960 Sterling Place
Brooklyn, NY 11216BBL 3-01249-0007Map
Owner of record: 960 Sterling Pl Owners Corp
960 Sterling Place is an elevator apartment building built in 1938 in Brooklyn, 11216. It has 79 residential units across 6 floors. The owner of record is 960 Sterling Pl Owners Corp. HPD has recorded 210 housing violations here, most recently on September 21, 2026. 44 of the 50 most recent violations are still open. City tax records listed 19 rent-stabilized apartments here in 2024.
- HPD violations
- 210
- DOB violations
- 39
- ECB violations
- 9
- HPD complaints
- 339
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 210
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 1st room from north at east located at apt 4l, 4th story, 1st apartment from north at east
Sep 21, 2026 · Apt 4L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door knob in the entrance located at apt 4l, 4th story, 1st apartment from north at east
Sep 21, 2026 · Apt 4L
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at balcony at 1st fire escape from north at west exterior wall at fire escape, 2nd story
Aug 23, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling east south and north wall at public hall, 6th story, section at east
Jul 1, 2026
Open — Nov certified on time - ANon-hazardous
Properly repair with similar material the broken or defective fire retardent meterial at ceiling east south and north wall at public hall, 6th story, section at east
Jul 1, 2026
Open — Nov certified on time - CImmediately hazardous
Abate the infestation consisting of roaches at public hall, 1st story
Jun 30, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at compactor closet door at compactor closet, 6th story, section at east
Jun 16, 2026
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak above ceiling at public hall, 6th story
Jun 16, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at door at compactor closet, 6th story, section at east
Jun 16, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 6th story
Jun 16, 2026
Open — Nov certified on time
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 6th story
Jun 16, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th story
Jun 16, 2026
Open — Not complied with - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5l, 5th story, 1st apartment from north at east
Apr 7, 2026 · Apt 5L
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5j, 5th story, 3rd apartment from north at east
Apr 7, 2026 · Apt 5J
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3l, 3rd story, 1st apartment from north at east
Apr 7, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3j, 3rd story, 3rd apartment from north at east
Apr 7, 2026 · Apt 3J
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2l, 2nd story, 1st apartment from north at east
Apr 7, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1c, 1st story, 2nd apartment from south at west
Apr 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6d, 6th story, 1st apartment from west at north
Apr 7, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6c, 6th story, 2nd apartment from south at west
Apr 7, 2026 · Apt 6C
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6b, 6th story, 1st apartment from south at west
Apr 7, 2026 · Apt 6B
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6a, 6th story, 1st apartment from east at south
Apr 7, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5d, 5th story, 1st apartment from west at north
Apr 7, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5c, 5th story, 2nd apartment from south at west
Apr 7, 2026 · Apt 5C
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5a, 5th story, 1st apartment from east at south
Apr 7, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4d, 4th story, 1st apartment from west at north
Apr 7, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4a, 4th story, 1st apartment from east at south
Apr 7, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3e, 3rd story, 1st apartment from north at east
Apr 7, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3d, 3rd story, 1st apartment from west at north
Apr 7, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6n, 6th story, 2nd apartment from south at west
Apr 7, 2026 · Apt 6N
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2n, 2nd story, 2nd apartment from south at west
Apr 7, 2026 · Apt 2N
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3c, 3rd story, 2nd apartment from south at west
Apr 7, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2e, 2nd story, 1st apartment from north at east
Apr 7, 2026 · Apt 2E
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1g, 1st story, 1st apartment from east at south
Apr 7, 2026 · Apt 1G
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Feb 5, 2026 · Apt 6J
