876 Lincoln Place
Brooklyn, NY 11213BBL 3-01263-0009Map
Owner of record: 876 LLC
876 Lincoln Place is a walk-up apartment building built in 1909 in Brooklyn, 11213. It has 16 residential units across 4 floors. The owner of record is 876 LLC. HPD has recorded 129 housing violations here, most recently on April 15, 2026. 30 of the 50 most recent violations are still open. City tax records listed 11 rent-stabilized apartments here in 2024.
- HPD violations
- 129
- DOB violations
- 25
- ECB violations
- 27
- HPD complaints
- 435
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 129
- BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and east wall in the bulkhead
Apr 15, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and east wall in the bulkhead
Apr 15, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling at bulkhead
Apr 15, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 16, 4th story, 1st apartment from north at east
Mar 13, 2026 · Apt 16
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulked door at north wall at public hall, 4th story
Mar 13, 2026
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Feb 24, 2026
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 11, 3rd story, 2nd apartment from west at north
Dec 13, 2025 · Apt 11
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 11, 3rd story, 2nd apartment from west at north
Dec 13, 2025 · Apt 11
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east, south, west, and north walls in the 1st room from east located at apt 11, 3rd story, 2nd apartment from west at north
Dec 13, 2025 · Apt 11
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north, east, and west walls in the private hallway located at apt 11, 3rd story, 2nd apartment from west at north
Dec 13, 2025 · Apt 11
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east, south, west, and north walls in the foyer located at apt 11, 3rd story, 2nd apartment from west at north
Dec 13, 2025 · Apt 11
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 11, 3rd story, 2nd apartment from west at north
Dec 13, 2025 · Apt 11
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at sink in the kitchen located at apt 11, 3rd story, 2nd apartment from west at north
Dec 13, 2025 · Apt 11
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 11, 3rd story, 2nd apartment from west at north
Dec 13, 2025 · Apt 11
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective bathtub with enamel porcelain paint by the process of reglazing in the bathroom located at apt 11, 3rd story, 2nd apartment from west at north
Dec 13, 2025 · Apt 11
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north, east, and south walls in the bathroom located at apt 11, 3rd story, 2nd apartment from west at north
Dec 13, 2025 · Apt 11
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt 11, 3rd story, 2nd apartment from west at north
Dec 13, 2025 · Apt 11
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt 11, 3rd story, 2nd apartment from west at north
Dec 13, 2025 · Apt 11
Open — Nov sent out - BHazardous
Repair the leaky and/or defective water supply pipe at washbasin in the bathroom located at apt 11, 3rd story, 2nd apartment from west at north
Dec 13, 2025 · Apt 11
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east, south, west, and north walls in the kitchen located at apt 11, 3rd story, 2nd apartment from west at north
Dec 13, 2025 · Apt 11
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1, 1st story, 1st apartment from west at north
Nov 8, 2025 · Apt 1
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of bicycles , table and shopping cart. at public hall, 2nd story
Oct 20, 2025
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the bathroom located at apt 11, 3rd story, 2nd apartment from east at south
Aug 25, 2025 · Apt 11
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 11, 3rd story, 2nd apartment from east at south
Aug 25, 2025 · Apt 11
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing tread, 2nd from bottom at stairs between 2nd and 3rd story balcony at 2nd from east at fire escape
Jul 9, 2025
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 12, 3rd story, 1st apartment from north at east
Apr 5, 2025 · Apt 12
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mechancical stopper at washbasin drainage in the bathroom located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 2 square feet at the west wall, in the bathroom located at apt 11, 3rd story, 2nd apartment from west at north original violation 16141211 issued 04-aug-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 4, 2023 · Apt 11
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchenette located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Nov sent out - BHazardous
