998-1010 Pacific Street
Brooklyn, NY 11238BBL 3-01133-0032Map
Owner of record: 1010 Pacific Owner LLC
998-1010 Pacific Street is an elevator apartment building built in 2022 in Brooklyn, 11238. It has 175 residential units across 9 floors. The owner of record is 1010 Pacific Owner LLC. HPD has recorded 33 housing violations here, most recently on March 8, 2026. 2 of the 33 most recent violations are still open. City tax records listed 54 rent-stabilized apartments here in 2024.
- HPD violations
- 33
- DOB violations
- 53
- ECB violations
- 19
- HPD complaints
- 22
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 33
- BHazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic lock at building entrance door at public hall, 1st story
Mar 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall
Mar 8, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Mar 8, 2026
Closed — Violation dismissed - BHazardous
Provide security in the event of a power outage by means of an acceptable heavy duty lock and latch set at building entrance door at public hall, 1st story
Mar 8, 2026
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in closet in the 1st room from north at west located at apt 108, 1st story, 4th apartment from west at north
Sep 10, 2025 · Apt 108
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor plank in the kitchen located at apt 108, 1st story, 4th apartment from west at north
Sep 10, 2025 · Apt 108
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in closet in the 1st room from north at west located at apt 108, 1st story, 4th apartment from west at north
Sep 10, 2025 · Apt 108
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 108, 1st story, 4th apartment from west at north
Sep 10, 2025 · Apt 108
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in closet in the 1st room from north at west located at apt 108, 1st story, 4th apartment from west at north original violation 18219978 issued 10-sep-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Sep 10, 2025 · Apt 108
Open — First no access to re- inspect violation - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking devcice installed at building front entrance door at public hall, 1st story
Mar 16, 2025
Closed — Violation dismissed
Show 23 more ↓
- BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch-set at building entrance door at public hall, 1st story
Mar 16, 2025
Open — False certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the kitchen located at apt 108, 1st story, 7th apartment from west at north
Aug 6, 2023 · Apt 108
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 1sq.ft at ceiling and 1 sq.ft at south wall inside the closet in the 1st room from north at west located at apt 108, 1st story, 7th apartment from west at north
Aug 6, 2023 · Apt 108
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall, inside the closet in the 1st room from north at west located at apt 108, 1st story, 7th apartment from west at north
Aug 6, 2023 · Apt 108
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 1 sq.ft. at south wall in the kitchen located at apt 108, 1st story, 7th apartment from west at north
Aug 6, 2023 · Apt 108
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 4, 2023
Closed — Violation dismissed - BHazardous
Remove the illegal fastening double cylinder key operated lock installed on vestibule door at public hall, 1st story
Aug 4, 2023
Closed — Violation closed - BHazardous
Remove the illegal fastening double cylinder key operated lock installed on front entrance door to building , 1st story
Aug 4, 2023
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 4, 2023
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 2 square feet at west wall, in closet 1st from east at south in the 1st room from north at west located at apt 108, 1st story, 7th apartment from west at north
Aug 3, 2023 · Apt 108
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 2 surface feet at the ceiling and south wall in the kitchenette located at apt 108, 1st story, 7th apartment from west at north
Aug 3, 2023 · Apt 108
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the closet 1st from east at south in the 1st room from north at west located at apt 108, 1st story, 7th apartment from west at north
Aug 3, 2023 · Apt 108
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling ,south and west walls in closet 1st from east at south in the 1st room from north at west located at apt 108, 1st story, 7th apartment from west at north
Aug 3, 2023 · Apt 108
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and south wall in the kitchenette located at apt 108, 1st story, 7th apartment from west at north
Aug 3, 2023 · Apt 108
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchenette located at apt 108, 1st story, 7th apartment from west at north
Aug 3, 2023 · Apt 108
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box [missiing] at public hall, 1st story
Aug 3, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 3, 2023
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at [ missing frame ] at public hall, 1st story
Aug 3, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 3, 2023
Closed — Violation dismissed - BHazardous
Remove the illegal fastening double cylinder key operated lock installed on vestibule door at public hall, 1st story
Aug 3, 2023
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 3, 2023
Closed — Violation dismissed - BHazardous
