roofy

236 51 Street

Brooklyn, NY 11220BBL 3-00797-0020Map

Owner of record: 236 51st Street, LLC

236 51 Street is a walk-up apartment building built in 1905 in Brooklyn, 11220. It has 6 residential units across 3 floors. The owner of record is 236 51st Street, LLC. HPD has recorded 102 housing violations here, most recently on August 26, 2025. 45 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.

HPD violations
102
DOB violations
2
ECB violations
3
HPD complaints
68

What to know

Concern
24 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Aug 26, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
6
About 100% of the building's 6 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 102

  • B

    Remove all obstructions and repair all defects in the waste pipes of the sink drainage, in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 26, 2025 · Apt 2L

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 26, 2025 · Apt 2L

    Open — Notice of issuance sent to tenant
  • B

    Remove all obstructions and repair all defects in waste pipes of the washbasin drainage, in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 26, 2025 · Apt 2L

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the visible mold at caulking, grouts joints of the ceramic tiles at north and east walls around shower stall, in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 26, 2025 · Apt 2L

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective cauking at grouts joints of the ceramic tiles at west, north and east walls around shower stall base, in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 26, 2025 · Apt 2L

    Open — Nov sent out
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate at window to fire escape 1st from east at south, in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 26, 2025 · Apt 2L

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electric outlets 1st from south at east, in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 26, 2025 · Apt 2L

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electric outlets 1st from north at east, in the private hallway located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 26, 2025 · Apt 2L

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 26, 2025 · Apt 2L

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 26, 2025 · Apt 2L

    Open — Nov sent out
Show 40 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective ,hinges, in the entrance located at apt 2l, 2nd story, 1st apartment from east at south

    Aug 26, 2025 · Apt 2L

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of wood shelives, at public hall, 2nd story

    Aug 26, 2025

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of wood furniture at public hall, 3rd story

    Aug 26, 2025

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household articles at public hall stairs, 3rd story

    Aug 26, 2025

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges , at the entrance to roof 1st from east at south, at 1st public hall bulkhead from east at south, 3rd story

    Aug 26, 2025

    Open — Nov sent out
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor, garbages presented, in the building front north sections , court

    Aug 26, 2025

    Open — Nov sent out
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at the building front north sections , fresh rats dropping presented. court

    Aug 26, 2025

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of garbage bags and household articles, at public hall, 1st story

    Aug 26, 2025

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 6, 2025

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 27, 2024

    Closed — Violation dismissed
  • B

    Properly secure the loose nosing at 3rd tread from bottom to top at public hall stairs, 1st story

    Apr 13, 2024

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... at north window frame (approx 2 sq ft) in the bathroom located at apt 2r, 2nd story, 2nd apartment from south at west original violation 16877839 issued 05-apr-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Apr 5, 2024 · Apt 2R

    Open — First no access to re- inspect violation
  • A

    Trace and repair the source and abate the visible mold condition... at north window frame (approx 2 sq ft) in the bathroom located at apt 2r, 2nd story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 2R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant ceiling at public hall, 3rd story

    Apr 5, 2024

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2r, 2nd story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 5th room from east located at apt 1r, 1st story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 1R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 6th room from east located at apt 1r, 1st story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 1R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 6th room from east located at apt 1l, 1st story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 1L

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 5th room from east located at apt 1l, 1st story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 1L

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, east wall, west wall, 1st window frame from south at west wall in the 4th room from east located at apt 1l, 1st story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 1L

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, 1st window frame from north at east wall in the kitchen located at apt 1l, 1st story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 1L

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 1l, 1st story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 1L

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, west wall, 1st window frame from south at west wall in the kitchen located at apt 2r, 2nd story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, south wall in the bathroom located at apt 2r, 2nd story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from south at west wall, 1st window frame from south at west wall in the 4th room from east located at apt 2r, 2nd story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from south at west wall, north wall, south wall, east wall, west wall in the 3rd room from east located at apt 2r, 2nd story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, east wall in the 2nd room from east located at apt 2r, 2nd story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall, 2nd window frame from north at east wall, 1st window frame from north at east wall in the 1st room from east located at apt 2r, 2nd story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 2R

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 1l, 1st story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 1L

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing located at apt 1l, 1st story, 1st apartment from south at west

    Apr 5, 2024 · Apt 1L

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 1l, 1st story, 1st apartment from south at west

    Apr 5, 2024 · Apt 1L

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west

    Apr 5, 2024 · Apt 1L

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1l, 1st story, 1st apartment from south at west

    Apr 5, 2024 · Apt 1L

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective ''hinges'' bulkhead door to roof

    Apr 5, 2024

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story

    Apr 5, 2024

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 1r, 1st story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 1R

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at public hall, 1st story

    Apr 5, 2024

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing located at apt 2r, 2nd story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 2R

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 2R

    Open — Notice of issuance sent to tenant
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 2r, 2nd story, 2nd apartment from south at west

    Apr 5, 2024 · Apt 2R

    Open — Nov sent out

DOB building violations · 2

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 10, 2016

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active

ECB violations · 3

  • Class - 2

    Failure to comply w/the comm's order to file c of c w/the dob's for notice of vio #35112713y issued on 12/5/14 pursuant to 28-204.4 & 1rcny 102-01. for: illegal occupancy at cellar level. remedy: file a c of c.

