767 Lincoln Place
Brooklyn, NY 11216BBL 3-01254-0050Map
Owner of record: Cyrus, Sarah
767 Lincoln Place is a walk-up apartment building built in 1910 in Brooklyn, 11216. It has 12 residential units across 4 floors. The owner of record is Cyrus, Sarah. HPD has recorded 324 housing violations here, most recently on October 17, 2026. 31 of the 50 most recent violations are still open. City tax records listed 10 rent-stabilized apartments here in 2024.
- HPD violations
- 324
- DOB violations
- 7
- ECB violations
- 0
- HPD complaints
- 291
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 324
- ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Oct 17, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall
Oct 17, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Oct 17, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Oct 17, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of construction materials at public hall, 1st story
Oct 17, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Sep 20, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Sep 20, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 20, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 19, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of construction materials at public hall, 1st story
Sep 19, 2026
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Sep 19, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Sep 19, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 19, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Sep 19, 2026
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchenette located at apt c3, 3rd story, 1st apartment from south at west
Aug 26, 2026 · Apt C3
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt c3, 3rd story, 1st apartment from south at west
Aug 26, 2026 · Apt C3
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchenette located at apt c3, 3rd story, 1st apartment from south at west
Aug 26, 2026 · Apt C3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain surface at bathtub in the bathroom located at apt c3, 3rd story, 1st apartment from south at west
Jul 11, 2026 · Apt C3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt c3, 3rd story, 1st apartment from south at west
Jul 11, 2026 · Apt C3
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Jan 17, 2026
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt c3, 3rd story, 1st apartment from south at west
Jan 17, 2026 · Apt C3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective reglaze enamel porcelain at bathtub in the bathroom located at apt c3, 3rd story, 1st apartment from south at west
Jan 17, 2026 · Apt C3
Closed — Violation closed - CImmediately hazardous
Properly secure the loose washbasin in the bathroom located at apt c3, 3rd story, 1st apartment from south at west
Jan 17, 2026 · Apt C3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen located at apt c3, 3rd story, 1st apartment from south at west
Jan 17, 2026 · Apt C3
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt c3, 3rd story, 1st apartment from south at west
Jan 17, 2026 · Apt C3
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story
Jan 17, 2026
Closed — Violation closed - BHazardous
Abate the nuisance consisting of pests. evidence of waterbugs in the entire apartment located at apt c3, 3rd story, 1st apartment from south at west
Jan 17, 2026 · Apt C3
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt c3, 3rd story, 1st apartment from south at west
Jan 17, 2026 · Apt C3
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 2nd story
Jan 17, 2026
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at building entrance , 1st story
Jan 17, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at west wall in the bathroom located at apt c3, 3rd story, 1st apartment from south at west
Jan 17, 2026 · Apt C3
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt c3, 3rd story, 1st apartment from south at west
Jan 8, 2026 · Apt C3
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of construction materials at public hall, 1st story
Jan 8, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mortise lock at vestibule door at public hall, 1st story
Jan 8, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroom located at apt c3, 3rd story, 1st apartment from south at west
Jan 8, 2026 · Apt C3
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt d2, 4th story, 1st apartment from west at north
Dec 9, 2025 · Apt D2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at center located at apt d2, 4th story, 1st apartment from west at north
Dec 9, 2025 · Apt D2
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north at center located at apt d2, 4th story, 1st apartment from west at north
Dec 9, 2025 · Apt D2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt d2, 4th story, 1st apartment from west at north
