1 Sullivan Place
Brooklyn, NY 11225BBL 3-01192-0095Map
Owner of record: 1 Sullivan Residences LLC
1 Sullivan Place is an elevator apartment building built in 2022 in Brooklyn, 11225. It has 52 residential units across 12 floors. The owner of record is 1 Sullivan Residences LLC. HPD has recorded 14 housing violations here, most recently on January 31, 2026. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 14
- DOB violations
- 7
- ECB violations
- 26
- HPD complaints
- 11
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- CImmediately hazardous
Properly repair or replace the broken or defective individual heat unit at north wall in the 1st room from east located at apt 11c, 11th story, 2nd apartment from east at south
Jan 31, 2026 · Apt 11C
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective individual heat unit at north wall in the 2nd room from east located at apt 11c, 11th story, 2nd apartment from east at south
Jan 31, 2026 · Apt 11C
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2e, 2nd story, 1st apartment from south at west
Dec 12, 2025 · Apt 2E
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door lock at cellar at boiler room
Dec 12, 2025
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing sign at door leading to the boiler room at boiler room
Dec 12, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at public hall, 2nd story
Dec 12, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2e, 2nd story, 1st apartment from south at west
Dec 12, 2025 · Apt 2E
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at hopper door at public hall, 9th story
Nov 26, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at compactor closet at public hall, 10th story
Nov 26, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Oct 3, 2025 · Apt 3B
Closed — Violation dismissed
Show 4 more ↓
- CImmediately hazardous
Properly repair or replace the broken or defective mortise lock in the entrance located at apt 3b, 3rd story, 1st apartment from east at south , section ''east''
Sep 25, 2025 · Apt 3B
Closed — Violation closed - BHazardous
Replace with new the missing sprinkler cap at ceiling in the 1st room from north located at apt 1a, 1st story, 1st apartment from west at north
Jul 1, 2025 · Apt 1A
Closed — Violation closed - BHazardous
Replace with new the missing sprinkler cap at ceiling in the 1st room from east at north located at apt 1a, 1st story, 1st apartment from west at north , section at east
Jun 2, 2025 · Apt 1A
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed
DOB building violations · 7
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 2, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 2, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 2, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 18, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 18, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 18, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 3, 2021
Dob violation - dismissed
ECB violations · 26
- Class - 2
Failure to notify change of ssc (more than two weeks) on pw2 at the time of inspection on a active job site currently at roof level and enclosed with windows, i observed that alternate ssc sanjeev kumar was on
Dec 22, 2022
Resolve - Class - 2
At the time of inspection on an active job site , i observed sidewalk shed at exposure 1 &2 consisting with excessive storage of scaffold parts ,wood ,netting and other construction material sidewalk plan that
Sep 22, 2022 · Penalty $625
Resolve - Class - 2
Bc3314.4 supported pipe scf not installed,maintained as per code.atoi of 12stynb active jobsite,observed supported scf installed@exp1,2&3 not as per code.observed scf has loose planks,missing pins,missing guard
Mar 24, 2022
Resolve - Class - 1
Failure to institute,maintain safety equipment measures on temp const.atoi of 12stynb active jobsite,observed@exp1 supported pipe scf installed on top of sws.also observed worker on scf climbing scf frames b/w
Mar 24, 2022 · Penalty $2,500
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments. at time of inspection of 12 sty nb active jobsite observedsupported pipe scaffold installed at exp#1&2 not as per approved suppo
Mar 24, 2022 · Penalty $625
Resolve - Class - 1
Bc 3308.5 vertical safety netting shall be installed and maintained tocover all unendosed perimeters stop all work on 3rd level to 12th level provided and maintain safety netting as per code stay back 10 feet f
Feb 9, 2022 · Penalty $2,500
Resolve - Class - 1
Bc 3314.1 scaffolding utilized in conjunction with the construction ofa building shall be erected and maintained so that the safety of public and property will not be endangered by falling material or equipment
Feb 9, 2022 · Penalty $2,500
Resolve - Class - 1
Bc 3307.4.7 where work or storage related to the construction of a building adjacent to a sidewalk shed to protect pedestrians.stop all work and storage at storage zone at exposure#2-only allowed to fix violat
Feb 9, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to institute and maintain safety equipment measure.note at thetime of my inspection responding to a complaint where a worker got hitwith a crane cable.inspection reveals thay worker was hit with cable w
Nov 29, 2021
Resolve - Class - 1
Crane user agra industries usa corp while using mobile crane #4145 to hoist a bundle of steel i-beams to the 8th fl with 2-1/2'' 5.1t wire rope slings in a basket hitch(load 1100 lbs),a scaffoling worker ,who w