Replace the broken or defective waste pipe under sink in the kitchenette located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the foyer located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wooden subfloor in the kitchenette located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchenette located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures [ no gas to gas ranges ] in the kitchenette located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at the washbasin, in the bathroom located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the north wall in the 1st room from north at east located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden header frame at 1st window form west at north in the 1st room from north at east located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden window sill 1st from west at north in the 1st room from north at east located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden winscoting under window 1st from west at north in the 1st room from north at east located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenette located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the south and west walls in the bathroom located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 2 square feet at the west wall, in the bathroom located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 11, 3rd story, 2nd apartment from west at north
Aug 4, 2023 · Apt 11
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 23, 2023
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in the waste line at washbasin in the bathroom located at apt 11, 3rd story, 2nd apartment from west at north
Aug 30, 2022 · Apt 11
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 11, 3rd story, 2nd apartment from west at north
Aug 30, 2022 · Apt 11
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 11, 3rd story, 2nd apartment from west at north
Aug 30, 2022 · Apt 11
Closed — Violation closed - BHazardous
Properly repair the broken or defective base cabinets in the kitchen located at apt 11, 3rd story, 2nd apartment from west at north
Aug 30, 2022 · Apt 11
Open — Nov sent out
DOB building violations · 25
- Construction other optional
Failure to maintain building in a code compliant manner. at the time of inspection observed cracked and damaged window sill at multiple locations at exp 1 north elevations. remedy: repair and/or replace
Sep 12, 2026
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner. at time of insp ection observed building with multiple stress cracks on all facade wal ls compromising building integrity. remedy: submit engineers report ev aluating structural stability of cited conditions to ertinspections@bu ildings.nyc.gov 718-286-3460
Nov 27, 2025
Dob violation - active - Construction other optional
Failure to maintain building in a code compliant manner as per section 28.301.1 of the nyc admin code. noted at time of inspection observed cracked and damaged window sills at exposure one. remedy: repair and/or replace
Nov 20, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2024
Dob violation - active - Construction other optional
Emergency wrk.exp2(east)brck wall has an outwrd leaningparapet at top, from exp1/2crnr to apprx 2ft frm exp2/3(southeast)crnrcontinuous crck@ middle wndows frm cellar to roof@exp2 wall.crcks.comply with dob violation #101123feu30801bs immediately
Jan 11, 2024
Dob violation - active - Construction other optional
C-construction other optional
Oct 11, 2023
Dob violation - dismissed - Construction other optional
Ftm.fire escape@exp2 in state of disrepair.missng bolt&broknbolt@exp2 (east)fire escape gooseneck.unboltd connection@railng brace @top level of exp2(east)fire escape gooseneck.unboltd [email protected] pe qewi to immed eval all fire escapes&&design rpairs,2.if prmt req'd for rpairs per code,file by 11/24/23
Oct 11, 2023
Dob violation - active - Construction other optional
Emergency work.exp2(east)brck wall has an outwrd leaningparapet @top, from exp1/2crnr to apprx 2ft frm exp2/3(southeast)crnrcontinuous crck@ middle wndows frm cellar to roof@exp2 wall.crcks.1.immed install sdwalk shed in rear yrd@exp2 w/overhaul into neighbr's rear yrd, 2.immed rmve leaning parapet&replace in
Oct 11, 2023
Dob violation - active - Construction other optional
Additional info:crckc obsrvd in stone&brck masonry @exp1(north),exp2 (east),&exp4(west)exterior walls.prev pointed crcks@exp4 have.reopened in mult loctns.crcks obsrvd @ interior finishes on uppr.comply with dob violation #011923feu30801bs immediately
May 9, 2023
Dob violation - active - Construction other optional
Failure to comply with commissioner's order:dob violation #011923feu30802bs(control#341112)required to ext walls undr permit w/ filing by 3/20/23&work to start undr permit by 4/3/23.this violation was issued on 1/19/23.no completed filing or permit exists for repairs as of 5/9/23
May 9, 2023
Dob violation - active
Show 15 more ↓
- Construction other optional
Ftm.mult crcks osbvd in stone&brck masonry @exp1(north),exp2(east),& exp4(west)ext walls.prev pointed crcks@exp4 have reopened in mult loctns.crcks osbvd@int finishes on upper lvls.no access to cellar 1.nyspe strctrl eng to immed eval ent bldg&design repairs,2.file for rpairs by 3/20/23,3.obtn prmt&strt wrk by 4/3/23
Jan 19, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 27, 2022
Dob violation - active - Immediate emergency anythingoptional
Erect approximately 40 feet of side walk shed at exposure # 1 to safe guard the public and property
Mar 8, 2022
Dob violation - active - Immediate emergency anythingoptional
Install an approximate total of 135 linear feet of sidewalk shed
Jan 31, 2022
Dob violation - active - Construction other optional
At the time of inspection it was observed that the building exterior was bulging at exposure #4 and there was cracks throughout the exterior along with cracks throughout the interior. there was access to an apartment on the first floor where the floors were sloped and sagging and door could not open and close due to shifting.
