420 Prospect Place
Brooklyn, NY 11238BBL 3-01162-0016Map
Owner of record: Prospect Equities Operating, LLC.
420 Prospect Place is a walk-up apartment building built in 1931 in Brooklyn, 11238. It has 8 residential units across 4 floors. The owner of record is Prospect Equities Operating, LLC.. HPD has recorded 47 housing violations here, most recently on August 8, 2025. 2 of the 47 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 47
- DOB violations
- 14
- ECB violations
- 0
- HPD complaints
- 132
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 47
- BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1b, 17th story, 1st apartment from east at south
Aug 8, 2025 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective countertop at sink at west wall in the kitchen located at apt 1b, 17th story, 1st apartment from east at south
Aug 8, 2025 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 1b, 17th story, 1st apartment from east at south
Aug 8, 2025 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of extremely hot water exceeding the allowable temperature of 130 degres fahrenheit and found to be at 156 degrees fahrenheit in the bathroom located at apt 1b, 17th story, 1st apartment from east at south
Aug 8, 2025 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective reglaze the porcelain paint at bathtub east wall in the bathroom located at apt 1b, 17th story, 1st apartment from east at south
Aug 8, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Replace with new the missing missing electrical light switch cover at south wall in the 1st room from north at east located at apt 1b, 17th story, 1st apartment from east at south
Aug 8, 2025 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing door stop at bottom of vestibule door east wall , at public hall, 1st story
Aug 8, 2025
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of hot water bbeing used instead of cold water to flush the water closet at north wall in the bathroom in the bathroom located at apt 1b, 17th story, 1st apartment from east at south
Aug 8, 2025 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the bathroom located at apt 1b, 17th story, 1st apartment from east at south
Aug 8, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective marble saddle at door in the entrance located at apt 1b, 17th story, 1st apartment from east at south
Aug 8, 2025 · Apt 1B
Closed — Violation dismissed
Show 37 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Nov 5, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Nov 5, 2024 · Apt 1A
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective bathtub faucet in the bathroom located at apt 2a, 2nd story
Feb 20, 2024 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Feb 9, 2024 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Feb 9, 2024 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Feb 7, 2024 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Feb 7, 2024 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Jan 30, 2024 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Jan 30, 2024 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement
Jan 30, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south
Jan 23, 2024 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south
Jan 23, 2024 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement
Jan 23, 2024
Closed — Violation dismissed - ANon-hazardous
Refit apartment entrance door located at apt 2a, 2nd story, apartment at north
Dec 1, 2020 · Apt 2A
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 4a, 4th story, apartment at north
Nov 17, 2020 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice located at apt 4a, 4th story, apartment at north
Nov 17, 2020 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches located at apt 4a, 4th story, apartment at north
Nov 17, 2020 · Apt 4A
Closed — Violation closed - ANon-hazardous
Replace with new the missing electrical outlet safety covers/caps, all stories at public hall
Jun 26, 2018
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south
Nov 15, 2015 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door to cellar locked. at public hall, 1st story
Nov 15, 2015
Closed — Violation closed - CImmediately hazardous
Replace with new the missing mechanical locking assembly at building entrance door , 1st story
Apr 15, 2015
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Apr 5, 2015
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures in the kitchen and bathroom in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Apr 28, 2014 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Nov 10, 2012 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Nov 10, 2012 · Apt 3B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector .......missing located at apt 3b, 3rd story, 1st apartment from east at south
Nov 10, 2012 · Apt 3B
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 3b, 3rd story, 1st apartment from east at south
Nov 10, 2012 · Apt 3B
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt bldg, 1st story, 1st apartment from east at south
Aug 13, 2012 · Apt BLDG
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b
Aug 13, 2012 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Aug 13, 2012
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, chair rails at east wall, chair rails at west wall, east wall, west wall in the foyer located at apt 3r, 3rd story, 1st apartment from south at west
