1469 Bedford Avenue
Brooklyn, NY 11216BBL 3-01239-0001Map
Owner of record: 1469 Bedford LLC
1469 Bedford Avenue is an elevator apartment building built in 1920 in Brooklyn, 11216. It has 27 residential units across 5 floors. The owner of record is 1469 Bedford LLC. HPD has recorded 538 housing violations here, most recently on May 14, 2026. 2 of the 50 most recent violations are still open. City tax records listed 27 rent-stabilized apartments here in 2024.
- HPD violations
- 538
- DOB violations
- 69
- ECB violations
- 39
- HPD complaints
- 727
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 538
- BHazardous
Remove all encumbrances consisting of bicycles at public hall, 5th story
May 14, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of bicycles at public hall, 5th story
Apr 23, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at hopper door at public hall, 4th story
Apr 16, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 5d, 5th story, 1st apartment from east at south
Apr 16, 2026 · Apt 5D
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1d, 1st story, 1st apartment from east at south
Apr 10, 2026 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles west wall in the bathroom located at apt 1d, 1st story, 1st apartment from east at south
Apr 10, 2026 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1d, 1st story, 1st apartment from east at south
Apr 10, 2026 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1d, 1st story, 1st apartment from east at south
Apr 10, 2026 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2c, 2nd story, 2nd apartment from south at west
Feb 6, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2c, 2nd story, 2nd apartment from south at west
Feb 6, 2026 · Apt 2C
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Remove all encumbrances consisting of bagged trash, loose rubbish and discarded household items at public hall, 1st story
Dec 11, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of extremely hot water at all hot water fixtures exceeding maximum allowable temperature of 130 f, found to be 145 f at all fixtures in the entire apartment located at apt 1b, 1st story, 3rd apartment from east at south
Dec 11, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 4c, 4th story, 2nd apartment from east at south
Dec 5, 2025 · Apt 4C
Closed — Violation closed - BHazardous
Refit the entrance door in the bathroom located at apt 4c, 4th story, 2nd apartment from east at south
Dec 5, 2025 · Apt 4C
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 4c, 4th story, 2nd apartment from east at south
Dec 5, 2025 · Apt 4C
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet at toilet bowl in the bathroom located at apt 4c, 4th story, 2nd apartment from east at south
Dec 5, 2025 · Apt 4C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from north located at apt 4c, 4th story, 2nd apartment from east at south
Dec 5, 2025 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from north located at apt 4c, 4th story, 2nd apartment from east at south
Dec 5, 2025 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 4f, 4th story, 1st apartment from west at north
Sep 3, 2025 · Apt 4F
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4f, 4th story, 1st apartment from west at north
Sep 3, 2025 · Apt 4F
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall in the kitchen located at apt 1b, 1st story, 3rd apartment from east at south
Aug 9, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective counter top at sink in the kitchen located at apt 1b, 1st story, 3rd apartment from east at south
Aug 9, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Replace with new the missing wood door at north closet leaving exposed hinges at door frame in the 3rd room from east at south located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective locking device at, wood door , south wall in the bathroom located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at south, the bathroom , the kitchen , the foyer , the private hallway located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective sink' countertop ,at south wall in the kitchen located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective the hinges at vestibule door east wall , at public hall, 1st story
Aug 7, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective .. yard
Aug 7, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective wood door at north wall in the 2nd room from east at south located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at south located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective wood door at north closet in the 3rd room from east at north located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective buldged wood floor in the private hallway located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective wood door at north wall in the 3rd room from east at south located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective cracked ceramic floor tiles in the bathroom located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective reglaze the porcelain paint at bathtub north wall in the bathroom located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Repair the leaky and/or defective faucets at, bathtub, north wall, in the bathroom located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective wood doors at west closet in the foyer located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Replace with new the missing wood door saddle at east wall in the kitchen located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet countertop at north wall in the kitchen located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective gasket at refrigerator door in the kitchen located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation closed - ANon-hazardous