Jan 30, 2022
Dob violation - active - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Apr 25, 2012
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 2, 2007
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Construction other optional
Ecb hazardous
Sep 7, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 3, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 27
- Class - 2
Pedestrian protection does not meet code specifications. at the time of inspection observed at exp #1 north elevation defective-loose and bulging parapet panels for the sidewalk shed. remedy: comply to code spe
Sep 12, 2026 · Penalty $2,400
Active - Class - 1
B3307.6.5.1 at time of inspection of a high wind advisory respondent fail to safeguard observed sidewalk shed installed at exp# 1 4. exp# 4 observed parapet panel missing, parapet panels were observed in pedest
Jun 7, 2026 · Penalty $10,000
Active - Class - 2
Temporary construction equipment or installation on site- expired permit. observed side walk shed on site with expire permit., renew permit
May 5, 2026 · Penalty $625
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 39072221j, file a certificate of correction
May 5, 2026 · Penalty $1,250
Active - Class - 1
Failure to maintain building in code complaint manner. observed at exp #4 cracks was found on first floor window and opening in the building facade estimated 30 by 18 inches., repair and/replace
May 5, 2026 · Penalty $6,250
Active - Class - 1
Failure to comply with commissioner's order in dob violation vi022-00297 dated 01/30/2022. responded was required to submit an engineer's report concerning structurally deficient conditions. as of 05/05/2026, a
May 5, 2026 · Penalty $6,250
Active - Class - 1
Noted vertical cracking and defects in exterior wall at ground level plus building sides. defects may effect safety of structure in occupied building., obtain permit; repair structure
Nov 27, 2025 · Penalty $6,250
Active - Class - 1
Failure to maintain unobstructed exit passageway on fire escapes notedat time of inspection at exposure one numerous household objects on fire escapes. remedy: remove obstructed objects from fire escapes.
Nov 20, 2025 · Penalty $1,250
Resolve - Class - 2
Bc 3309.11 at the time of my inspection of a 4 story building with a sidewalk shed erections , i observed a tree at exposure # 2 under sidewalk shed without its necessary tree protection which creates a haza
Jun 17, 2025 · Penalty $2,500
Resolve - Class - 1
At time of inspection observed: supported scaffold on top of sidewalk shed 50' aprox. at corner exposure# 1-2. upon review department record it appear no supported scaffold active permit, creating an unsafe con
May 31, 2024 · Penalty $5,000
Active
Show 17 more ↓
- Class - 1
Failure to comply with the commissioner's order in dob violation vio22-00297, dated 1/30/2022. respondent was required to submit an engineer's report concerning structurally deficient conditions. as of 10/11/20
Oct 11, 2023 · Penalty $2,500
Active - Class - 2
At time of responding complaint observed: no construction activities, upon reviewing on department record it appear permit # b00672579-i1-sh was expired on 02/02/2023
Apr 14, 2023
Resolve - Class - 1
At time of responding complaint observed: sidewalk shed installed at expo# 1-4 upon reviewing on department record it appear no temporary electrical permit for sidewalk shed.
