1515 Bedford Avenue
Brooklyn, NY 11216BBL 3-01253-0001Map
Owner of record: 1515 Bedford Avenue Realty LLC.
1515 Bedford Avenue is an elevator apartment building built in 2016 in Brooklyn, 11216. It has 142 residential units across 10 floors. The owner of record is 1515 Bedford Avenue Realty LLC.. HPD has recorded 5 housing violations here, most recently on April 13, 2026. 1 of the 5 most recent violations are still open. City tax records listed 142 rent-stabilized apartments here in 2024.
- HPD violations
- 5
- DOB violations
- 13
- ECB violations
- 39
- HPD complaints
- 13
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 5
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at compactor room at public hall, 3rd story
Apr 13, 2026
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective latch set at compactor door at public hall, 3rd story
Apr 13, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. at public hall, 1st story
Jul 17, 2023
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at building entrance door at south , 1st story
Jan 22, 2023
Closed — Violation closed - BHazardous
Provide provide security in the event of a power outage an acceptable mechanical heavy-duty lock and latch set at building entrance door at south , 1st story
Jan 22, 2023
Closed — Violation dismissed
DOB building violations · 13
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2020
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 16, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 28, 2018
Vp*-violation unserved ecb- dismissed
Show 3 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 21, 2015
Dob violation - dismissed
ECB violations · 39
- Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000
Oct 1, 2024
Resolve - Class - 1
Bc 3309.10 protection of roof.@the time of insp of a new 10 story bldg@bulkhead level,const work in progress.i observed that there were no roof protection for adjacent property property @exp#2 were const opera
Jan 27, 2018 · Penalty $400
Resolve - Class - 2
Pswo suspended scaffold licensed rigger designated unqualified forman noted: at time of inspection 2 men working in adjustable suspended scaffold with outrigger beams foreman on site does not have dob tear
Nov 1, 2017 · Penalty $400
Resolve - Class - 2
Work does not fonform to approved cd-5 noted: at time of inspection scaffold platform is 6 feet ong cd5 show 8-40. remedy: comply with code.
Nov 1, 2017 · Penalty $250
Resolve - Class - 2
3314.4.3.3 pswo supported scaffold. all components of and attachments to scaffold shall be inspected prior to use to verify that they are safe. noted: at time of inspection pipe scaffold used to install bric
Nov 1, 2017 · Penalty $800
Resolve - Class - 1
Osha 10hrs/at time of my inspection of a new 10 story building construction work in progress upon requesting workers performing tiles installation and plaster inside the building,for the osha 10hr card,3 of the
Sep 16, 2017 · Penalty $800
Resolve - Class - 1
Failure to institute and maintain safety equipmenht measures.at time of my inspection of a 10 story bldg at roof level, consttruction work progress. i observed that most of the workers on site were not wearing
Aug 22, 2017 · Penalty $12,500
Resolve - Class - 1
Failure to safeguard persons & property affected by construction operations. @ time of insp observed concrete slab @ adjacent property has cracked. crack begins behind construction fence @ center of property li
Jun 2, 2016 · Penalty $5,000
Resolve - Class - 1
Sec: bc3307.6.2. protection where required. note: @ time of insp of a 10 story bldg @ 5th flr level, construction work in progress. i observed that there were no overhead protection provided for egress & ingres
May 24, 2016 · Penalty $1,600
Resolve - Class - 1
Sec: bc3305.3.3.1. insp. note: @ time of insp of a 10 story bldg @ 5th flr level, concrete pouring operation in progress. upon request for insp logs to verify that reinforcing steel & forms conform to design co
May 24, 2016 · Penalty $1,600
Resolve
Show 29 more ↓
- Class - 2
Sec: bc3310.5.1. designated site safety manager or coordinator. note: @ time of insp of a 10 story bldg @ 5th flr level, construction work in progress. review of site safety logs reveal that ssm# 1397 had not s
May 24, 2016
Resolve - Class - 1