Refit wood doors at , south wall cabinet, in the kitchen located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl at west wall in the bathroom located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective regrout the joints between bathtub and ceramic tiles at north wall in the bathroom located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective cracked electrical outlet cover at south wall in the kitchen located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation closed - ANon-hazardous
Repair the leaky and/or defective faucets at, sink, south wall , in the kitchen located at apt 1b, 1st story, 3rd apartment from east at south
Aug 7, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Replace with new the missing corroded and detached iron guardrail at masonry ramp , entrance to building , at front yard
Aug 7, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4f, 4th story, 1st apartment from north at east
Jul 30, 2025 · Apt 4F
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox [ missing notice ] at public hall, 1st story
Jul 30, 2025
Closed — Violation dismissed
DOB building violations · 69
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 17, 2021
Dob violation - dismissed
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 3, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2020
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 26, 2017
Dob violation - dismissed - Immediate emergency anythingoptional
Ftm / sws
May 3, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 25, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 11, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 13, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 29, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 16, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 23, 1999
Vp*-violation unserved ecb- dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 17, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Unsafe buildings none
Ub-unsafe buildings none
Nov 26, 1996
V%*-dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 25, 1995
Vpw*-violation unserved ecb-work without permit-dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 25, 1995
Vp*-violation unserved ecb- dismissed
ECB violations · 39
- Class - 1
Unlawful acts failure to comply w/commissioners orders records indicate no app was made to correct or certify ecbs35634376k&35328705r complyw/commissioners orders
Jan 6, 2022
Resolve - Class - 2
No access to machine room , provide keys for future inspections / emergency outside comm inoperative , repair / when elevator comes to the 5th landing there is a loud grinding or rubbing noise , resolve issue /
Dec 23, 2021
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#35326395l issued on 4/13/2018 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for work without a perm
Nov 22, 2021
Resolve - Class - 1
Unlawful acts. failure to comply w/an order of the commissioner. failure to correct & certify summons#35328705r for conductors not properly terminated & installed front entrance at exit sign-open exposed wiring
Nov 20, 2021
Resolve - Class - 1
Failure to comply w/commissioner's order contained in summons/v35326395l issued4/13/18&to file c/c pursuant to28-201.1&1rcny102-01.for work w/o permit.comply w/commissioner's order &/or file c/c.
Apr 30, 2021
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in summons/violation #35326395l issued on 4/13/18 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.for work w/out a permit at (6)
Dec 16, 2020 · Penalty $2,500
Active - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
Mar 16, 2020 · Penalty $1,250
Active - Class - 1
Failure to comply with commissioners order contained in summons/violation #35326395l issued on 04-13-2018,and to file a certificate of correction pursuant to 28-201.1 and 1 rcny 102-01.work without a permit.com
Jan 30, 2020 · Penalty $12,500
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35326395l issued on 04/13/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit in boiler room in cellar for 2 hot water heat
Oct 16, 2019 · Penalty $6,250
Active - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35326395l issued on 04/13/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o permit & failure to file cert of correction.
Aug 20, 2019 · Penalty $6,250
Active
Show 29 more ↓
- Class - 1
Failure to comply with the commissioners order contained in summons/ violation#35326395l issued on 04/13/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit
Jul 5, 2019 · Penalty $2,500
Active - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35326395l issued on 04/13/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit at the cellar level. remedy: comply w/comm's
May 2, 2019 · Penalty $2,500
Active - Class - 1