Jun 1, 2006 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, south wall, east wall, west wall in the 1st room from north located at apt 3r, 3rd story, 1st apartment from south at west
Jun 1, 2006 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, 1st door frame from west at north wall, chair rails at north wall, chair rails at east wall in the 6th room from north located at apt 3r, 3rd story, 1st apartment from south at west
Jun 1, 2006 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door from north at east wall, 1st door frame from north at east wall in the 5th room from north located at apt 3r, 3rd story, 1st apartment from south at west
Jun 1, 2006 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st closet from north at east wall wall, 1st door frame from east at south wall, south wall, east wall, west wall in the 2nd room from north located at apt 3r, 3rd story, 1st apartment from south at west
Jun 1, 2006 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 1st door from north at east wall, 1st door frame from north at east wall, north wall, south wall, east wall, west wall in the 4th room from north located at apt 3r, 3rd story, 1st apartment from south at west
Jun 1, 2006 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, south wall, east wall, 1st window frame from east at south wall in the kitchen located at apt 3r, 3rd story, 1st apartment from south at west
Jun 1, 2006 · Apt 3R
Closed — Violation closed
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Aug 14, 1997
Vp*-violation unserved ecb- dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Plumbing
Water supply
Aug 6, 2025 · Apt 1B
Close - Heat/hot water
Entire building
Mar 19, 2025 · Apt 1B
Close - Heat/hot water
Entire building
Nov 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2024 · Apt NO
Close - Plumbing
Basin/sink
Feb 10, 2024 · Apt 2A
Close - Heat/hot water
Apartment only
Feb 7, 2024 · Apt 2A
Close - Plumbing
Bathtub/shower
Feb 7, 2024 · Apt 2A
Close - Heat/hot water
Apartment only
Feb 6, 2024 · Apt 3B
Close - Heat/hot water
Entire building
Jan 29, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2024 · Apt 3B
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 20, 2024 · Apt 1B
Close - Heat/hot water
Apartment only
Jan 17, 2024 · Apt 1B
Close - Heat/hot water
Apartment only
Feb 11, 2023 · Apt 1B
Close - Unsanitary condition
Garbage/recycling storage
Jan 1, 2016 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 1, 2016 · Apt BLDG
Close - Door/window
Door
Jan 1, 2016 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 16, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 16, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2015 · Apt 1B
Close - Heat/hot water
Entire building
Oct 27, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2015 · Apt 1B
Close - Heat/hot water
Entire building
Oct 17, 2015 · Apt 2A
Close - Heat/hot water
Apartment only
Jun 15, 2015 · Apt 1B
Close - Heat/hot water
Entire building
Jun 15, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 13, 2015 · Apt 3B
Close - Door/window
Door
Apr 13, 2015 · Apt BLDG
Close - Door/window
Door
Apr 1, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 23, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 31, 2014 · Apt 3B
Close - Heat/hot water
Entire building
Oct 31, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 28, 2014 · Apt 1B
Close - Heat/hot water
Entire building
Oct 19, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
May 5, 2014 · Apt 3B
Close - Heat/hot water
Entire building
Apr 29, 2014 · Apt 1B
Close - Heat/hot water
Entire building
Apr 29, 2014 · Apt 3B
Close - Heat/hot water
Entire building
Apr 28, 2014 · Apt 1B
Close - Heat/hot water
Entire building
Apr 27, 2014 · Apt 3B
Close - Heat/hot water
Entire building
Apr 22, 2014 · Apt 3B
Close - Heat/hot water
Entire building
Apr 15, 2014 · Apt 3B
Close - Heating
Heat related
Jan 22, 2014 · Apt 3B
Close - Heating
Heat related
Jan 20, 2014 · Apt NA
Close - Heating
Heat related
Jan 16, 2014 · Apt 3B
Close - Heating
Heat related
Jan 16, 2014 · Apt NA
Close - Heating
Heat related
Dec 27, 2013 · Apt 3B
Close - Heating
Heat related
Dec 22, 2013 · Apt 3B
Close - Heating
Heat related
Dec 16, 2013 · Apt NA
Close - Heating
Heat related
Dec 16, 2013 · Apt 1B
Close - Heating
Heat related
Dec 15, 2013 · Apt NA
Close - Heating
Heat related
Dec 10, 2013 · Apt NA
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1931
- Floors
- 4
- Residential units
- 8
- Building area
- 8,248 ft²
- Lot area
- 3,930 ft²
- Zoning
- R6B
- Community board
- 308
- Council district
- 35
- Block / lot
- 1162 / 16
- Assessed value
- $1,225,350
- Landmark / historic district
- No
HPD registration #321859, last renewed Aug 25, 2025.
Questions about 420 Prospect Place
Who owns 420 Prospect Place?
The owner of record in NYC Department of City Planning PLUTO data is Prospect Equities Operating, LLC..
Does 420 Prospect Place have violations?
Yes. NYC HPD has recorded 47 housing violations at this property.
Is 420 Prospect Place rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 100% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 420 Prospect Place built?
City records list 1931 as the year it was built.
How many apartments are in 420 Prospect Place?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.