Dec 9, 2025 · Apt D2
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeded maximum allowable temperature of 130 degrees in the entire apartment located at apt d2, 4th story, 1st apartment from west at north
Dec 9, 2025 · Apt D2
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Nov 5, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Nov 5, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story
Nov 5, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt c3, 3rd story, 1st apartment from south at west
Mar 31, 2025 · Apt C3
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt c3, 3rd story, 1st apartment from south at west
Mar 31, 2025 · Apt C3
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt c3, 3rd story, 1st apartment from south at west
Mar 31, 2025 · Apt C3
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lower window counter balance in the 2nd room from north located at apt c3, 3rd story, 1st apartment from south at west
Mar 31, 2025 · Apt C3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt c3, 3rd story, 1st apartment from south at west
Mar 31, 2025 · Apt C3
Open — Not complied with
DOB building violations · 7
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Paint/plaster
Ceiling
Sep 19, 2026 · Apt C3
Close - Paint/plaster
Ceiling
Aug 26, 2026 · Apt C3
Close - Paint/plaster
Wall
Aug 26, 2026 · Apt C3
Close - Paint/plaster
Ceiling
Aug 26, 2026 · Apt C3
Close - Water leak
Damp spot
Aug 26, 2026 · Apt C3
Close - Door/window
Window frame
Jul 8, 2026 · Apt C3
Close - Safety
Smoke detector
Jul 8, 2026 · Apt C3
Close - Unsanitary condition
Mold
Jul 8, 2026 · Apt C3
Close - Paint/plaster
Wall
Jul 8, 2026 · Apt C3
Close - Plumbing
Bathtub/shower
Jul 8, 2026 · Apt C3
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jul 8, 2026 · Apt C3
Close - Door/window
Door
Jul 8, 2026 · Apt C3
Close - Safety
Carbon monoxide detector
Jul 8, 2026 · Apt C3
Close - Water leak
Heavy flow
May 30, 2026 · Apt C3
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt C3
Close - Paint/plaster
Ceiling
Jan 16, 2026 · Apt C3
Close - Paint/plaster
Wall
Jan 16, 2026 · Apt C3
Close - Water leak
Heavy flow
Jan 7, 2026 · Apt C3
Close - Paint/plaster
Ceiling
Jan 7, 2026 · Apt C3
Close - Paint/plaster
Wall
Jan 7, 2026 · Apt C3
Close - Plumbing
Bathtub/shower
Jan 6, 2026 · Apt C3
Close - Plumbing
Water supply
Jan 6, 2026 · Apt C3
Close - Paint/plaster
Wall
Jan 6, 2026 · Apt C3
Close - Water leak
Slow leak
Jan 6, 2026 · Apt C3
Close - Heat/hot water
Apartment only
Dec 8, 2025 · Apt B2
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 23, 2025 · Apt B2
Close - Heat/hot water
Apartment only
Nov 3, 2025 · Apt C1
Close - Water leak
Heavy flow
Nov 3, 2025 · Apt C3
Close - Heat/hot water
Entire building
Oct 28, 2025 · Apt BLDG
Close - Safety
Carbon monoxide detector
Sep 19, 2025 · Apt 2D
Close - Safety
Smoke detector
Sep 19, 2025 · Apt 2D
Close - Paint/plaster
Ceiling
May 2, 2025 · Apt D2
Close - Safety
Smoke detector
Mar 26, 2025 · Apt C3
Close - Unsanitary condition
Pests
Mar 26, 2025 · Apt C3
Close - Unsanitary condition
Pests
Mar 26, 2025 · Apt C3
Close - Flooring/stairs
Floor
Mar 26, 2025 · Apt C3
Close - Plumbing
Toilet
Mar 26, 2025 · Apt C3
Close - Safety
Carbon monoxide detector
Nov 1, 2024 · Apt C3
Close - Flooring/stairs
Floor
Nov 1, 2024 · Apt C3
Close - Unsanitary condition
Pests
Nov 1, 2024 · Apt C3
Close - Water leak
Slow leak
Nov 1, 2024 · Apt C3
Close - Paint/plaster
Ceiling
Nov 1, 2024 · Apt C3
Close - Plumbing
Toilet
Nov 1, 2024 · Apt C3
Close - Door/window
Window frame
Nov 1, 2024 · Apt C3
Close - Flooring/stairs
Floor
Nov 1, 2024 · Apt C3
Close - Unsanitary condition
Pests
Sep 30, 2024 · Apt C3
Close - Water leak
Slow leak
Sep 30, 2024 · Apt C3
Close - Safety
Carbon monoxide detector
Sep 30, 2024 · Apt C3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1910
- Floors
- 4
- Residential units
- 12
- Building area
- 8,712 ft²
- Lot area
- 4,354 ft²
- Zoning
- R6B
- Community board
- 308
- Council district
- 35
- Block / lot
- 1254 / 50
- Assessed value
- $354,150
- Landmark / historic district
- No
HPD registration #358052, last renewed Jul 16, 2025.
Questions about 767 Lincoln Place
Who owns 767 Lincoln Place?
The owner of record in NYC Department of City Planning PLUTO data is Cyrus, Sarah.
Does 767 Lincoln Place have violations?
Yes. NYC HPD has recorded 324 housing violations at this property.
Is 767 Lincoln Place rent stabilized?
NYC Department of Finance tax bills listed 10 rent-stabilized units here in 2024 (about 83% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 767 Lincoln Place built?
City records list 1910 as the year it was built.
How many apartments are in 767 Lincoln Place?
It has 12 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.