Remove the illegal fastening double cylinder key operated lock installed front entrance door to building , 1st story
Aug 3, 2023
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 2 square feet at west wall, in closet 1st from east at south in the 1st room from north at west located at apt 108, 1st story, 7th apartment from west at north original violation 16140816 issued 03-aug-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 3, 2023 · Apt 108
Closed — Violation closed
DOB building violations · 53
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 10, 2022
Vp*-violation unserved ecb- dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jul 30, 2014
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 18, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 22, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 13, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 14, 2009
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 2, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 25, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 22, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Elevator elevatorrequired
3f3873
Jul 19, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed
ECB violations · 19
- Class - 1
Class 1 c/u: dlm inoperative. elevator operated with a defective door lock monitoring system in violation of asme a17.1/csa b44-2013 2.26.9 and nyc building code appendix k3. provide proper repair and restore f
May 14, 2026 · Penalty $1,250
Resolve - Class - 1
Failure to maintain work storage on street. note: at time of inspection observed materials storage on street at exposure one an unsafe conditions approximately more then 5 feet height bricks, concrete bags, and
Oct 1, 2022 · Penalty $2,500
Resolve - Class - 2
Observed supported pipe scaffold installed on 3rd floor balcony at exp#4 with cut frames to supported the supported pipe scaffold. cutting frames on supported pipe scaffold not allowed by manufacture specificat
Apr 11, 2022
Resolve - Class - 2
Observed sidewalk shed installed at exp#2 rear yard blocking the adjacent building ( 1020 pacific street,) multiple family dwelling fire escape. observed no opening on the sidewalk shed deck for the adjacent bu
Apr 11, 2022 · Penalty $625
Resolve - Class - 2
Work doesnt conform to approved const docs &or approved amendments atoi of active jobsite.i observed supported scf contrary to approved design.missing horiz ties@every pipe frame as per design stop all work on
Mar 10, 2022
Resolve - Class - 2
Failure to maintain/display onsite docs required by ch33 atoi of active jobsite i observed concrete straps thruout jobsite when i ask for logbook for concrete straps none were provided.stop all work on concrete
Mar 10, 2022
Resolve - Class - 1
Failure to comply w/spec of manufacturer.atoi of active jobsite i observed workers on supported scf w/harness.when i checked dates on back none were checked by competent person/qualified person or signed.no log
Mar 10, 2022
Resolve - Class - 2
Needle beam scf contrary to design atoi of active jobsite i observed missing 1sec as per design@exp2 needle beam.missing horiz braces@every pipe frame as per design on all exps.junior beams not installed in ord
Mar 10, 2022
Resolve - Class - 1
Sec. bc3303.3 watch person. at time of inspection of a 9 sty bldg at 8level approx 166.865 sq feet-site closed & there were no construction activity. upon shouting on fence to alert watch persons & to verify
Nov 27, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to provide/maintain adequate housekeeping per section requirements:at time of inspection at an active jobsite nb proposed 9 story residential apartment building it was observed failure to provide/mainta
Oct 4, 2021
Resolve
Show 9 more ↓
- Class - 1
Bc 28-105.1 dot permit note:at the time of my inspection of a 9 story new building construction work in progress.i observed at exp#1 infrontof adjacent property concrete washout box and office trailer.upon revi
Sep 30, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain document onsite. upon request for sidewalk shed daily inspection log for s.w.s in place along perimeter of exp 1(pacificst) none was provided or made available as req'd by code(bc 3307.6.5.1
Sep 19, 2021
Resolve - Class - 1
Failure to safeguard all persons onsite affected by construction operations-no rebar caps.note:at time of my inspection of an active jobsiteat foundation stage i observed 3 workers working between in capped reb
Jun 11, 2021 · Penalty $625
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations-open access to jobsite.note:at time of my inspection of an active jobsite at foundation stage active jobsite with concrete pourin
Jun 11, 2021 · Penalty $500
Resolve - Class - 1
Bc 3304.4.4 failure to provide 3'6" guardrail system or solid enclosure around open and accessible sides of excavation.note:at time of my inspection of an active 9 story new building construction.at foundation
Jun 11, 2021 · Penalty $625
Resolve - Class - 2
Construction superintendent failed to perform duties as per rule. noteat the time of my inspection of a 2 sty bldg under demolition at gradelevel some walls still in place. demolition in progress. upon request
Apr 6, 2020
Resolve - Class - 2
Failure to safeguard,institute & maintain safety equipment measures. note: at the time of my inspection of a 2 sty bldg under demolition down to grade some walls still in place & cellar,demolition in progress.
