225 Berkeley Place
Brooklyn, NY 11217BBL 3-01061-0052Map
Owner of record: 225 Berkeley LLC
225 Berkeley Place is a walk-up apartment building built in 1884 in Brooklyn, 11217. It has 8 residential units across 3 floors. The owner of record is 225 Berkeley LLC. HPD has recorded 22 housing violations here, most recently on September 15, 2026. 1 of the 22 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2024.
- HPD violations
- 22
- DOB violations
- 7
- ECB violations
- 1
- HPD complaints
- 85
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 15, 2026
Open — Nov certified on time - ANon-hazardous
Cleanse to the satisfaction of this department the ceramic tiles with grout joints / caulking surface of visible mold at east ,south and west walls at bathtub in the bathroom located at apt 3r, 2nd story, 2nd apartment from south at west
Nov 6, 2020 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective wood muntin at at lower sash window 1st from north in the 1st room from north at east located at apt 3r, 2nd story, 2nd apartment from south at west
Nov 6, 2020 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3r, 2nd story, 2nd apartment from south at west
Nov 6, 2020 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at apartment in the entrance located at apt 3r, 2nd story, 2nd apartment from south at west
Nov 6, 2020 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 6, 2020
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3r, 2nd story, 2nd apartment from west at north
Nov 9, 2018 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 3r, 2nd story, 2nd apartment from west at north
Nov 9, 2018 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door
Nov 9, 2018
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the entire apartment located at apt 3r, 2nd story, 2nd apartment from west at north
Jun 11, 2017 · Apt 3R
Closed — Violation closed
Show 12 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and the north wall in the bathroom located at apt 3r, 2nd story, 2nd apartment from west at north
Jun 11, 2017 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at upper sash east 1 window in the 1st room from north located at apt 3r, 2nd story, 2nd apartment from west at north
Jun 11, 2017 · Apt 3R
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 11, 2017
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing on wall at public hall, 1st story
Jun 11, 2017
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the walls and ceilings in the entire apartment located at apt 3r, 2nd story, 2nd apartment from south at west
Feb 24, 2008 · Apt 3R
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at walls and ceilings in the entire apartment located at apt 3r, 2nd story, 1st apartment from west at north
Nov 4, 2007 · Apt 3R
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood door in the bathroom located at apt 3r, 2nd story, 1st apartment from west at north
Nov 4, 2007 · Apt 3R
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood door in the 1st room from north at east located at apt 3r, 2nd story, 1st apartment from west at north
Nov 4, 2007 · Apt 3R
Closed — Violation closed - ANon-hazardous
Refit upper and lower sashes at window at north wall in the 1st room from north at east located at apt 3r, 2nd story, 1st apartment from west at north
Nov 4, 2007 · Apt 3R
Closed — Violation closed - ANon-hazardous
Replace with new the missing sash chain at upper sash at west window at north wall in the 1st room from north at west located at apt 3r, 2nd story, 1st apartment from west at north
Nov 4, 2007 · Apt 3R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at north located at apt 3r, 2nd story, apartment at north
Apr 7, 2007 · Apt 3R
Closed — Violation closed - BHazardous
Replace with new the missing shut off valve handle at radiator in the 2nd room from north located at apt 3r, 2nd story
