roofy

615 Sterling Place

Brooklyn, NY 11238BBL 3-01168-0082Map

Owner of record: Sterling Washington, LLC

615 Sterling Place is a walk-up apartment building built in 1905 in Brooklyn, 11238. It has 6 residential units across 3 floors. The owner of record is Sterling Washington, LLC. HPD has recorded 29 housing violations here, most recently on April 20, 2026. City tax records listed 6 rent-stabilized apartments here in 2024.

HPD violations
29
DOB violations
5
ECB violations
3
HPD complaints
85

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Apr 20, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
6
About 100% of the building's 6 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 29

  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing as required by inspire nfpa standart 72 in the 2nd room from east located at apt 1b, 1st story, 1st apartment from west at north

    Apr 20, 2026 · Apt 1B

    Closed — Violation dismissed
  • A

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2a, 2nd story, 1st apartment from east at south

    Mar 12, 2026 · Apt 2A

    Closed — Violation closed
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at . in the entrance located at apt 2a, 2nd story, 1st apartment from east at south

    Mar 12, 2026 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective spring balance lower sash at the 3rd window from east at south in the 3rd room from north at west located at apt 2a, 2nd story, 1st apartment from east at south

    Mar 12, 2026 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective bell buzzer intercom sysytem from building entrance door to wall panel at east in the private hallway located at apt 2b, 2nd story, 1st apartment from west at north

    Nov 21, 2025 · Apt 2B

    Closed — Violation dismissed
  • A

    Properly repair or replace the broken or defective lock and assembly in the 3rd room from north located at apt 2b, 2nd story, 1st apartment from west at north

    Nov 21, 2025 · Apt 2B

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective diverter at bath tub in the bathroom located at apt 2b, 2nd story, 1st apartment from west at north

    Nov 21, 2025 · Apt 2B

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective mechanical stopper at wash basin in the bathroom located at apt 2b, 2nd story, 1st apartment from west at north

    Nov 21, 2025 · Apt 2B

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east

    Jan 13, 2025 · Apt 1A

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east

    Jan 13, 2025 · Apt 1A

    Closed — Violation dismissed
Show 19 more ↓
  • C

    Provide ready access to buildings heating system door locked at 1st story public hall to basement at boiler room

    Jan 13, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building front entrance door , 1st story

    Jan 13, 2025

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch at building front entrance door , 1st story

    Jan 13, 2025

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Dec 20, 2022

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south

    Jul 11, 2022 · Apt 2A

    Closed — Violation closed
  • B

    Abate the infestation consisting of vermin ants in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south

    Jul 11, 2022 · Apt 2A

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south

    Jul 11, 2022 · Apt 2A

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from east at south

    Jul 11, 2022 · Apt 2A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2a, 2nd story, 1st apartment from east at south

    Jul 11, 2022 · Apt 2A

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective ceiling light fixture in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Nov 21, 2006 · Apt 2L

    Closed — Violation closed
  • B

    Replace with new the missing door knobs in the 3rd room from north located at apt 2l, 2nd story, 1st apartment from west at north

    Nov 21, 2006 · Apt 2L

    Closed — Violation closed
  • A

    Refit lower and upper window sash in the 1st room from east at south located at apt 2l, 2nd story, 1st apartment from west at north

    Apr 27, 2006 · Apt 2L

    Closed — Violation closed
  • B

    Properly repair the broken or defective and make operable lower window sash east window in the 7th room from north located at apt 2l, 2nd story, apartment at west

    Mar 23, 2006 · Apt 2L

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of evidence of concealed water leak at ceiling in the bathroom located at apt 2l, 2nd story, apartment at west

    Dec 14, 2005 · Apt 2L

    Closed — Violation closed
  • C

    Remove or cover in a manner approved by the department the peeling lead paint ceiling 2 sty apt 2l center room robles 789 1774 er1 0361123. , section '' ''

    Feb 5, 1991 · Apt 2L

    Closed — Violation closed
  • B

    Replace with new the missing bottom rail of lower sash 2nd room from kitchen 3 sty west apt 3l. , section '' ''

    Dec 12, 1990 · Apt 3L

    Closed — Violation closed
  • C

    Remove or cover in a manner approved by the department the peeling lead paint ceiling private hall & 2nd room from kitchen 2 sty west apt 2l robles 789 1774 er1. located at apt 2l

    Dec 6, 1990 · Apt 2L

    Closed — Violation closed
  • C

    Remove or cover in a manner approved by the department the peeling lead paint ceiling 2nd from front room 2 sty west apt 2l robles 789 1774 er1. located at apt 2l

    Dec 6, 1990 · Apt 2L

    Closed — Violation closed
  • C

    Remove or cover in a manner approved by the department the peeling lead paint east & west walls south room 2 sty east apt 2l robles 789 1774 er1. located at apt 2l

    Dec 6, 1990 · Apt 2L

    Closed — Violation closed

DOB building violations · 5

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Construction other optional

    Th borough commissioner has issued a 15 day letter of intent to revoke appl#310092181 on 05-04-12, work is 100% complete remedy; stop all work make site safe contact dob

    May 8, 2012

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed

ECB violations · 3

  • Class - 3

    Failure to provide access to boiler for inspection hmc 27-2033;non working # displayed on the heating system/boiler room access information sign;correct violation and submit the certificate of correction; 27-mi

    Dec 22, 2023 · Penalty $500

    Active
  • Hazardous

    B4b/50/27-793/50a/50b/50c/bq9/36/16/50d/50e/50f/50g. #b4b-hazardous, #50-boiler flue spill safety switch jumped out (inoperative) bq9-new gas heating boiler installed/replaced w/o any permits/ara's etc...

