320 Lincoln Place
Brooklyn, NY 11238BBL 3-01179-0019Map
Owner of record: 320 Lincoln Ltd Liability Co
320 Lincoln Place is a walk-up apartment building built in 1922 in Brooklyn, 11238. It has 24 residential units across 4 floors. The owner of record is 320 Lincoln Ltd Liability Co. HPD has recorded 185 housing violations here, most recently on June 10, 2024. 5 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 185
- DOB violations
- 1
- ECB violations
- 2
- HPD complaints
- 336
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 185
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner unit protruding beyond 4 inches at 3rd story balcony west . at fire escape at north
Jun 10, 2024
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner unit protruding beyond 4 inches at 4th story at west at fire escape at north
Jun 10, 2024
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling north wall in the bathroom located at apt 3d, 4th story, 2nd apartment from west at north
Jun 10, 2024 · Apt 3D
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the bathroom located at apt 3d, 4th story, 2nd apartment from west at north
Jun 10, 2024 · Apt 3D
Closed — Violation closed - BHazardous
Repair or replace the smoke detector deffective in the entire apartment located at apt 3d, 4th story, 2nd apartment from west at north
Jun 10, 2024 · Apt 3D
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). deffective in the entire apartment located at apt 3d, 4th story, 2nd apartment from west at north
Jun 10, 2024 · Apt 3D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3d, 4th story, 2nd apartment from west at north
Jun 10, 2024 · Apt 3D
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 4th story, 2nd apartment from south at west
May 13, 2024 · Apt 3B
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycles and children scooters at public hall, 1st story
May 13, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 4th story, 2nd apartment from south at west
May 13, 2024 · Apt 3B
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at bulkhead roof at public hall, 4th story
Apr 26, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 2e, 3rd story, 1st apartment from north at east
Apr 26, 2024 · Apt 2E
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2e, 3rd story, 1st apartment from north at east
Apr 26, 2024 · Apt 2E
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 2e, 3rd story, 1st apartment from north at east
Apr 26, 2024 · Apt 2E
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material ceiling at bulkhead roof at public hall, 4th story
Apr 26, 2024
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 2nd stack from east at north exterior wall at fire escape, 2nd story
Aug 23, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor at public hall, 1st story
Aug 4, 2023
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner bracket protruding beyond window sill at west stack at fire escape, 4th story
Aug 4, 2023
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at building front west
Aug 4, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at bulkhead roof at public hall, 4th story
Aug 4, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at cieling at bulkhead roof at public hall, 4th story
Aug 4, 2023
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 2 sq ft at ceiling at bulkhead roof at public hall, 4th story
Aug 4, 2023
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner protruding beyond window sill at 3rd story at fire escape, section at west
Aug 4, 2023
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 2 sq ft at ceiling at bulkhead roof at public hall, 4th story original violation 16152493 issued 04-aug-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 4, 2023
Open — Defect letter issued - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire door to south yard at public hall, 1st story
Jul 28, 2023
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt e, 2nd story
Jul 28, 2023 · Apt E
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 31, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cauking at splash board at south wall around washbasin surface in the bathroom located at apt 3d, 4th story, 2nd apartment from west at north
May 31, 2023 · Apt 3D
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 7 square feet at ceiling and north wall in the bathroom located at apt 3d, 4th story, 2nd apartment from west at north
May 31, 2023 · Apt 3D
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3d, 4th story, 2nd apartment from west at north
May 31, 2023 · Apt 3D
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of double side key operated mortise lock installed on entrance door at room in the 1st room from east at north located at apt 3d, 4th story, 2nd apartment from west at north
May 31, 2023 · Apt 3D
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 4 square feet at the ceiling and north wall in the kitchen located at apt 3d, 4th story, 2nd apartment from west at north
May 31, 2023 · Apt 3D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glazing at the bathtub surface in the bathroom located at apt 3d, 4th story, 2nd apartment from west at north
May 31, 2023 · Apt 3D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling ,north ,west and east walls in the kitchen located at apt 3d, 4th story, 2nd apartment from west at north
May 31, 2023 · Apt 3D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from east at north located at apt 3d, 4th story, 2nd apartment from west at north
May 31, 2023 · Apt 3D
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at the ceiling in the bathroom located at apt 3d, 4th story, 2nd apartment from west at north
May 31, 2023 · Apt 3D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3d, 4th story, 2nd apartment from west at north
May 31, 2023 · Apt 3D
Open — False certification - BHazardous
Properly repair with similar material the broken or defective wood header frame at 1st window form west at north in the 3rd room from east at north located at apt 3d, 4th story, 2nd apartment from west at north