Nov 29, 2021
Resolve
Show 16 more ↓
- Class - 1
Crane user agra industries usa failed to name the proper party lift director,while hoisting and trying to land a bundle of i-beams the sling broke in half and injured a worker not involved with the rigging crew
Nov 29, 2021
Resolve - Class - 1
Ld did not have the proper safegaurds in place when a worker who was not on his rigging crew pulled the sling while landing the load which caused the wire rope 1/2'' 5.1t ,to break in half,and hurt himself, saf
Nov 29, 2021
Resolve - Class - 1
Failure to institute and maintain safety equipment measures.note at the time of my inspection responding to complaint where a worker got hitwith a crane cable on right hand.inspection reveals worker was assisti
Nov 29, 2021 · Penalty $5,000
Resolve - Class - 2
The lift director did not perform his duties ,when the 1/2'' wire rope sling broke in half, when it was pulled by a worker not on his rigging crew as they were landing the load,he should have used a larger slin
Nov 29, 2021
Resolve - Class - 1
Work does not conform to approved construction documents &/or approvedamendments. note: at the time of my inspection of proposed 12 sty new bldg,active jobsite w/underpining operations at exp#3,upon reviewing
May 18, 2021 · Penalty $2,500
Resolve - Class - 1
Sec. 3301.6 temporary construction-no design drawing. note: at the time of my inspection proposed 12 sty new bldg,active jobsite w/underpinning operations at exp#3,i observed that there is a chainlink fence on
May 18, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard all person & property affected by construction operation. note: at the time of my inspection of proposed 12 sty new bldg at the excavation phase,work is going on for the underpinning operat
May 18, 2021 · Penalty $10,000
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations.at time of inspection in response to an incident i observedthere was dump truc backing up which hit a light pole on a one way st
Nov 10, 2020
Resolve - Class - 1
Failure to comply with manufacturer's specifications-inadequate pedestrian protection.at time of inspection of a 12 story building jobsite no work in progress.i observed that the vodocks pedestrian protection w
Nov 7, 2020 · Penalty $2,500
Resolve - Class - 2
Jobsite fence not maintained repsuant to subsection-unpainted,missing viewing panel.at time of inspection of a 12 story building jobsite i observed that jobsite fence was not to code specifications-12 panels of
Nov 7, 2020
Resolve - Class - 2
Bc 3307.2.1 failure to comply with dot regulation as per 39 rcny 2-05 an admin code provisions 19-107 19-108 or 19-121.at time of inspectioni observed that the walkway provided for non working hours must be 5-0
Nov 7, 2020
Resolve - Class - 1
Work does not conform to approved construction document(ssp)note: at time of my inspection of a proposed 12 sty's new bldg under construction at pile(driving)stage,i observed existing site condition does not co
Oct 21, 2020 · Penalty $625
Resolve - Class - 2
Temporary construction equipment on site expired permit. noted:1-permit #320980621-eq-fn expired 11/26/16. observed: a 8'high wood construc tion fence is enclosing the site. rmdy: renew permit.
Aug 16, 2017 · Penalty $2,000
Resolve - Class - 2
Temporary construction equipment on site-expired permit:note: permit #302177463-01eqfn issued on 9/14/09 for construction equipment fence in conjunction with nb#302177463-01nb has expired on 8/28/10. at time
Oct 10, 2014 · Penalty $800
Resolve - Class - 2
Expired permit. noted: construction fence in place at above location. fn permit #302177463 expired on 8.28.10. remedy: renew permit.
Jul 17, 2013 · Penalty $4,000
Resolve - Class - 2
Permit not posted. noted: construction fence in place at above location. no fn posted. remedy: post permit.
Jul 17, 2013 · Penalty $4,000
Resolve
Complaints
- Electric
Lighting
May 24, 2026 · Apt 3B
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 11C
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 2E
Close - Heat/hot water
Apartment only
Nov 30, 2025 · Apt 6D
Close - Heat/hot water
Entire building
Nov 25, 2025 · Apt 9D
Close - Heat/hot water
Entire building
Nov 25, 2025 · Apt 4D
Close - Door/window
Door
Sep 30, 2025 · Apt 3B
Close - Door/window
Door
Sep 30, 2025 · Apt 3B
Close - Door/window
Door
Sep 24, 2025 · Apt 3B
Close - Safety
Smoke detector
May 29, 2025 · Apt 1A
Close
Show 1 more ↓
- General
Ventilation system
May 29, 2025 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2022
- Floors
- 12
- Residential units
- 52
- Building area
- 52,670 ft²
- Lot area
- 4,212 ft²
- Zoning
- R8A
- Community board
- 309
- Council district
- 35
- Block / lot
- 1192 / 95
- Assessed value
- $5,728,500
- Landmark / historic district
- No
HPD registration #390581, last renewed Aug 4, 2025.
Questions about 1 Sullivan Place
Who owns 1 Sullivan Place?
The owner of record in NYC Department of City Planning PLUTO data is 1 Sullivan Residences LLC.
Does 1 Sullivan Place have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 1 Sullivan Place rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 31% of its 52 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1 Sullivan Place built?
City records list 2022 as the year it was built.
How many apartments are in 1 Sullivan Place?
It has 52 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.