    May 5, 2006 · Penalty $7,500

    Resolve
  • Hazardous

    4b-36-51-10b-50. 4b/10b-hazardous bq9-burnham steam boiler 50-feedwater pressure line is not introduced into the condensate return-chimny pipe removed-boiler jacket is removed. gas sparle box melted. must repai

    Nov 19, 2005 · Penalty $5,000

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Aug 22, 2026 · Apt BLDG

    Close
  • Plumbing

    Toilet

    Jul 21, 2026 · Apt 3B

    Open
  • Plumbing

    Toilet

    Jul 21, 2026 · Apt 3B

    Open
  • Electric

    Lighting

    Apr 6, 2026 · Apt 1B

    Close
  • Electric

    No lighting

    Apr 1, 2026 · Apt 1B

    Close
  • Flooring/stairs

    Floor

    Mar 4, 2026 · Apt 2A

    Close
  • Plumbing

    Bathtub/shower

    Mar 4, 2026 · Apt 2A

    Close
  • Door/window

    Door

    Mar 4, 2026 · Apt 2A

    Close
  • Appliance

    Refrigerator

    Mar 4, 2026 · Apt 2A

    Close
  • Door/window

    Window frame

    Mar 4, 2026 · Apt 2A

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Mar 4, 2026 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Nov 24, 2025 · Apt 2B

    Close
  • General

    Bell/buzzer/intercom

    Nov 24, 2025 · Apt 2B

    Close
  • Door/window

    Door

    Nov 24, 2025 · Apt 2B

    Close
  • Plumbing

    Bathtub/shower

    Nov 24, 2025 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Nov 18, 2025 · Apt 2B

    Close
  • General

    Bell/buzzer/intercom

    Nov 18, 2025 · Apt 2B

    Close
  • Plumbing

    Bathtub/shower

    Nov 18, 2025 · Apt 2B

    Close
  • Door/window

    Door

    Nov 18, 2025 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Jan 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 11, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 10, 2024 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Jul 13, 2024 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Jul 11, 2024 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Jul 10, 2024 · Apt 1B

    Close
  • Electric

    No lighting

    Jul 10, 2024 · Apt 1B

    Close
  • General

    Cabinet

    Jul 10, 2024 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Dec 22, 2023 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    Jul 9, 2022 · Apt 2A

    Close
  • Water leak

    Damp spot

    Jul 9, 2022 · Apt 2A

    Close
  • General

    Windows

    Mar 20, 2006 · Apt 2L

    Close
  • General

    Windows

    Mar 20, 2006 · Apt 2L

    Close
  • Plumbing

    Toilet

    Mar 20, 2006 · Apt 2L

    Close
  • General

    Doors

    Feb 10, 2006 · Apt 2L

    Close
  • General

    Doors

    Feb 10, 2006 · Apt 2L

    Close
  • General

    Windows

    Feb 10, 2006 · Apt 2L

    Close
  • Electric

    Lighting

    Feb 10, 2006 · Apt 2L

    Close
  • Plumbing

    Toilet

    Feb 10, 2006 · Apt 2L

    Close
  • Nonconst

    Janitor/super

    Dec 29, 2005 · Apt 3R

    Close
  • Nonconst

    Vermin

    Dec 28, 2005 · Apt 00

    Close
  • Nonconst

    Vermin

    Dec 28, 2005 · Apt 00

    Close
  • Plumbing

    Basin/sink

    Dec 28, 2005 · Apt 2L

    Close
  • General

    Mold

    Dec 28, 2005 · Apt 2L

    Close
  • Plumbing

    Basin/sink

    Dec 28, 2005 · Apt 2L

    Close
  • Nonconst

    Rubbish

    Dec 28, 2005 · Apt 00

    Close
  • Paint/plaster

    Ceiling

    Dec 28, 2005 · Apt 2L

    Close
  • Nonconst

    Vermin

    Dec 27, 2005 · Apt 2L

    Close
  • Nonconst

    Vermin

    Dec 27, 2005 · Apt 2L

    Close
  • General

    Mold

    Dec 27, 2005 · Apt 2L

    Close
  • Paint/plaster

    Ceiling

    Dec 27, 2005 · Apt 2L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1905
Floors
3
Residential units
6
Building area
6,000 ft²
Lot area
3,504 ft²
Zoning
R6B
Community board
308
Council district
35
Block / lot
1168 / 82
Assessed value
$891,450
Landmark / historic district
No

HPD registration #303905, last renewed Aug 25, 2025.

Questions about 615 Sterling Place

Who owns 615 Sterling Place?

The owner of record in NYC Department of City Planning PLUTO data is Sterling Washington, LLC.

Does 615 Sterling Place have violations?

Yes. NYC HPD has recorded 29 housing violations at this property.

Is 615 Sterling Place rent stabilized?

NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 615 Sterling Place built?

City records list 1905 as the year it was built.

How many apartments are in 615 Sterling Place?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.