236 51 Street
Brooklyn, NY 11220BBL 3-00797-0020Map
Owner of record: 236 51st Street, LLC
236 51 Street is a walk-up apartment building built in 1905 in Brooklyn, 11220. It has 6 residential units across 3 floors. The owner of record is 236 51st Street, LLC. HPD has recorded 102 housing violations here, most recently on August 26, 2025. 45 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 102
- DOB violations
- 2
- ECB violations
- 3
- HPD complaints
- 68
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 102
- BHazardous
Remove all obstructions and repair all defects in the waste pipes of the sink drainage, in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south
Aug 26, 2025 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Aug 26, 2025 · Apt 2L
Open — Notice of issuance sent to tenant - BHazardous
Remove all obstructions and repair all defects in waste pipes of the washbasin drainage, in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Aug 26, 2025 · Apt 2L
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the visible mold at caulking, grouts joints of the ceramic tiles at north and east walls around shower stall, in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Aug 26, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cauking at grouts joints of the ceramic tiles at west, north and east walls around shower stall base, in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Aug 26, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate at window to fire escape 1st from east at south, in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south
Aug 26, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electric outlets 1st from south at east, in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south
Aug 26, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electric outlets 1st from north at east, in the private hallway located at apt 2l, 2nd story, 1st apartment from east at south
Aug 26, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Aug 26, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Aug 26, 2025 · Apt 2L
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ,hinges, in the entrance located at apt 2l, 2nd story, 1st apartment from east at south
Aug 26, 2025 · Apt 2L
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of wood shelives, at public hall, 2nd story
Aug 26, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of wood furniture at public hall, 3rd story
Aug 26, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household articles at public hall stairs, 3rd story
Aug 26, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges , at the entrance to roof 1st from east at south, at 1st public hall bulkhead from east at south, 3rd story
Aug 26, 2025
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor, garbages presented, in the building front north sections , court
Aug 26, 2025
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at the building front north sections , fresh rats dropping presented. court
Aug 26, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of garbage bags and household articles, at public hall, 1st story
Aug 26, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2024
Closed — Violation dismissed - BHazardous
Properly secure the loose nosing at 3rd tread from bottom to top at public hall stairs, 1st story
Apr 13, 2024
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at north window frame (approx 2 sq ft) in the bathroom located at apt 2r, 2nd story, 2nd apartment from south at west original violation 16877839 issued 05-apr-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Apr 5, 2024 · Apt 2R
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at north window frame (approx 2 sq ft) in the bathroom located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 5, 2024 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant ceiling at public hall, 3rd story
Apr 5, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 5, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 5th room from east located at apt 1r, 1st story, 2nd apartment from south at west
Apr 5, 2024 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 6th room from east located at apt 1r, 1st story, 2nd apartment from south at west
Apr 5, 2024 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 6th room from east located at apt 1l, 1st story, 2nd apartment from south at west
Apr 5, 2024 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 5th room from east located at apt 1l, 1st story, 2nd apartment from south at west
Apr 5, 2024 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, east wall, west wall, 1st window frame from south at west wall in the 4th room from east located at apt 1l, 1st story, 2nd apartment from south at west
Apr 5, 2024 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, 1st window frame from north at east wall in the kitchen located at apt 1l, 1st story, 2nd apartment from south at west
Apr 5, 2024 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 1l, 1st story, 2nd apartment from south at west
Apr 5, 2024 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, west wall, 1st window frame from south at west wall in the kitchen located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 5, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, south wall in the bathroom located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 5, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from south at west wall, 1st window frame from south at west wall in the 4th room from east located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 5, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from south at west wall, north wall, south wall, east wall, west wall in the 3rd room from east located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 5, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, east wall in the 2nd room from east located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 5, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall, 2nd window frame from north at east wall, 1st window frame from north at east wall in the 1st room from east located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 5, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 1l, 1st story, 2nd apartment from south at west
Apr 5, 2024 · Apt 1L
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt 1l, 1st story, 1st apartment from south at west
Apr 5, 2024 · Apt 1L
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1l, 1st story, 1st apartment from south at west
Apr 5, 2024 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Apr 5, 2024 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1l, 1st story, 1st apartment from south at west
Apr 5, 2024 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ''hinges'' bulkhead door to roof
Apr 5, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story
Apr 5, 2024
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 1r, 1st story, 2nd apartment from south at west
Apr 5, 2024 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at public hall, 1st story
Apr 5, 2024
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 5, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 5, 2024 · Apt 2R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 2r, 2nd story, 2nd apartment from south at west
Apr 5, 2024 · Apt 2R
Open — Nov sent out
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 10, 2016
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active
ECB violations · 3
- Class - 2
Failure to comply w/the comm's order to file c of c w/the dob's for notice of vio #35112713y issued on 12/5/14 pursuant to 28-204.4 & 1rcny 102-01. for: illegal occupancy at cellar level. remedy: file a c of c.