Apr 14, 2023
Resolve - Class - 1
Failure to comply with commissioner's order in dob violation vio22-00297,dated 1/30/22.respondent was required to submit engineer's report concerning structurally deficient conditions.as of 11/1/22 engineer's r
Nov 1, 2022
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. note: at time of inspection, observed the respondent failed to comply with the commissioner'
Oct 18, 2022
Resolve - Class - 1
Failure to maintain building in code compliant manner. note: at time of inspection, observed apartment 14 and 10 in a significant, hazardous state of disrepair. observed uneven, sloped, tilted floor and sign of
Oct 18, 2022 · Penalty $625
Active - Class - 1
At the time of inspection it was observed that there were cracks throughout the exterior and interior of the building. the building is buldging out at exposure #4 (new york ave). cracked decorative stone around
Jan 30, 2022 · Penalty $1,250
Active - Class - 1
Failure to maintain exterior building wall. at time of inspection observed large masonry chunks on public sidewalk in front of premises noted:also observed missing section of masonry window ornamental facade se
Apr 23, 2012 · Penalty $1,000
Resolve - Hazardous
Failure to maintain:defect is:cracks in n/west extension walls from grade thru 4th story (2)cracks in brick molding in various location at 1st story front.(3)metal cornice rusted and defective (4) walls peeling
Sep 7, 2001 · Penalty $800
Resolve - Hazardous
Failure to maintain building hazardous noted: in apt #2 the wall in the bathroom and closet is bulging and cracking due to a leak from the pipes. in the lobby entrance the wall is builing and the floor is crack
Aug 30, 2001 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain. defect is: all three (3) fire escapes on the building are severely rusted. remedy: repair defect.
May 7, 1999 · Penalty $350
Resolve - Hazardous
Failue to maintain exterior building wall. defet is various cracks north east and west end of wall and various cracks on west (n.y ave) wall also bulges on new york side. remedy: make all necessary repairs in a
Feb 13, 1998 · Penalty $2,500
Resolve - Hazardous
Failure to maintain. defect noted: all three fire escapes on bldg arerusted severly. drop ladder is rusted and has become partially unattached at fire escape at northwest corner of building.
Dec 3, 1997 · Penalty $2,500
Resolve - Hazardous
Failure to maintian exterior building wall. defect is third floor lintel rotted. 2 facade is spalling in various places at north and west sides of building. remedy: make all nexessary repairs and provide publ
May 9, 1997 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintian exterior buidling wall defect is third floor lintel is disintegrated and disintigration of concrete of various locationsat corner of buidling. remedy: make safe maintain exterior building
Dec 2, 1996 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior building wall in that (a) west wall facade adj: to new york is cracked vertically at 6 different places from ist to 2nd floors. (b) this said wall bulges out ward (at least 6" off p
Aug 24, 1995 · Penalty $1,000
Resolve - Hazardous
Failure to maintain extrior building wall and fell to the sidewalk. (d) third floor stone window lintel is disintagrated and a portion fell to the pavement. the remaining portion is in danger of falling as well
Aug 24, 1995 · Penalty $1,000
Resolve
Complaints
- General
Signage missing
Jul 24, 2026 · Apt BLDG
Close - General
Bell/buzzer/intercom
Jul 24, 2026 · Apt 16
Close - Electric
Wiring
Apr 15, 2026 · Apt BLDG
