · Apt 3B
Close - Unsanitary condition
Pests
Mar 20, 2024 · Apt 3C
Close - Unsanitary condition
Pests
Mar 10, 2024 · Apt 3C
Close - Heat/hot water
Entire building
Dec 23, 2022 · Apt BLDG
Close
Show 40 more ↓
- Water leak
Slow leak
Dec 7, 2021 · Apt 2A
Close - General
Bell/buzzer/intercom
Jun 7, 2021 · Apt 4D
Close - Heat/hot water
Apartment only
Nov 18, 2020 · Apt 3A
Close - Heat/hot water
Apartment only
Feb 15, 2020 · Apt 4B
Close - Heat/hot water
Apartment only
Feb 15, 2020 · Apt 2C
Close - Heat/hot water
Entire building
Feb 15, 2020 · Apt 2B
Close - Heat/hot water
Apartment only
Nov 9, 2019 · Apt 2C
Close - Plumbing
Water supply
Oct 19, 2019 · Apt 4C
Close - Heat/hot water
Apartment only
Oct 9, 2019 · Apt 4B
Close - Unsanitary condition
Pests
Aug 6, 2019 · Apt 1C
Close - General
Cabinet
Jul 13, 2019 · Apt 2C
Close - Unsanitary condition
Pests
Jul 13, 2019 · Apt 2C
Close - Paint/plaster
Wall
Jun 28, 2019 · Apt 2C
Close - Heat/hot water
Entire building
Feb 8, 2019 · Apt 4A
Close - Heat/hot water
Apartment only
Feb 7, 2019 · Apt 4D
Close - Heat/hot water
Apartment only
Feb 3, 2019 · Apt 4C
Close - General
Cooking gas
Feb 3, 2019 · Apt 4C
Close - Unsanitary condition
Mold
Feb 3, 2019 · Apt 4C
Close - Electric
Wiring
Feb 3, 2019 · Apt 4C
Close - Electric
Wiring
Feb 3, 2019 · Apt 4C
Close - Safety
Smoke detector
Feb 3, 2019 · Apt 4C
Close - General
Bell/buzzer/intercom
Feb 3, 2019 · Apt 4C
Close - Paint/plaster
Ceiling
Feb 3, 2019 · Apt 4C
Close - Safety
Carbon monoxide detector
Feb 3, 2019 · Apt 4C
Close - Heat/hot water
Apartment only
Feb 2, 2019 · Apt 4D
Close - Water leak
Heavy flow
Dec 21, 2018 · Apt 4D
Close - Water leak
Damp spot
Oct 3, 2018 · Apt 3C
Close - Water leak
Damp spot
Oct 3, 2018 · Apt 3C
Close - Flooring/stairs
Floor
Oct 3, 2018 · Apt 3C
Close - Paint/plaster
Ceiling
Oct 3, 2018 · Apt 3C
Close - Paint/plaster
Ceiling
Oct 3, 2018 · Apt 3C
Close - Heat/hot water
Entire building
Feb 8, 2018 · Apt 2B
Close - Water leak
Heavy flow
Jan 9, 2018 · Apt 2D
Close - Water leak
Slow leak
Dec 7, 2017 · Apt 2D
Close - Heat/hot water
Apartment only
Dec 6, 2017 · Apt 4B
Close - General
Ventilation system
Mar 30, 2017 · Apt 4A
Close - Heat/hot water
Apartment only
Feb 13, 2017 · Apt 4C
Close - Heat/hot water
Apartment only
Nov 8, 2016 · Apt 3A
Close - Heat/hot water
Apartment only
Apr 11, 2016 · Apt 3A
Close - Heat/hot water
Apartment only
Feb 29, 2016 · Apt 3A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1917
- Floors
- 4
- Residential units
- 16
- Building area
- 16,500 ft²
- Lot area
- 5,000 ft²
- Zoning
- R6
- Community board
- 309
- Council district
- 35
- Block / lot
- 1280 / 39
- Assessed value
- $695,250
- Landmark / historic district
- No
HPD registration #319230, last renewed Jul 29, 2025.
Questions about 1600 Bedford Avenue
Who owns 1600 Bedford Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1600 Atm Realty LLC.
Does 1600 Bedford Avenue have violations?
Yes. NYC HPD has recorded 182 housing violations at this property.
Is 1600 Bedford Avenue rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 100% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1600 Bedford Avenue built?
City records list 1917 as the year it was built.
How many apartments are in 1600 Bedford Avenue?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.