    Mar 16, 2015 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the dob for notice of violation #35112713y issued on 12/05/2014 pursuant to 28-204.4 & 1rcny 102-01.rem:file a certificat

    Jan 14, 2015 · Penalty $800

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by the cofo bldg dept records and/or all applicable laws and regulations.illegal occupancy noted:partitions erected at celalr creating sro.sro has refrigerator,bed,microwave

    Dec 5, 2014 · Penalty $2,400

    Active

Complaints

  • Paint/plaster

    Ceiling

    Aug 22, 2025 · Apt 3R

    Close
  • Water leak

    Slow leak

    Aug 22, 2025 · Apt 3R

    Close
  • Plumbing

    Basin/sink

    Aug 22, 2025 · Apt 2L

    Close
  • Unsanitary condition

    Pests

    Aug 22, 2025 · Apt 2L

    Close
  • Plumbing

    Bathtub/shower

    Aug 22, 2025 · Apt 2L

    Close
  • Unsanitary condition

    Pests

    Aug 22, 2025 · Apt 2L

    Close
  • Electric

    Power outage

    Jun 25, 2025 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Feb 13, 2024 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Feb 13, 2024 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Oct 22, 2023 · Apt BLDG

    Close
Show 40 more ↓
  • Paint/plaster

    Ceiling

    May 16, 2022 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Dec 18, 2017 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Dec 18, 2017 · Apt 2L

    Close
  • Unsanitary condition

    Mold

    Dec 18, 2017 · Apt 2L

    Close
  • Door/window

    Window frame

    Dec 18, 2017 · Apt 2L

    Close
  • Unsanitary condition

    Pests

    Dec 18, 2017 · Apt 2L

    Close
  • Electric

    Lighting

    Dec 18, 2017 · Apt 2L

    Close
  • Door/window

    Door

    Dec 18, 2017 · Apt 2L

    Close
  • Door/window

    Door

    Dec 18, 2017 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Nov 1, 2014 · Apt 1R

    Close
  • Door/window

    Window frame

    Oct 30, 2014 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Oct 30, 2014 · Apt 2L

    Close
  • General

    Mold

    Jul 19, 2011 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Jul 19, 2011 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Jul 19, 2011 · Apt 2L

    Close
  • General

    Doors

    Jul 19, 2011 · Apt 2L

    Close
  • General

    Windows

    Jul 19, 2011 · Apt 2L

    Close
  • General

    Fire-escape

    Nov 3, 2010 · Apt 3L

    Close
  • General

    Doors

    Oct 1, 2010 · Apt 3L

    Close
  • General

    Locks

    Oct 1, 2010 · Apt 3L

    Close
  • General

    Ceramic-tile

    Oct 1, 2010 · Apt 3L

    Close
  • General

    Cabinet

    Oct 1, 2010 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Oct 1, 2010 · Apt 3L

    Close
  • General

    Floor

    Oct 1, 2010 · Apt 3L

    Close
  • General

    Floor

    Oct 1, 2010 · Apt 3L

    Close
  • General

    Floor

    Oct 1, 2010 · Apt 3L

    Close
  • General

    Doors

    Oct 1, 2010 · Apt 3L

    Close
  • General

    Floor

    Oct 1, 2010 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Oct 1, 2010 · Apt 3L

    Close
  • Plumbing

    Basin/sink

    Oct 1, 2010 · Apt 3L

    Close
  • Plumbing

    Bathtub/shower

    Oct 1, 2010 · Apt 3L

    Close
  • Plumbing

    Toilet

    Oct 1, 2010 · Apt 3L

    Close
  • General

    Ceramic-tile

    Oct 1, 2010 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Oct 1, 2010 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Oct 1, 2010 · Apt 3L

    Close
  • Nonconst

    Smoke detector

    Oct 1, 2010 · Apt 3L

    Close
  • Nonconst

    Smoke detector

    Sep 6, 2010 · Apt 3L

    Close
  • General

    Floor

    Sep 6, 2010 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Sep 6, 2010 · Apt 3L

    Close
  • General

    Cabinet

    Sep 6, 2010 · Apt 3L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1905
Floors
3
Residential units
6
Building area
4,758 ft²
Lot area
2,671 ft²
Zoning
M1-2D
Community board
307
Council district
38
Block / lot
797 / 20
Assessed value
$489,600
Landmark / historic district
No

HPD registration #300110, last renewed Oct 8, 2025.

Questions about 236 51 Street

Who owns 236 51 Street?

The owner of record in NYC Department of City Planning PLUTO data is 236 51st Street, LLC.

Does 236 51 Street have violations?

Yes. NYC HPD has recorded 102 housing violations at this property.

Is 236 51 Street rent stabilized?

NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 236 51 Street built?

City records list 1905 as the year it was built.

How many apartments are in 236 51 Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.