Sec: bc3301.6.1. design. note: @ time of insp of a 10 story bldg @ 5th flr level, construction work in progress. i observed safety embedded straps installed on top rebar & pictures provided by competent person
May 24, 2016 · Penalty $400
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. note: @ time of insp of a 10 story bldg @ 5th flr level construction work in progress. during my walkthrough i was alerted by fel
May 24, 2016 · Penalty $10,000
Resolve - Class - 2
Collection & containment. note: @ time of insp of a 10 story bldg @ 5th flr level, construction work in progress. i observed concrete washout being performed in a mini dumpster or pre-manufactured fabricated sp
May 24, 2016 · Penalty $1,200
Resolve - Class - 1
Sec: bc3307.2.1. obstruction of streets or sidewalk. note: @ time of bldg @ 5th flr, concrete pouring operation in progress. i observed sidewalk closed off & concrete pump truck arms extended on sidewalk. upon
May 24, 2016 · Penalty $400
Resolve - Class - 2
Sec: bc3310.9. additional site safety personnel. note: @ time of insp of a 10 story bldg @ 5th flr level, construction work in progress. review of concrete safety logs reveal that csm# 2435 designated for site
May 24, 2016
Resolve - Class - 1
Sec: bc3305.3.2. design of concrete formwork. note: @ time of insp of a 10 story bldg @ 5th flr level, w/ concrete pouting operation in progress. i observed concrete formwork for column spilling concrete @ vari
May 24, 2016 · Penalty $400
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction. no guardrails. at time of inspection observed an active construction site up to 9th fl. during the inspection noted that there
May 9, 2016 · Penalty $2,430
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no toe boards. at time of inspection observed an active construction site up to 4th fl. during the inspeciton noted that there
May 9, 2016 · Penalty $1,030
Resolve - Class - 1
Full swo on site. failure to provide pedestrian protection for sidewalks & walkway. noted:at time of inspection form work on going the formsare about 20 ft high & 2 ft from fence on exp. #1, #2, & # 4 of site
Mar 24, 2016 · Penalty $4,800
Resolve - Class - 2
Failure to provide approved plans at time of inspection. noted:no plancould be provided for construction fence permit #320592587 at time of inspection. remedy:provide approved plans/construction documents
Mar 24, 2016
Resolve - Class - 1
Sec. 3304.4 protection of sides of excavation. note: 10 sty bldg orderconstruction,observed at exp#3 rear of site sheer cut made by excavator not sheeted shored or supported as per code causing a hazardous cond
Sep 15, 2015 · Penalty $1,600
Resolve - Class - 1
Unlawfully continued work while on notice of stop work order: concreteoperations. note: 10 sty bldg under construction,stop work order currently in place for all concrete operations. observed workers doing form
Sep 15, 2015 · Penalty $4,800
Resolve - Class - 1
No conceret safety manager present during concrete operations as required.observed concrete being poured onto site from pump in street.partial stop work order issued pursuant to 28-207.2 and posted at site.note
Aug 31, 2015 · Penalty $1,200
Resolve - Class - 2
Failure to post dot permit for street and sidewalk closing.curb streetlane was closed and sidewalk closed for concrete pumping from truck o nto/into site.rem:provide required dot permits for sidewalk and street
Aug 31, 2015 · Penalty $250
Resolve - Class - 1
3301.2 failure to safeguard all persons and property during construction oprations.observed concrete being pumped from truck in street onto site without providing overhead protection in the form of sidewalk she
Aug 31, 2015 · Penalty $1,600
Resolve - Class - 2
Failure to provide approved/accepted plans at the jobsite.at the time of insp.no plans were provided for the lateral bracing of the underpinning at exp.#2 the pins are more than 6'in height and are required to
Jul 23, 2015
Resolve - Class - 2
Work does not conform to approved construction documents. at the time of inspection,excavation was done down to the bottom of footing level (at exp#1 & 3)before the installation of the raker piles stop work
Jul 23, 2015 · Penalty $250
Resolve - Class - 1
