719 Dean Street
Brooklyn, NY 11238BBL 3-01130-0059Map
Owner of record: 719 Dean Street Realty LLC
719 Dean Street is a walk-up apartment building built in 2012 in Brooklyn, 11238. It has 8 residential units across 4 floors. The owner of record is 719 Dean Street Realty LLC. HPD has recorded 9 housing violations here, most recently on May 19, 2022. 2 of the 9 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 9
- DOB violations
- 11
- ECB violations
- 31
- HPD complaints
- 1
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 9
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 1r, 1st story
May 19, 2022 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at apartnent in the entrance located at apt 1r, 1st story, 1st apartment from west at north
Mar 14, 2022 · Apt 1R
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Mar 14, 2022 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures ..at sink, washbasin and bathtub in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Mar 14, 2022 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Mar 14, 2022 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 2 square at ceiling in shower stall, in the bathroom located at apt 1r lower level, 1st story, 1st apartment from west at north
Mar 14, 2022 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective (fire door 1st from south at west) at public hall, 1st story
Mar 14, 2022
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective (fire door 1st from south at west) at public hall, 2nd story
Mar 14, 2022
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required at front areaway
Aug 15, 2017
Open — Nov sent out
DOB building violations · 11
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 2, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 17, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 17, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 17, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 17, 2013
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Oct 2, 1998
Dob violation - dismissed
Show 1 more ↓
- Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Oct 2, 1998
Dob violation - dismissed
ECB violations · 31
- Class - 2
Failure to provide required "project information panel" the last nb permit #320286294 was renewed on 7-29-14 for this proposed 8 unit bldgrmdy: post at site project info panel.
Oct 6, 2014 · Penalty $4,000
Resolve - Class - 2
Temporary construction equipment on site.the permit for construction fence at site which remains up expired on 7-21-14. rmdy: renw fence permit.
Oct 6, 2014 · Penalty $4,000
Resolve - Class - 2
Ob site fence not constructed and/or maintained pursuant to subsectio n 8'high fence has not been maintained around entire job site.a sectionf fence approx 16'long has been repalced with guardrailing which is n
Oct 6, 2014 · Penalty $4,000
Resolve - Class - 1
Bc3309.10 no protection for roof. observed scaffold erected on the roof of adjacent bldg ( 721 dean st ) at exp # 4 no roof protection provided pswo issued pursuant to 28-207.2 and posted at premises. remedy: s
Jun 4, 2014 · Penalty $8,000
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements observed big pile of wooden pallets in front yard & in hallway @ 1st fl const. &cbri potential for accidential to happen ( fire or collapse of
Jun 4, 2014 · Penalty $12,000
Resolve - Class - 2
Failure to provide approved document / plans at job site at time of insp. observed supported scaffold ercted at exp. 4 from ground up to roof level & on top of roof of adjacent bldg ( 721 dean st ) permit # 320
Jun 4, 2014 · Penalty $2,500
Resolve - Class - 1
No guard rails. observed 4 story new bldg topped off missing guardrails at various locations throughout bldg for example ; 4 story terrace front and back of bldg rear yard around stair well and other location i
Jun 4, 2014 · Penalty $12,000
Resolve - Class - 2
Failure to provide approved / accepted plans / documents at job site @time of insp. observed 3 workers on site no one knew where the plans /drawing were pswo - issued pursuant to 28-207.2 & posted at premises
Jun 4, 2014 · Penalty $2,500
Resolve - Class - 1
Bc3307.7 fences. observed job site gate at exp 1 swing out potential for incident to happen; walking by pedestrain gets hit. remedy: repair gates as per code
Jun 4, 2014 · Penalty $8,000
Resolve - Class - 2
3307.6.5 debris materials garage & a pallet of bricks were observed onsidewalk shed @ front of bldg.rem:remove debris,garbage and materials (bricks)from top of sidewalk shed.
Mar 31, 2014
Resolve
Show 21 more ↓
- Class - 1
Failure to insitute/maintain safety equipment measures or temporary const.no guard rails.no guard railing has been provide for 12'high concrete walls @ rear yard/rear entrance to cellar.rem:provide guard railin
Mar 31, 2014 · Penalty $12,000
Resolve - Class - 2
3307.7 gates in fence @ entrance to bldg swing out onto sidewalk creating a hazard to pedestrians.rem:repair and/or replace entrance gates so that they swing in onto site not out onto sidewalk.