Mar 16, 2015 · Penalty $800
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dob for notice of violation #35112713y issued on 12/05/2014 pursuant to 28-204.4 & 1rcny 102-01.rem:file a certificat
Jan 14, 2015 · Penalty $800
Resolve - Class - 1
Occupancy contrary to that allowed by the cofo bldg dept records and/or all applicable laws and regulations.illegal occupancy noted:partitions erected at celalr creating sro.sro has refrigerator,bed,microwave
Dec 5, 2014 · Penalty $2,400
Active
Complaints
- Paint/plaster
Ceiling
Aug 22, 2025 · Apt 3R
Close - Water leak
Slow leak
Aug 22, 2025 · Apt 3R
Close - Plumbing
Basin/sink
Aug 22, 2025 · Apt 2L
Close - Unsanitary condition
Pests
Aug 22, 2025 · Apt 2L
Close - Plumbing
Bathtub/shower
Aug 22, 2025 · Apt 2L
Close - Unsanitary condition
Pests
Aug 22, 2025 · Apt 2L
Close - Electric
Power outage
Jun 25, 2025 · Apt 1R
Close - Unsanitary condition
Pests
Feb 13, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Feb 13, 2024 · Apt 1R
Close - Heat/hot water
Entire building
Oct 22, 2023 · Apt BLDG
Close
Show 40 more ↓
- Paint/plaster
Ceiling
May 16, 2022 · Apt 1R
Close - Paint/plaster
Wall
Dec 18, 2017 · Apt 2L
Close - Paint/plaster
Wall
Dec 18, 2017 · Apt 2L
Close - Unsanitary condition
Mold
Dec 18, 2017 · Apt 2L
Close - Door/window
Window frame
Dec 18, 2017 · Apt 2L
Close - Unsanitary condition
Pests
Dec 18, 2017 · Apt 2L
Close - Electric
Lighting
Dec 18, 2017 · Apt 2L
Close - Door/window
Door
Dec 18, 2017 · Apt 2L
Close - Door/window
Door
Dec 18, 2017 · Apt 2L
Close - Heat/hot water
Entire building
Nov 1, 2014 · Apt 1R
Close - Door/window
Window frame
Oct 30, 2014 · Apt 2L
Close - Paint/plaster
Wall
Oct 30, 2014 · Apt 2L
Close - General
Mold
Jul 19, 2011 · Apt 2L
Close - Paint/plaster
Wall
Jul 19, 2011 · Apt 2L
Close - Paint/plaster
Wall
Jul 19, 2011 · Apt 2L
Close - General
Doors
Jul 19, 2011 · Apt 2L
Close - General
Windows
Jul 19, 2011 · Apt 2L
Close - General
Fire-escape
Nov 3, 2010 · Apt 3L
Close - General
Doors
Oct 1, 2010 · Apt 3L
Close - General
Locks
Oct 1, 2010 · Apt 3L
Close - General
Ceramic-tile
Oct 1, 2010 · Apt 3L
Close - General
Cabinet
Oct 1, 2010 · Apt 3L
Close - Paint/plaster
Wall
Oct 1, 2010 · Apt 3L
Close - General
Floor
Oct 1, 2010 · Apt 3L
Close - General
Floor
Oct 1, 2010 · Apt 3L
Close - General
Floor
Oct 1, 2010 · Apt 3L
Close - General
Doors
Oct 1, 2010 · Apt 3L
Close - General
Floor
Oct 1, 2010 · Apt 3L
Close - Paint/plaster
Wall
Oct 1, 2010 · Apt 3L
Close - Plumbing
Basin/sink
Oct 1, 2010 · Apt 3L
Close - Plumbing
Bathtub/shower
Oct 1, 2010 · Apt 3L
Close - Plumbing
Toilet
Oct 1, 2010 · Apt 3L
Close - General
Ceramic-tile
Oct 1, 2010 · Apt 3L
Close - Paint/plaster
Wall
Oct 1, 2010 · Apt 3L
Close - Paint/plaster
Wall
Oct 1, 2010 · Apt 3L
Close - Nonconst
Smoke detector
Oct 1, 2010 · Apt 3L
Close - Nonconst
Smoke detector
Sep 6, 2010 · Apt 3L
Close - General
Floor
Sep 6, 2010 · Apt 3L
Close - Paint/plaster
Wall
Sep 6, 2010 · Apt 3L
Close - General
Cabinet
Sep 6, 2010 · Apt 3L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1905
- Floors
- 3
- Residential units
- 6
- Building area
- 4,758 ft²
- Lot area
- 2,671 ft²
- Zoning
- M1-2D
- Community board
- 307
- Council district
- 38
- Block / lot
- 797 / 20
- Assessed value
- $489,600
- Landmark / historic district
- No
HPD registration #300110, last renewed Oct 8, 2025.
Questions about 236 51 Street
Who owns 236 51 Street?
The owner of record in NYC Department of City Planning PLUTO data is 236 51st Street, LLC.
Does 236 51 Street have violations?
Yes. NYC HPD has recorded 102 housing violations at this property.
Is 236 51 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 236 51 Street built?
City records list 1905 as the year it was built.
How many apartments are in 236 51 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.