239 14 Street
Brooklyn, NY 11215BBL 3-01034-0047Map
Owner of record: 239 14th Street LLC
239 14 Street is a walk-up apartment building built in 1931 in Brooklyn, 11215. It has 6 residential units across 3 floors. The owner of record is 239 14th Street LLC. HPD has recorded 97 housing violations here, most recently on October 7, 2026. 24 of the 50 most recent violations are still open. City tax records listed 5 rent-stabilized apartments here in 2024.
- HPD violations
- 97
- DOB violations
- 17
- ECB violations
- 0
- HPD complaints
- 110
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 97
- BHazardous
Properly repair with similar material the broken or defective at ceramic floor tile in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north
Oct 7, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
Jun 28, 2026 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective vestibule door latch set at public hall, 1st story
Jun 28, 2026
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
Jun 28, 2026 · Apt 2L
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall, in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north
Jun 22, 2026 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Jun 22, 2026 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Jun 22, 2026 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set at door, in the entrance located at apt 2l, 2nd story, 1st apartment from west at north
Jun 22, 2026 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet, at east, south walls, in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north
Jun 22, 2026 · Apt 2L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north
Jun 22, 2026 · Apt 2L
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north
Jun 22, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west ,north and east walls in the kitchen located at apt 2l, 2nd story, 1st apartment from west at north
Jun 22, 2026 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 4 in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Jun 22, 2026 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 2l, 2nd story, 1st apartment from west at north
Jun 22, 2026 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at the vestibule door at public hall, 1st story
Jun 22, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set assembly at the vestibule door at public hall, 1st story
Jun 22, 2026
Closed — Violation dismissed - ANon-hazardous
§ 213, subd. 5 m/d law discontinue use of interior room for living or provide a single opening of at least 60 percent of area of the partition to room having window opening directly to street or yard at the south wall, in the 5th room from north located at apt 2l, 2nd story, 1st apartment from west at north
Jun 22, 2026 · Apt 2L
Open — Civ14 mailed - ANon-hazardous
§ 213, subd. 5 m/d law discontinue use of interior room for living or provide a single opening of at least 60 percent of area of the partition to room having window opening directly to street or yard at the north wall, in the 4th room from north located at apt 2l, 2nd story, 1st apartment from west at north
Jun 22, 2026 · Apt 2L
Open — Civ14 mailed - ANon-hazardous
Cleanse to the satisfaction of this department the visible mold at caulking and grout joints of the ceramic tiles at south, west and north walls around bathtub, in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north
Jun 22, 2026 · Apt 2L
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and west wall in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
Sep 6, 2024 · Apt 2L
Open — Invalid certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2l, 2nd story, 1st apartment from north at east
Sep 6, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 2l, 2nd story, 1st apartment from north at east
Sep 6, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective reglaze bathtub with porcelain paint in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
Sep 6, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
Sep 6, 2024 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
Sep 6, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch at vestibule door , 1st story
Jun 8, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door , 1st story
Jun 8, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north
Apr 24, 2024 · Apt 2R
Open — Not complied with - BHazardous
Repair the broken or defective connection waste pipe at sink in the kitchen located at apt 2r, 2nd story, 2nd apartment from west at north
Apr 24, 2024 · Apt 2R
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceed the maximum allowable temperature of 130 f ( 170 f found) in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north
Apr 24, 2024 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north
Apr 24, 2024 · Apt 2R
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north
Apr 24, 2024 · Apt 2R
Open — Not complied with - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north
Apr 24, 2024 · Apt 2R
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective base cabinet at the east wall in the kitchen located at apt 2r, 2nd story, 2nd apartment from west at north
Apr 24, 2024 · Apt 2R
Open — Not complied with - ANon-hazardous
Properly repair or replace the broken or defective wall cabinet at the east wall in the kitchen located at apt 2r, 2nd story, 2nd apartment from west at north
Apr 24, 2024 · Apt 2R
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx. 2 sq ft at the north wall and ceiling in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north
Apr 24, 2024 · Apt 2R