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Feb 5, 2026 · Apt 6J
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the bathroom located at apt 3f, 3rd story, 2nd apartment from north at east
Apr 22, 2025 · Apt 3F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, north wall in the 1st room from east at north located at apt 3f, 3rd story, 2nd apartment from north at east
Apr 22, 2025 · Apt 3F
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from south at west wall in the 1st room from east at north located at apt 3f, 3rd story, 2nd apartment from north at east
Apr 22, 2025 · Apt 3F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, north wall in the private hallway located at apt 3f, 3rd story, 2nd apartment from north at east
Apr 22, 2025 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 2nd apartment from north at east
Apr 22, 2025 · Apt 3F
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the 2nd room from east at south located at apt 3f, 3rd story, 2nd apartment from north at east
Apr 22, 2025 · Apt 3F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall, east wall in the bathroom located at apt 3f, 3rd story, 2nd apartment from north at east
Apr 22, 2025 · Apt 3F
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at washbasin in the bathroom located at apt 3f, 3rd story, 2nd apartment from north at east
Apr 22, 2025 · Apt 3F
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures at washbasin in the bathroom located at apt 3f, 3rd story, 2nd apartment from north at east
Apr 22, 2025 · Apt 3F
Open — Nov sent out - BHazardous
Repair the broken or defective connection at pipe wasteline at washbasin in the bathroom located at apt 3f, 3rd story, 2nd apartment from north at east
Apr 22, 2025 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Replace the broken or defective watercloset in the bathroom located at apt 3f, 3rd story, 2nd apartment from north at east
Apr 22, 2025 · Apt 3F
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 3f, 3rd story, 2nd apartment from north at east
Apr 22, 2025 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall in the private hallway located at apt 3f, 3rd story, 2nd apartment from north at east
Apr 22, 2025 · Apt 3F
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from west at north wall, 1st door frame from south at west wall in the 1st room from east at north located at apt 3f, 3rd story, 2nd apartment from north at east
Apr 22, 2025 · Apt 3F
Open — Nov sent out
DOB building violations · 39
- Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2020
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 25, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 25, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 10, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 23, 2009
Dob violation - resolved
Show 29 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Feb 23, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 11, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 11, 2008
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 1, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 1, 2003
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 2001
Dob violation - dismissed - Elevator elevatorrequired
3p2863
Mar 6, 2001
Dob violation - resolved - Elevator elevatorrequired
3p2864
Mar 6, 2001
Dob violation - resolved - Elevator elevatorrequired
3p2863
Jan 4, 2000
Dob violation - resolved - Elevator elevatorrequired
3p2864
Jan 4, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Elevator elevatorrequired
(74)capacity plate
Dec 21, 1989
Dob violation - resolved - Elevator elevatorrequired
(74)capacity plate
Dec 21, 1989
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 1988
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 1988
Dob violation - resolved - Elevator elevatorrequired
Return to service
Sep 28, 1988
Dob violation - resolved
ECB violations · 9
- Class - 2
Partial stop work for suspended scaffold. note at time of inspection i observed suspended scaffold in use without foreman on site. rem: comply with code.
Oct 6, 2017 · Penalty $400
Resolve - Class - 2
Failure to maintain bldg walls & appurtenances: i) defective window sills were found at (out). 6/f at west elevn by front courtyard w/5/f atwest elevn by west courtyard (new york ave). ii) objects were found
Jan 5, 2012 · Penalty $500
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner. noted: upon inspection of apt #1b the bathroom flr has collapsed to basement thru water damage & rotting reinforcement of concrete flr. remedy: supply engineer
Oct 19, 2009
Resolve - Non-hazardous
40b10,40s09.40b-new motor room door must be self closing.self locking & abled"elevator machine room".40s-remove wood bracing motor room door buck.