Failure to comply with the commissioner's order contained in summons/ violation 35393946z issued on 01/09/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. work w/o a permit.rmdy
Mar 6, 2019
Resolve - Class - 1
Failure to comply w/commissioner's order contained in summons/violation #35326395l issued on 04/13/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for work w/o a permit; at cel
Jan 9, 2019
Resolve - Class - 1
Failure to comply with the commissioner's order containted in summons/violation# 35326395l issued on 04/13/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. at cellar level work
Nov 23, 2018
Resolve - Class - 1
Unlawful act,failure to comply with an order of the commissioner.records indicate no application filed to correct,certify and remove violations contained in summons#35343199z and #35328705r.rem:comply with comm
Oct 18, 2018
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35326395l issued on 04/13/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit. noted: at cellar level,2 hot water heaters
Oct 15, 2018 · Penalty $6,250
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35326395l issued on 04/13/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit at cellar. remedy: comply w/comm's order &/or
Sep 4, 2018
Resolve - Class - 1
Unlawful act,failure to comply with an order of the commissioner.records indicate no application filed to correct,certify,and remove violations contained in summons #35328705rrem:comply with commissioners orde
Aug 29, 2018 · Penalty $12,500
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violations#35326395l issued on 4/13/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.note:no document file fo
Jul 23, 2018
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35328705r issued on 04/13/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. summons 35328705r cities conductors not properly terminated in
Jul 3, 2018 · Penalty $6,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons violation #35326397p issued on 04/13/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for no ventilation
Jun 8, 2018 · Penalty $1,250
Resolve - Class - 1
Work without a permit. observed in cellar in boiler room two hot water heaters installed with gas, water and flue piping that were manufactured on 9/27/13 and 11/07/17. dob records covering the period 9/27/13 t
Apr 13, 2018 · Penalty $1,600
Active - Class - 1
Ec110.14/conductor not properly installed or terminated.osreved in front entrance above entrance door an exit sign with the wiring compartment open and exposed energized wires accessible to improper contact,thi
Apr 13, 2018 · Penalty $800
Resolve - Class - 2
68b7,68m7,48b1,81y11,32h11. 68b7-maintenance log has no entries for 2018. provide. 68m7-no mcp provide; 48b1-pump const tank, relief pressure set too high according to tag, adjust; 81y11-device re() on top fl
Apr 13, 2018
Resolve - Class - 1
Fgc411.1/miscellaneous violations.residential gas flex used on commercial equipment.observed in laundry room in cellar residential gas flexhoses use to supply gas to the commercial clothes dryers.rem:comply wit
Apr 13, 2018 · Penalty $2,500
Active - Class - 1
Failure to have new or altered plumbing system tested.observed in boiler room in cellar two hot water heaters installed without permits withgas flue and water piping for which dob records do not show and record
Apr 13, 2018 · Penalty $2,500
Active - Class - 1
Failure to maintain building in code compliant manner.observed in gas meter room in cellar no ventilation in gas meter room.rem:repair and or replace.photo taken.
Apr 13, 2018 · Penalty $1,250
Active - Class - 2
Unapproved,unsafe,unsuitable electrical equipment,apparatus,materials,devices,appliances or wiring in use.observed on roof top 6 defective exhaust fans,these units were not active at the time of inspection,also
Apr 13, 2018 · Penalty $800
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. illumination for exits,exit discharges & public-corridors per bc 1006.1;27-381. noted: observed throughout bldg at various floors & locations,existing emergenc
Apr 13, 2018 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. no fire stopping per bc 712.3;27-345. noted: observed throughout cellar at electrical room,boiler room,holes/openings in ceiling,pipe penetrations w/no fire
Apr 13, 2018 · Penalty $1,250
Active - Class - 2
Failure to comply w/the comm's order contained in summons/vio #35245121j issued on 5/2/17 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01.for failure to maintain etc.rem:comply w/comm's order
Jul 6, 2017 · Penalty $800
Resolve - Class - 1
Failure to maintain exterior bldg walls &/or appurtenances. noted: at the time of inspection,observed exterior bldg wall in disrepair w/section of masonry approx 8foot wide & 2foot in length that has fallen to
May 2, 2017 · Penalty $5,000
Active - Class - 2
05b07,07b01,17b07,35q06,42r11,98u05. 05b07-provide a door zone restrictor device; 07b01-door opening is delayed; 17b07-fire gibs are too short (18"); 35q06-electrical boxes are opening; 42r11-oversized fuse on
Apr 25, 2016 · Penalty $2,500
Active - Class - 2
304.7 97r07-elevator must be service by a license elevator maint.co.
Apr 25, 2016 · Penalty $4,000
Active - Class - 2
07b10,48b10,99b05. 07b- repair electric eye on safety edge. 48b- re-route electrical wire from oil in tank.