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx. 2 sq ft at the north wall and ceiling in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north original violation 16920974 issued 24-apr-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Apr 24, 2024 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Jun 11, 2020
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 11, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jun 11, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jun 11, 2020
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Jun 11, 2020
Open — Nov sent out - BHazardous
Properly secure the loose wooden handrail at stairs leading to 2nd story public hall
Mar 13, 2020
Closed — Violation closed - BHazardous
Properly secure the loose wooden handrail at public hall, 2nd story
Mar 13, 2020
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
Feb 15, 2020 · Apt 2L
Open — Invalid certification - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, south wall, 1st window frame from north at east wall in the 3rd room from east located at apt 2l, 2nd story, 1st apartment from north at east
Feb 15, 2020 · Apt 2L
Open — Invalid certification - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the kitchen located at apt 2l, 2nd story, 1st apartment from north at east
Feb 15, 2020 · Apt 2L
Open — Invalid certification - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
Feb 15, 2020 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, south wall, east wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 5th room from east located at apt 2l, 2nd story, 1st apartment from north at east
Feb 15, 2020 · Apt 2L
Open — Invalid certification - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, 1st closet from east at south wall door frame, 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st closet from north at east wall wall, 1st door frame from north at east wall, north wall, south wall, 1st window frame from west at north wall in the 4th room from east located at apt 2l, 2nd story, 1st apartment from north at east
Feb 15, 2020 · Apt 2L
Open — Invalid certification
DOB building violations · 17
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed
Show 7 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Damp spot
Jun 24, 2026 · Apt 2L
Close - Unsanitary condition
Mold
Jun 24, 2026 · Apt 2L
Close - Flooring/stairs
Floor
Jun 24, 2026 · Apt 2L
Close - Unsanitary condition
Mold
Jun 18, 2026 · Apt 2L
Close - Water leak
Slow leak
Jun 18, 2026 · Apt 2L
Close - Water leak
Slow leak
Sep 4, 2024 · Apt 2L
Close - Paint/plaster
Ceiling
Sep 4, 2024 · Apt 2L
Close - Electric
Power outage
Aug 26, 2024 · Apt 2R
Close - Unsanitary condition
Mold
Apr 23, 2024 · Apt 2R
Close - Door/window
Door
Apr 23, 2024 · Apt 2R
Close
Show 40 more ↓
- Unsanitary condition
Pests
Apr 23, 2024 · Apt 2R
Close - Heat/hot water
Apartment only
Apr 23, 2024 · Apt 2R
Close - Plumbing
Basin/sink
Apr 23, 2024 · Apt 2R
Close - Paint/plaster
Cabinet
Apr 23, 2024 · Apt 2R
Close - Plumbing
Bathtub/shower
Apr 23, 2024 · Apt 2R
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt BLDG
Close - Paint/plaster
Wall
Feb 12, 2020 · Apt 2L
Close - Electric
Power outage
Jan 30, 2020 · Apt 2L
Close - Heat/hot water
Entire building
Dec 1, 2018 · Apt 2R
Close - Plumbing
Water supply
Sep 27, 2017 · Apt 2R
Close - Paint/plaster
Wall
Sep 27, 2017 · Apt 2R
Close - Paint/plaster
Wall
Sep 27, 2017 · Apt 2R
Close - General
Cabinet
Jul 11, 2017 · Apt 2R
Close - Water leak
Slow leak
Jul 11, 2017 · Apt 2R
Close - Paint/plaster
Wall
Jul 11, 2017 · Apt 2R
Close - Plumbing
Bathtub/shower
Jul 11, 2017 · Apt 2R
Close - Water leak
Damp spot
Jul 11, 2017 · Apt 2R
Close - Electric
Outlet/switch
Jul 11, 2017 · Apt 2R
Close - Door/window
Door
Jul 11, 2017 · Apt 2R
Close - Electric
Outlet/switch
Jul 11, 2017 · Apt 2R
Close - Paint/plaster
Wall
Jul 11, 2017 · Apt 2R
Close - Door/window
Window frame
Jul 11, 2017 · Apt 2R
Close - Door/window
Door
Jul 11, 2017 · Apt 2R
Close - Paint/plaster
Wall
Jul 11, 2017 · Apt 2R
Close - Plumbing
Bathtub/shower
Jul 11, 2017 · Apt 2R
Close - General
Cabinet
Jul 11, 2017 · Apt 2R
Close - General
Bell/buzzer/intercom
Jul 12, 2016 · Apt 1R
Close - Water leak
Heavy flow
Jun 16, 2016 · Apt 2R
Close - Unsanitary condition
Pests
Jun 16, 2016 · Apt 2R
Close - Door/window
Window frame
Jun 16, 2016 · Apt 2R
Close - Electric
Wiring
Jun 16, 2016 · Apt 2R
Close - Unsanitary condition
Pests
Jun 16, 2016 · Apt 2R
Close - General
Bell/buzzer/intercom
Jun 16, 2016 · Apt 2R
Close - Unsanitary condition
Pests
Jun 16, 2016 · Apt 2R
Close - Unsanitary condition
Pests
Jun 16, 2016 · Apt 2R
Close - Unsanitary condition
Mold
Jun 16, 2016 · Apt 2R
Close - Unsanitary condition
Mold
Jun 14, 2016 · Apt 1R
Close - Unsanitary condition
Mold
Jun 14, 2016 · Apt 1R
Close - Electric
Wiring
Jun 13, 2016 · Apt 1R
Close - Safety
Carbon monoxide detector
Jan 13, 2016 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,875 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6B
- Community board
- 306
- Council district
- 38
- Block / lot
- 1034 / 47
- Assessed value
- $1,045,350
- Landmark / historic district
- No
HPD registration #315099, last renewed Aug 19, 2025.
Questions about 239 14 Street
Who owns 239 14 Street?
The owner of record in NYC Department of City Planning PLUTO data is 239 14th Street LLC.
Does 239 14 Street have violations?
Yes. NYC HPD has recorded 97 housing violations at this property.
Is 239 14 Street rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2024 (about 83% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 239 14 Street built?
City records list 1931 as the year it was built.
How many apartments are in 239 14 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.