126 4 Avenue
Brooklyn, NY 11217BBL 3-00407-0026Map
Owner of record: Em-Ess Petroleum Corp
126 4 Avenue is an elevator apartment building built in 2006 in Brooklyn, 11217. It has 56 residential units across 8 floors. The owner of record is Em-Ess Petroleum Corp. HPD has recorded 1 housing violation here, most recently on March 30, 2023. City tax records listed 51 rent-stabilized apartments here in 2024.
- HPD violations
- 1
- DOB violations
- 12
- ECB violations
- 14
- HPD complaints
- 6
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 30, 2023
Closed — Violation dismissed
DOB building violations · 12
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 13, 2019
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2010
Dob violation - resolved - Construction other optional
C-construction other optional
Apr 9, 2008
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 5, 2007
Dob violation - dismissed - Construction other optional
Work without a permit-in that installed a supported scaffold to a heig ht that is 40'or more above grade/working surface at north facing side of new bldg,workers on scaffold was 30' above grade at time of inspect approx 30% of work completed,no c of c provided. remedy:stop all work on scaffold,obtain permit or remove scaffold,call dob prior to work
May 12, 2007
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Apr 28, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
May 26, 2006
Dob violation - dismissed
Show 2 more ↓
- Construction other optional
C-construction other optional
Mar 11, 2004
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 21, 1995
Vp-violation unserved ecb-active
ECB violations · 14
- Class - 2
Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #914165. remedy: submit acceptable requ
Apr 11, 2024 · Penalty $1,250
Active - Class - 2
45m7,57b7,78b14-45m7)governor missing seal. 57b7)machine room fire extinguisher not tagged. 78b14)perform shorten on governor tension weight
Dec 5, 2017
Resolve - Class - 1
Failure to provide unobstructed exit passageway in that a marked exit door leading from parking garage to street does not open,preventing egress. remedy: remove obstruction immediatly.
Feb 4, 2016
Resolve - Hazardous
No elevator in readiness prior viol written on 5/4/07 upon insp bldg roof work has continued above 75' brick work & pipe scaffolding on set back and brick layers working power washing on scaffolding at 9th fl
Jun 5, 2007 · Penalty $2,500
Resolve - Hazardous
No elevator in readiness.upon insp-10 story bldg completed to roof no exterior hoist,no interior elevator.no elevator in readiness bldg height 120ft,floors 12ft 1fl 10'plus"addition fl height,no elevation in re
May 4, 2007 · Penalty $1,000
Resolve - Non-hazardous
Sec 26-252:failure to obtain a permit-standpipe system. upon inspection standpipe system installed 1-10fl w/o first obtaining a standpipe sytem. remedy: obtain a standpipe permit as per bldg code.
May 4, 2007 · Penalty $400
Resolve - Non-hazardous
Failure to provide permit for scaffolds.upon insp at above property scaffolds were erected to 8floor & dob records shows no permit for scaffolds has been issued.remedy:stop all work from scaffolds.obtain permit
Apr 28, 2007 · Penalty $500
Resolve - Non-hazardous
Sec.27-1015.no design drawing for scaffold upon insp.noted:there are pipe scaffold installed to 8 floor & no design drawing has been provided.remedy:obtain design drawing from an architect or engineer.
Apr 28, 2007 · Penalty $400
Resolve - Non-hazardous
Expired permit/sidewalk shed.upon insp noted:sidewalk shed installed along 4 ave & baltic st & permit #302039167 was expired on 12/31/06.dob records shows no shed permit has been received.remedy:renew shed perm
Apr 28, 2007 · Penalty $200
Resolve - Non-hazardous
Failure to provide appoved plans at time of inspection.noted underpinning ongoing under permit #301515466 w/o approved plans at site.remedy:stop all work obtain & keep approved plans at site.call dob at 7188023
Jan 27, 2006 · Penalty $250
Resolve
Show 4 more ↓
- Hazardous
Failure to provide protection at sides of excavaton. job# 301515466 noted: north, east locations have no protection at sides of excavated area that exceed 10' in depth, creating a unsafe condition for workers &
Jan 27, 2006 · Penalty $1,000
Resolve - Hazardous
Failure to safeguard public & property affected by constr. operations permit #301515466. noted: no protection has been provided for residents at 138 4 ave & at 596 baltic in that their rear yard is open to exca
Jan 27, 2006
Resolve - Hazardous
Failure to file tr1 prior to start of controlled work.permit #301515466.noted:(1)under pinning has been completed at west side for bldg 596 baltic(2)foundation of bldg 138 4 ave in process of being under pinned
Jan 27, 2006 · Penalty $350
Resolve - Hazardous
No permit for fence:upon inspection of above premises an 8' high has been erected and d.o.b. records indicates no permit was issued.remedy:obtain permit for fence.
Feb 22, 2001 · Penalty $2,500
Resolve
Complaints
- Safety
Window guard broken/missing
Aug 15, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 1, 2026 · Apt 8G
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt 8G
Close - Water leak
Slow leak
Jan 10, 2024 · Apt 8G
Close - Unsanitary condition
Mold
Jan 27, 2023 · Apt 3B
Close - Heat/hot water
Apartment only
Nov 26, 2016 · Apt 2E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2006
- Floors
- 8
- Residential units
- 56
- Building area
- 62,292 ft²
- Lot area
- 9,340 ft²
- Zoning
- C4-4D
- Community board
- 306
- Council district
- 39
- Block / lot
- 407 / 26
- Assessed value
- $6,586,650
- Landmark / historic district
- No
HPD registration #381560, last renewed Jul 14, 2026.
Questions about 126 4 Avenue
Who owns 126 4 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Em-Ess Petroleum Corp.
Does 126 4 Avenue have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 126 4 Avenue rent stabilized?
NYC Department of Finance tax bills listed 51 rent-stabilized units here in 2024 (about 91% of its 56 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 126 4 Avenue built?
City records list 2006 as the year it was built.
How many apartments are in 126 4 Avenue?
It has 56 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.