Jul 30, 2007
Resolve - Non-hazardous
55y13/55#7/39o2/10m7/28q3/25l7/8v1/38o2.55#= no oil in the machine.10m=2nd gib.28/q= door operator motor connection box,unguarded.25/l top emg exit cover cant open without toll
Feb 19, 2004 · Penalty $350
Resolve - Non-hazardous
40i10/59l7/23d6/23l10/25l7/8v1/10m7/25l= top emg exit cover dosn't open without toll.10m 2nd gib
Feb 19, 2004 · Penalty $350
Resolve - Non-hazardous
08v01/ 52r12/ 09m07/ 74i12/ 31q06/ 08v leveling 52r install cotter pins on brake 09m provide door gib shoe 74i repair skylite in machine room 31q properly secure wiring on top of car
Jan 24, 2002
Resolve - Non-hazardous
08v01/ 20l11/ 20l repair 5th fl hall call car keeps going to 5th fl buttom is damaged
Jan 24, 2002
Resolve - Non-hazardous
02b,22d,37g,73o
Mar 5, 1991 · Penalty $75
Resolve
Complaints
- Paint/plaster
Wall
Sep 16, 2026 · Apt 4L
Close - Unsanitary condition
Pests
Aug 27, 2026 · Apt BASEME
Close - Door/window
Window frame
Aug 27, 2026 · Apt BASEME
Close - Plumbing
Toilet
Aug 27, 2026 · Apt BASEME
Close - Door/window
Door
Aug 27, 2026 · Apt BASEME
Close - Flooring/stairs
Floor
Aug 27, 2026 · Apt BASEME
Close - Plumbing
Toilet
Aug 21, 2026 · Apt BASEME
Close - Electric
Power outage
Jun 16, 2026 · Apt 6G
Close - Electric
Power outage
Jun 15, 2026 · Apt 6G
Close - Electric
Power outage
Jun 15, 2026 · Apt 6G
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Apr 2, 2026 · Apt 6L
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt BLDG
Close - Paint/plaster
Door/frame
Feb 2, 2026 · Apt 3D
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt 2N
Close - Paint/plaster
Wall
Apr 21, 2025 · Apt 3F
Close - Heat/hot water
Entire building
Feb 3, 2025 · Apt BLDG
Close - Plumbing
Toilet
Jan 22, 2025 · Apt 3F
Close - Water leak
Slow leak
Jan 22, 2025 · Apt 3F
Close - Paint/plaster
Ceiling
Jan 22, 2025 · Apt 3F
Close - Door/window
Door
Sep 12, 2024 · Apt 3F
Close - Plumbing
Bathtub/shower
Sep 12, 2024 · Apt 3F
Close - Electric
Lighting
Sep 12, 2024 · Apt 3F
Close - General
Cabinet
Sep 12, 2024 · Apt 3F
Close - Plumbing
Bathtub/shower
Sep 12, 2024 · Apt 3F
Close - Unsanitary condition
Mold
Jan 27, 2024 · Apt 6A
Close - Water leak
Damp spot
Jan 27, 2024 · Apt 6A
Close - Paint/plaster
Wall
Jan 27, 2024 · Apt 6A
Close - Paint/plaster
Ceiling
Jan 27, 2024 · Apt 6A
Close - Heat/hot water
Entire building
Jan 25, 2024 · Apt BLDG
Close - Paint/plaster
Ceiling
Jan 23, 2024 · Apt A
Close - Water leak
Damp spot
Jan 23, 2024 · Apt A
Close - Unsanitary condition
Mold
Jan 23, 2024 · Apt A
Close - Heat/hot water
Entire building
Jan 23, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 24, 2023 · Apt BLDG
Close - Safety
Window guard broken/missing
Nov 9, 2023 · Apt 3F
Close - Heat/hot water
Entire building
Oct 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2022 · Apt 1B
Close - Heat/hot water
Apartment only
Jan 1, 2018 · Apt 1A
Close - Heat/hot water
Apartment only
Dec 10, 2017 · Apt 6F
Close - Unsanitary condition
Mold
May 3, 2017 · Apt 3M
Close - Heat/hot water
Entire building
Mar 19, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 24, 2016 · Apt 6J
Close - Flooring/stairs
Floor
Jun 20, 2016 · Apt 3J
Close - Electric
Outlet/switch
Jun 20, 2016 · Apt 3J
Close - Flooring/stairs
Floor
Jun 20, 2016 · Apt 3J
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Sep 9, 2026 | $425,000 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
| Jan 22, 2026 | $6,639,755 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1938
- Floors
- 6
- Residential units
- 79
- Building area
- 92,688 ft²
- Lot area
- 21,276 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 35
- Block / lot
- 1249 / 7
- Assessed value
- $2,232,450
- Landmark / historic district
- Crown Heights North II Historic District
HPD registration #310232, last renewed Sep 24, 2025.
Questions about 960 Sterling Place
Who owns 960 Sterling Place?
The owner of record in NYC Department of City Planning PLUTO data is 960 Sterling Pl Owners Corp.
Does 960 Sterling Place have violations?
Yes. NYC HPD has recorded 210 housing violations at this property.
Is 960 Sterling Place rent stabilized?
NYC Department of Finance tax bills listed 19 rent-stabilized units here in 2024 (about 24% of its 79 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 960 Sterling Place built?
City records list 1938 as the year it was built.
How many apartments are in 960 Sterling Place?
It has 79 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.