Dec 25, 2005 · Apt 3R
Closed — Violation closed
DOB building violations · 7
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations · 1
- Non-hazardous
50a check valve missing on feed water line. 50b flue pipe not properlysealed chimney. 50c holes in boiler room walls & ceiling. 50d fusable link fire damper (in fresh air valve) 50e bq9 no work permit. filed
Jan 8, 2008 · Penalty $650
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Jul 28, 2026 · Apt BLDG
Close - Door/window
Window pane
Jul 16, 2025 · Apt 3R
Close - Door/window
Window frame
Jul 10, 2025 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 1, 2020 · Apt 3R
Close - Door/window
Window frame
Nov 1, 2020 · Apt 3R
Close - Heat/hot water
Entire building
Nov 9, 2018 · Apt 3R
Close - Heat/hot water
Apartment only
Apr 18, 2018 · Apt 3R
Close - Heat/hot water
Apartment only
Apr 18, 2018 · Apt 3R
Close - Paint/plaster
Wall
May 19, 2017 · Apt 3R
Close - Paint/plaster
Wall
May 19, 2017 · Apt 3R
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Jun 30, 2014 · Apt 3R
Close - Paint/plaster
Wall
Jun 30, 2014 · Apt 3R
Close - Door/window
Door frame
Jun 30, 2014 · Apt 3R
Close - Heating
Heat related
Dec 10, 2009 · Apt 3R
Close - Heating
Heat related
Nov 5, 2009 · Apt 3R
Close - Heating
Heat related
Jan 17, 2009 · Apt 3R
Close - Heating
Heat related
Dec 3, 2008 · Apt 3R
Close - Heating
Heat related
Nov 18, 2008 · Apt 3R
Close - Heating
Heat related
Nov 17, 2008 · Apt 3R
Close - Heating
Heat related
Nov 16, 2008 · Apt 3R
Close - Heating
Heat related
Oct 27, 2008 · Apt 3R
Close - Heating
Heat related
Oct 24, 2008 · Apt 3R
Close - Heating
Heat related
Oct 22, 2008 · Apt 3R
Close - Paint/plaster
Wall
Jun 9, 2008 · Apt 3R
Close - Paint/plaster
Wall
Jun 9, 2008 · Apt 3R
Close - Paint/plaster
Window/frame
Jun 9, 2008 · Apt 3R
Close - Heating
Heat related
Feb 29, 2008 · Apt 3R
Close - Heating
Heat related
Feb 12, 2008 · Apt 3R
Close - Paint/plaster
Wall
Feb 12, 2008 · Apt 3R
Close - Heating
Heat related
Feb 11, 2008 · Apt 3R
Close - Paint/plaster
Wall
Feb 11, 2008 · Apt 3R
Close - Heating
Heat related
Nov 21, 2007 · Apt 3R
Close - Heating
Heat related
Nov 21, 2007 · Apt 3R
Close - Heating
Heat related
Nov 20, 2007 · Apt 3R
Close - Heating
Heat related
Nov 19, 2007 · Apt 3R
Close - Heating
Heat related
Nov 7, 2007 · Apt 3R
Close - General
Doors
Oct 31, 2007 · Apt 3R
Close - General
Doors
Oct 31, 2007 · Apt 3R
Close - Paint/plaster
Wall
Oct 31, 2007 · Apt 3R
Close - General
Windows
Oct 31, 2007 · Apt 3R
Close - General
Windows
Oct 31, 2007 · Apt 3R
Close - Heating
Heat related
Oct 31, 2007 · Apt 3R
Close - General
Doors
Apr 12, 2007 · Apt 3R
Close - General
Windows
Apr 12, 2007 · Apt 3R
Close - Paint/plaster
Ceiling
Apr 12, 2007 · Apt 3R
Close - Paint/plaster
Wall
Apr 12, 2007 · Apt 3R
Close - Heating
Heat related
Mar 7, 2007 · Apt 3R
Close - Heating
Heat related
Mar 7, 2007 · Apt 3R
Close - Heating
Heat related
Mar 5, 2007 · Apt 3R
Close - Paint/plaster
Wall
Mar 5, 2007 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1884
- Floors
- 3
- Residential units
- 8
- Building area
- 4,560 ft²
- Lot area
- 2,100 ft²
- Zoning
- R7B
- Community board
- 306
- Council district
- 39
- Block / lot
- 1061 / 52
- Assessed value
- $974,250
- Landmark / historic district
- Park Slope Historic District
HPD registration #372899, last renewed Oct 21, 2025.
Questions about 225 Berkeley Place
Who owns 225 Berkeley Place?
The owner of record in NYC Department of City Planning PLUTO data is 225 Berkeley LLC.
Does 225 Berkeley Place have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 225 Berkeley Place rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 13% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 225 Berkeley Place built?
City records list 1884 as the year it was built.
How many apartments are in 225 Berkeley Place?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.