Mar 31, 2014
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection. noted: nb construction site fence erected under permit #320286294-01- eq-fn issued on 7.26.13 renewal and expires on 7.21.14 does not comply
Nov 9, 2013
Resolve - Class - 2
Project information panel/construction sign not provided or not in compliance w/section. noted: construction site fence erected under permit#320286294-01-eq-fm intial issue 6/5/12 renewed 7/26/12 does not compl
Oct 25, 2013 · Penalty $800
Resolve - Class - 1
Bc3307.3.2 failure to provide fence as required at time of inspection,observed section of fence missing at exposure 4 - adjacent property now has access into construction job site. rmdy: install fence as per co
May 14, 2013 · Penalty $1,600
Resolve - Class - 1
Failure to provide site walk shed as per code at time of inspection observed bldg erected 40'in height no sidewalk shed erected as per code as per site plans, building is now erected over 40' in height with re
May 14, 2013 · Penalty $4,800
Resolve - Class - 1
Obstruction of sidewalk & street w/o d.o.t. permit at time of inspection observed 30yard debris container on street fronting job site - no d.o.t. permit on side. rmdy: obtain & post d.o.t. permit for container
May 14, 2013 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations - at time of inspection observed fire escape at 721 dean stnot protected from construction operation in progress at 719 dean st.
May 14, 2013 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard all persons and property (affected) by construction operations. noted: at nb under construction, no overhead protectionfor adjacent property at exp 2&4 for cmu w/height approx 40' above
Apr 23, 2013 · Penalty $12,000
Resolve - Class - 1
Failure to institute/maintain safety equipment. measures or temporary construction - no guard rails. noted: at 3rd flr level, at exp 3, no guard rails installed at ground flr rear exp around vaulted staircase
Apr 23, 2013 · Penalty $12,000
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction - no hand rails. noted: at 4th sty nb under construction,no temporary hand rails observed on staircases at 1st & 2nd flrs.
Apr 23, 2013 · Penalty $5,000
Resolve - Class - 1
Sec. 3303.11. maintenance of exits during construction or demolition. noted: a nb under construction has inadequate ingress & egress to 4th & cellar flrs. @ 3rd flr makeshift ladder sitting on aluminum scaffold
Apr 23, 2013 · Penalty $8,000
Resolve - Class - 2
Failure to maintaining adequate housekeeping per section requirements.noted: at nb under construction piled up debris consisting of paper boxes, wood cut offs, masonry block piled up at front exp approx 3'high
Apr 23, 2013 · Penalty $4,000
Resolve - Class - 2
Job site fence not constructed pursuant to subsection.@4-story proposed bldg @exp# job#320286294-01-dq-fn cons fence @exp#2 has wood fence down on adj property of 854 pacific st,rear yard,approx 3,4 panels dow
Jan 23, 2013 · Penalty $400
Resolve - Class - 2
Bc 3303.3 fail to post dot permits for sidewalk closing.noted:@4-story proposed new bldg @exp#1 construction fence erected takes up approx 5' of sidewalk w/no dot permit posted.rem:obtain dot permit and post pe
Jan 23, 2013
Resolve - Class - 2
Fail to post permit for work at premises.noted:@insp obs @site front no posted new building & fence permit #320286294 as req per sect 28-105.11 of bldg code.rem:post req nb/fence permits. comply w/code.
Dec 27, 2012 · Penalty $400
Resolve - Class - 2
3303.3 obstruction of sidewalk w/o dot permit.noted:@insp @front of site obs erected site fence partially obstructing sidewalk area,& no required dot permit obtained for fence maintaining as per sect:bc3303.3
Dec 27, 2012 · Penalty $400
Resolve - Class - 2
3304.3.1;27-1031:failure to notify dob within 24-48hrs of the start ofexcavation. noted:upon inspection partial foundation completed & excavation no notification given. rem:offically notify dob by calling 212-2
Aug 7, 2012
Resolve - Hazardous
Failure to maintain bldg hazardous defects noted: wood canopy (awning)above 2 garage door is rotten, defective w/ broken/missing section. leaning, pulling away cracked top masonry parapet wall approx: 3ft wide
Sep 5, 2007 · Penalty $800
Resolve - Non-hazardous
Failure to comply with the commissioner order to correct the violatingcondition & file a certificate of correction with the nyc dob for notice of violation #34183833k issued on 9/18/98 & compliance date 1/23/99
Sep 5, 2007
Resolve - Hazardous
Failure to maintain exterior wall/ hazardius defects are at front parapet wall of garage wall is leaning out toward side walk approx 8' overa 3' rise. wall is in imminent danger of collapsing to driveway approx
Sep 18, 1998 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Apartment only
Mar 12, 2022 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2012
- Floors
- 4
- Residential units
- 8
- Building area
- 10,448 ft²
- Lot area
- 2,750 ft²
- Zoning
- R6B
- Community board
- 308
- Council district
- 35
- Block / lot
- 1130 / 59
- Assessed value
- $1,732,500
- Landmark / historic district
- No
HPD registration #386261, last renewed Sep 15, 2025.
Questions about 719 Dean Street
Who owns 719 Dean Street?
The owner of record in NYC Department of City Planning PLUTO data is 719 Dean Street Realty LLC.
Does 719 Dean Street have violations?
Yes. NYC HPD has recorded 9 housing violations at this property.
Is 719 Dean Street rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 100% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 719 Dean Street built?
City records list 2012 as the year it was built.
How many apartments are in 719 Dean Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.