Jan 8, 2013 · Penalty $500
Active - Hazardous
Failure to maintain exterior building walls defects one exterior window frames and paints are rotted broken and capable of failing into the street including grass window panes cements tiles are also broken in
Jan 20, 1998 · Penalty $2,500
Resolve - Hazardous
Failure to maintain (hazardous) exterior window frame and parts thereof including glass panes are rotted, broken and have fallen/in danger of falling/to street. part of cement arch at 4th fl. n/w corner unsecur
Jan 29, 1991
Resolve - Hazardous
Failure to maintain. (hazardous). exterior window frames and parts there of rotted, broken & falling to street, including glass window panes cement tile located at 4th story at north east corner is broken
Jul 6, 1990 · Penalty $1,000
Resolve
Complaints
- Paint/plaster
Wall
Sep 14, 2026 · Apt 4F
Close - Plumbing
Radiator
Sep 14, 2026 · Apt 4F
Close - Unsanitary condition
Pests
Sep 14, 2026 · Apt 4F
Close - Plumbing
Bathtub/shower
Jul 6, 2026 · Apt 2C
Close - Plumbing
Basin/sink
Jul 6, 2026 · Apt 2C
Close - Door/window
Window frame
Jul 6, 2026 · Apt 2C
Close - Electric
Power outage
Jul 6, 2026 · Apt 2C
Close - Electric
Outlet/switch
Jul 6, 2026 · Apt 2C
Close - Heat/hot water
Entire building
May 12, 2026 · Apt BLDG
Close - Paint/plaster
Door/frame
Apr 10, 2026 · Apt BLDG
Close
Show 40 more ↓
- General
Ventilation system
Apr 10, 2026 · Apt 1D
Close - Unsanitary condition
Pests
Apr 10, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Apr 10, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Apr 10, 2026 · Apt 5B
Close - Door/window
Door
Apr 10, 2026 · Apt 5B
Close - Door/window
Door
Apr 10, 2026 · Apt 5B
Close - Safety
Smoke detector
Apr 10, 2026 · Apt 5B
Close - Paint/plaster
Wall
Apr 10, 2026 · Apt 5B
Close - Paint/plaster
Ceiling
Apr 10, 2026 · Apt 5B
Close - Water leak
Damp spot
Apr 10, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Apr 10, 2026 · Apt 1D
Close - Paint/plaster
Ceiling
Apr 10, 2026 · Apt 1D
Close - General
Cabinet
Apr 10, 2026 · Apt 1D
Close - General
Ventilation system
Apr 10, 2026 · Apt 1D
Close - Paint/plaster
Wall
Apr 10, 2026 · Apt 1D
Close - General
Cabinet
Apr 10, 2026 · Apt 1D
Close - Safety
Carbon monoxide detector
Apr 10, 2026 · Apt 5B
Close - Safety
Smoke detector
Apr 10, 2026 · Apt 1D
Close - Water leak
Damp spot
Apr 10, 2026 · Apt 1D
Close - Paint/plaster
Ceiling
Apr 10, 2026 · Apt 1D
Close - Paint/plaster
Wall
Apr 10, 2026 · Apt 1D
Close - Paint/plaster
Wall
Apr 10, 2026 · Apt 1D
Close - Paint/plaster
Ceiling
Apr 10, 2026 · Apt 1D
Close - Door/window
Door
Apr 10, 2026 · Apt 1D
Close - Flooring/stairs
Floor
Apr 10, 2026 · Apt 1D
Close - Door/window
Window frame
Apr 10, 2026 · Apt 1D
Close - Door/window
Window frame
Apr 10, 2026 · Apt 1D
Close - Door/window
Door
Apr 10, 2026 · Apt 1D
Close - Safety
Carbon monoxide detector
Apr 10, 2026 · Apt 1D
Close - Plumbing
Water supply
Apr 10, 2026 · Apt 1D
Close - Unsanitary condition
Pests
Apr 10, 2026 · Apt 1D
Close - Unsanitary condition
Pests
Apr 10, 2026 · Apt 1D
Close - Electric
Lighting
Apr 10, 2026 · Apt 1D
Close - General
Bell/buzzer/intercom
Apr 10, 2026 · Apt 1D
Close - Safety
Fire escape
Apr 10, 2026 · Apt 1D
Close - General
Bell/buzzer/intercom
Apr 10, 2026 · Apt 5B
Close - Paint/plaster
Door/frame
Apr 10, 2026 · Apt BLDG
Close - Electric
Lighting
Apr 10, 2026 · Apt BLDG
Close - Safety
Outlet cover
Apr 10, 2026 · Apt BLDG
Close - Water leak
Damp spot
Apr 10, 2026 · Apt BLDG
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Dec 5, 2025 | $2,850,000 | Rentals - elevator apartments | 28 |
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1920
- Floors
- 5
- Residential units
- 27
- Building area
- 29,171 ft²
- Lot area
- 6,644 ft²
- Zoning
- R6A
- Community board
- 308
- Council district
- 36
- Block / lot
- 1239 / 1
- Assessed value
- $577,800
- Landmark / historic district
- INDIVIDUAL LANDMARK
HPD registration #377665, last renewed Jan 9, 2026.
Questions about 1469 Bedford Avenue
Who owns 1469 Bedford Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1469 Bedford LLC.
Does 1469 Bedford Avenue have violations?
Yes. NYC HPD has recorded 538 housing violations at this property.
Is 1469 Bedford Avenue rent stabilized?
NYC Department of Finance tax bills listed 27 rent-stabilized units here in 2024 (about 100% of its 27 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1469 Bedford Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 1469 Bedford Avenue?
It has 27 residential units and 28 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.