Close - Outside building
Roofing
Apr 15, 2026 · Apt BLDG
Close - Outside building
Roof door/hatch
Apr 15, 2026 · Apt BLDG
Close - Door/window
Window pane
Apr 15, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 15, 2026 · Apt 10
Close - Unsanitary condition
Pests
Apr 15, 2026 · Apt 10
Close - Safety
Smoke detector
Apr 15, 2026 · Apt 10
Close - Safety
Carbon monoxide detector
Apr 15, 2026 · Apt 10
Close
Show 40 more ↓
- Door/window
Door
Apr 15, 2026 · Apt 16
Close - Plumbing
Basin/sink
Mar 9, 2026 · Apt 16
Close - Paint/plaster
Ceiling
Mar 9, 2026 · Apt 16
Close - Water leak
Slow leak
Mar 9, 2026 · Apt 16
Close - Heat/hot water
Entire building
Feb 21, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 21, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 20, 2026 · Apt 15
Close - Plumbing
Water supply
Feb 20, 2026 · Apt 5
Close - Paint/plaster
Ceiling
Feb 9, 2026 · Apt 7
Close - Paint/plaster
Ceiling
Feb 9, 2026 · Apt 7
Close - Paint/plaster
Wall
Feb 9, 2026 · Apt 7
Close - Paint/plaster
Wall
Feb 9, 2026 · Apt 7
Close - Water leak
Slow leak
Feb 9, 2026 · Apt 7
Close - Heat/hot water
Apartment only
Jan 2, 2026 · Apt 6
Close - Plumbing
Radiator
Dec 16, 2025 · Apt 16
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Water leak
Heavy flow
Dec 3, 2025 · Apt APT1
Close - Water leak
Heavy flow
Dec 1, 2025 · Apt 11
Close - Appliance
Electric/gas range
Dec 1, 2025 · Apt 11
Close - Appliance
Refrigerator
Dec 1, 2025 · Apt 11
Close - Plumbing
Basin/sink
Dec 1, 2025 · Apt 11
Close - Flooring/stairs
Floor
Dec 1, 2025 · Apt 11
Close - Appliance
Electric/gas range
Dec 1, 2025 · Apt 11
Close - Door/window
Door
Nov 26, 2025 · Apt 5
Close - Paint/plaster
Wall
Nov 26, 2025 · Apt 5
Close - Flooring/stairs
Floor
Nov 26, 2025 · Apt 5
Close - Heat/hot water
Entire building
Nov 6, 2025 · Apt 1
Close - Appliance
Electric/gas range
Nov 2, 2025 · Apt 11
Close - Water leak
Heavy flow
Nov 2, 2025 · Apt 11
Close - Water leak
Heavy flow
Oct 25, 2025 · Apt 11
Close - Heat/hot water
Apartment only
Oct 23, 2025 · Apt 1
Close - Heat/hot water
Entire building
Oct 21, 2025 · Apt 116
Close - Heat/hot water
Entire building
Oct 17, 2025 · Apt 12
Close - Water leak
Heavy flow
Aug 10, 2025 · Apt 11
Close - Water leak
Heavy flow
Jul 1, 2025 · Apt 11
Close - Outside building
Roof door/hatch
Jan 27, 2025 · Apt BLDG
Close - Safety
Carbon monoxide detector
Jan 16, 2025 · Apt 12
Close - Unsanitary condition
Garbage/recycling storage
Jun 24, 2024 · Apt BLDG
Close - General
Bell/buzzer/intercom
Mar 24, 2024 · Apt FOURTH
Close - General
Bell/buzzer/intercom
Mar 24, 2024 · Apt 4
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1909
- Floors
- 4
- Residential units
- 16
- Building area
- 9,000 ft²
- Lot area
- 2,525 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 35
- Block / lot
- 1263 / 9
- Assessed value
- $432,900
- Landmark / historic district
- Crown Heights North II Historic District
HPD registration #333433, last renewed Aug 12, 2025.
Questions about 876 Lincoln Place
Who owns 876 Lincoln Place?
The owner of record in NYC Department of City Planning PLUTO data is 876 LLC.
Does 876 Lincoln Place have violations?
Yes. NYC HPD has recorded 129 housing violations at this property.
Is 876 Lincoln Place rent stabilized?
NYC Department of Finance tax bills listed 11 rent-stabilized units here in 2024 (about 69% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 876 Lincoln Place built?
City records list 1909 as the year it was built.
How many apartments are in 876 Lincoln Place?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.