May 31, 2023 · Apt 3D
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation heat riser at west wall in the kitchen located at apt 3d, 4th story, 2nd apartment from west at north
May 31, 2023 · Apt 3D
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at the ceiling and north wall in the kitchen located at apt 3d, 4th story, 2nd apartment from west at north
May 31, 2023 · Apt 3D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the bathroom located at apt 3d, 4th story, 2nd apartment from west at north
May 31, 2023 · Apt 3D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 3d, 4th story, 2nd apartment from west at north
May 31, 2023 · Apt 3D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood baseboard molding at west wall in the 3rd room from east at north located at apt 3d, 4th story, 2nd apartment from west at north
May 31, 2023 · Apt 3D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3d, 4th story, 2nd apartment from west at north
Jul 29, 2022 · Apt 3D
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the kitchen located at apt 3d, 4th story, 2nd apartment from west at north
Jul 29, 2022 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel glazed surface at bathtub in the bathroom located at apt 3d, 4th story, 2nd apartment from west at north
Jul 29, 2022 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 3d, 4th story, 2nd apartment from west at north
Jul 29, 2022 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective caulking around wash basin in the bathroom located at apt 3d, 4th story, 2nd apartment from west at north
Jul 29, 2022 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Refit the entrance door in the 1st room from east located at apt 3d, 4th story, 2nd apartment from west at north
Jul 29, 2022 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 4th story, 2nd apartment from west at north
Jul 29, 2022 · Apt 3D
Open — Not complied with
DOB building violations · 1
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 2
- Class - 1
Failure to maintain building in code complaint manner. observed in cellar , unsafely storaged excessive combustible materials , debris, and fire stopper been removed in many location., electric wires out of wa
Oct 16, 2019
Resolve - Non-hazardous
Boilers
Apr 13, 1996
Resolve
Complaints
- Unsanitary condition
Pests
Sep 30, 2024 · Apt 3C
Close - Unsanitary condition
Pests
Jun 5, 2024 · Apt 3D
Close - Unsanitary condition
Pests
May 12, 2024 · Apt 2C
Close - Unsanitary condition
Pests
Apr 21, 2024 · Apt 3B
Close - Unsanitary condition
Pests
Apr 18, 2024 · Apt 2E
Close - Unsanitary condition
Pests
Apr 18, 2024 · Apt 3B
Close - Unsanitary condition
Pests
Apr 18, 2024 · Apt 3B
Close - Unsanitary condition
Pests
Apr 18, 2024 · Apt 3D
Close - Unsanitary condition
Pests
Apr 10, 2024 · Apt 3B
Close - Unsanitary condition
Pests
Apr 10, 2024 · Apt 3B
Close
Show 40 more ↓
- Unsanitary condition
Pests
Apr 5, 2024 · Apt E3
Close - Unsanitary condition
Pests
Mar 22, 2024 · Apt 2A
Close - Heat/hot water
Apartment only
Mar 22, 2024 · Apt 2A
Close - Water leak
Heavy flow
Sep 29, 2023 · Apt 3D
Close - Water leak
Damp spot
Sep 8, 2023 · Apt APTA
Close - Unsanitary condition
Pests
Sep 8, 2023 · Apt APTA
Close - Plumbing
Bathtub/shower
Sep 8, 2023 · Apt APTA
Close - Plumbing
Bathtub/shower
May 3, 2023 · Apt 3D
Close - Flooring/stairs
Floor
May 3, 2023 · Apt 3D
Close - Water leak
Slow leak
May 3, 2023 · Apt 3D
Close - Paint/plaster
Ceiling
May 3, 2023 · Apt 3D
Close - Water leak
Heavy flow
May 3, 2023 · Apt 3D
Close - Flooring/stairs
Floor
May 3, 2023 · Apt 3D
Close - Water leak
Damp spot
May 3, 2023 · Apt 3D
Close - Paint/plaster
Wall
Mar 24, 2023 · Apt 3D
Close - Plumbing
Bathtub/shower
Mar 24, 2023 · Apt 3D
Close - Flooring/stairs
Floor
Mar 24, 2023 · Apt 3D
Close - Paint/plaster
Wall
Mar 24, 2023 · Apt 3D
Close - Water leak
Slow leak
Mar 24, 2023 · Apt 3D
Close - Plumbing
Bathtub/shower
Feb 13, 2023 · Apt 3D
Close - Water leak
Damp spot
Feb 13, 2023 · Apt 3D
Close - Flooring/stairs
Floor
Feb 13, 2023 · Apt 3D
Close - Door/window
Door
Feb 13, 2023 · Apt 3D
Close - Flooring/stairs
Floor
Jan 18, 2023 · Apt 3D
Close - Outside building
Roofing
Jan 18, 2023 · Apt 3D
Close - Water leak
Heavy flow
Jan 18, 2023 · Apt 3D
Close - Plumbing
Bathtub/shower
Jan 18, 2023 · Apt 3D
Close - Unsanitary condition
Mold
Jan 18, 2023 · Apt 3D
Close - Plumbing
Basin/sink
Jan 18, 2023 · Apt 3D
Close - Paint/plaster
Ceiling
Aug 29, 2022 · Apt 3D
Close - Door/window
Window frame
Aug 29, 2022 · Apt 3D
Close - Plumbing
Bathtub/shower
Aug 29, 2022 · Apt 3D
Close - Flooring/stairs
Floor
Aug 29, 2022 · Apt 3D
Close - Plumbing
Basin/sink
Aug 29, 2022 · Apt 3D
Close - Door/window
Door frame
Aug 29, 2022 · Apt 3D
Close - Door/window
Door
Jul 8, 2022 · Apt 3D
Close - Water leak
Damp spot
Jul 8, 2022 · Apt 3D
Close - Plumbing
Basin/sink
Jul 8, 2022 · Apt 3D
Close - Paint/plaster
Ceiling
Jul 8, 2022 · Apt 3D
Close - Plumbing
Bathtub/shower
Jul 8, 2022 · Apt 3D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1922
- Floors
- 4
- Residential units
- 24
- Building area
- 17,808 ft²
- Lot area
- 6,750 ft²
- Zoning
- R7A
- Community board
- 308
- Council district
- 35
- Block / lot
- 1179 / 19
- Assessed value
- $1,617,300
- Landmark / historic district
- No
HPD registration #355800, last renewed Sep 24, 2025.
Questions about 320 Lincoln Place
Who owns 320 Lincoln Place?
The owner of record in NYC Department of City Planning PLUTO data is 320 Lincoln Ltd Liability Co.
Does 320 Lincoln Place have violations?
Yes. NYC HPD has recorded 185 housing violations at this property.
Is 320 Lincoln Place rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 67% of its 24 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 320 Lincoln Place built?
City records list 1922 as the year it was built.
How many apartments are in 320 Lincoln Place?
It has 24 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.