Sec. 3309.6 failure to adequately monitor adjoining bldg's during occavation related activity that may adversely affect adjoining bldg. at the time of inspection underpinning of the adjoining bldg at exp#2 and
Jul 23, 2015 · Penalty $1,600
Resolve - Class - 2
Failure to provide approved plan-site safety plan-@ site-upon inpection,construction work of major bldg commenced.excavation work for foundation in progress approx.7-8 workers @ site.@ time of insp.no approved
Mar 18, 2015
Resolve - Class - 1
Failure to have site safety manager present @ site-upon inspection,construction work of major bldg commenced.excavation for foundation work in progress,approx.7-8 workers @ site.@ time of insp.no site safety ma
Mar 18, 2015 · Penalty $1,200
Resolve - Class - 2
Failed to post dot permit for street sidewalk closing. note: at the time of my inspection on demo site work stopped presently approx 50 linear feet of roadway blocked off w/o any dot permit posted as required
Mar 3, 2014
Resolve - Class - 2
Sec. 3303.2.4. sanitary facilities. sanitary facilities shall be provided during construction,remodeling or demolition activities in accordance w/the nyc plumbing code. at the time of my inspection on demo site
Feb 28, 2014
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. noted: at time of inspection the demolition company wasnot following the plans did not install bracing at exp2 and exp4.rmdy:
Feb 27, 2014
Resolve - Class - 2
Sec. 3309.6 failure to monitor adjoining structure for movement in alldirection during excavation related activity that may adversely affectadjoining structures. noted: at time of inspection there was no
Feb 27, 2014
Resolve - Class - 1
Failure to maintain bldg in code compliant manner:vertical crack @ parapit wall,@ southeast corner of parapit,&bulding of bricks.above said bathroom are two(2)water resovors/water tanks on roof.rem:repair &or
Jun 29, 2010 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in code compliant manner note at the south side of premises at roof lvl south east corner section of exterior wall is crack bulging in danger of collapse hair line cracks running from r
Jun 22, 2010 · Penalty $1,000
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner.@ time of inspection observed @ right side of premises,exposure 4,along lincoln place,exterior metal staircase spanning all 3fls is blocked w/debris on staircas
Apr 28, 2010 · Penalty $500
Resolve - Class - 2
Failure to maintain building in code of complaint manner noted: 2 stories building (old movie theater) found with (collapse) plaster falling or ready to fall. remedy: repair or replace ceiling.
Nov 19, 2009 · Penalty $250
Resolve
Complaints
- Plumbing
Basin/sink
Sep 10, 2026 · Apt 6B
Close - Paint/plaster
Wall
Sep 10, 2026 · Apt 6B
Close - Electric
No lighting
Sep 10, 2026 · Apt 6B
Close - General
Ventilation system
Sep 10, 2026 · Apt 6B
Close - Paint/plaster
Wall
Sep 10, 2026 · Apt 6B
Close - Water leak
Slow leak
Sep 10, 2026 · Apt 6B
Close - Safety
Fire escape
Aug 18, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 16, 2026 · Apt 5F
Close - Unsanitary condition
Pests
Dec 29, 2025 · Apt 5C
Close - Electric
No lighting
Nov 6, 2025 · Apt 4G
Close
Show 3 more ↓
- Door/window
Door
Apr 18, 2023 · Apt 3I
Close - General
Ventilation system
Jan 13, 2023 · Apt 7D
Close - General
Ventilation system
Dec 29, 2022 · Apt 7D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2016
- Floors
- 10
- Residential units
- 142
- Building area
- 101,350 ft²
- Lot area
- 21,371 ft²
- Zoning
- R7D
- Community board
- 308
- Council district
- 35
- Block / lot
- 1253 / 1
- Assessed value
- $12,316,950
- Landmark / historic district
- No
HPD registration #388472, last renewed Jul 30, 2026.
Questions about 1515 Bedford Avenue
Who owns 1515 Bedford Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1515 Bedford Avenue Realty LLC..
Does 1515 Bedford Avenue have violations?
Yes. NYC HPD has recorded 5 housing violations at this property.
Is 1515 Bedford Avenue rent stabilized?
NYC Department of Finance tax bills listed 142 rent-stabilized units here in 2024 (about 100% of its 142 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1515 Bedford Avenue built?
City records list 2016 as the year it was built.
How many apartments are in 1515 Bedford Avenue?
It has 142 residential units and 144 units in total.