Apr 6, 2020 · Penalty $5,000
Resolve - Non-hazardous
11q,46t,49t
Mar 28, 1994
Resolve - Non-hazardous
52u,#52 provide electro - mechanical brake
Aug 29, 1991
Resolve
Complaints
- Electric
Power outage
Mar 4, 2026 · Apt BLDG
Close - Door/window
Door
Feb 12, 2026 · Apt 821
Close - Heat/hot water
Apartment only
Feb 12, 2026 · Apt 821
Close - Water leak
Slow leak
Nov 6, 2025 · Apt 108
Close - Water leak
Slow leak
Sep 7, 2025 · Apt 108
Close - Flooring/stairs
Floor
Sep 7, 2025 · Apt 108
Close - Unsanitary condition
Mold
Sep 7, 2025 · Apt 108
Close - Unsanitary condition
Mold
Jan 10, 2025 · Apt 202
Close - Electric
Lighting
Jan 10, 2025 · Apt 202
Close - Paint/plaster
Ceiling
Jan 10, 2025 · Apt 202
Close
Show 12 more ↓
- Paint/plaster
Wall
Jan 10, 2025 · Apt 202
Close - Water leak
Damp spot
Oct 24, 2023 · Apt 108
Close - Flooring/stairs
Floor
Oct 24, 2023 · Apt 108
Close - Paint/plaster
Wall
Oct 24, 2023 · Apt 108
Close - Unsanitary condition
Mold
Aug 1, 2023 · Apt 108
Close - Paint/plaster
Ceiling
Aug 1, 2023 · Apt 108
Close - Unsanitary condition
Mold
Jul 29, 2023 · Apt 108
Close - Water leak
Slow leak
Jul 29, 2023 · Apt 108
Close - Paint/plaster
Ceiling
Jul 29, 2023 · Apt 108
Close - Paint/plaster
Ceiling
Jul 25, 2023 · Apt 108
Close - Unsanitary condition
Mold
Jul 20, 2023 · Apt 108
Close - Heating
Heat related
Feb 5, 2007 · Apt 5F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2022
- Floors
- 9
- Residential units
- 175
- Building area
- 165,024 ft²
- Lot area
- 25,869 ft²
- Zoning
- M1-2A/R6A
- Community board
- 308
- Council district
- 35
- Block / lot
- 1133 / 32
- Assessed value
- $17,698,500
- Landmark / historic district
- No
HPD registration #390635, last renewed Jul 1, 2025.
Questions about 998-1010 Pacific Street
Who owns 998-1010 Pacific Street?
The owner of record in NYC Department of City Planning PLUTO data is 1010 Pacific Owner LLC.
Does 998-1010 Pacific Street have violations?
Yes. NYC HPD has recorded 33 housing violations at this property.
Is 998-1010 Pacific Street rent stabilized?
NYC Department of Finance tax bills listed 54 rent-stabilized units here in 2024 (about 31% of its 175 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 998-1010 Pacific Street built?
City records list 2022 as the year it was built.
How many apartments are in 998-1010 Pacific Street?
It has 175 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.