577 Baltic Street
Brooklyn, NY 11217BBL 3-00401-0062Map
Owner of record: 577 Baltic St LLC
577 Baltic Street is an elevator apartment building built in 2015 in Brooklyn, 11217. It has 27 residential units across 7 floors. The owner of record is 577 Baltic St LLC. HPD has recorded 20 housing violations here, most recently on October 10, 2026. 6 of the 20 most recent violations are still open. City tax records listed 27 rent-stabilized apartments here in 2024.
- HPD violations
- 20
- DOB violations
- 4
- ECB violations
- 15
- HPD complaints
- 21
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 20
- BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 2nd room from north at east located at apt 5b, 5th story, 2nd apartment from east at south
Oct 10, 2026 · Apt 5B
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at east wall in the 2nd room from north at east located at apt 5b, 5th story, 2nd apartment from east at south
Oct 10, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north at east located at apt 5b, 5th story, 2nd apartment from east at south
Oct 10, 2026 · Apt 5B
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 5b, 5th story, 2nd apartment from east at south
Oct 10, 2026 · Apt 5B
Open — Civ14 mailed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 5a, 5th story, 3rd apartment from east at south
Jan 25, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Properly secure the loose railing in the terrace located at apt 7b, 7th story, 1st apartment from east at south
May 6, 2024 · Apt 7B
Closed — Violation dismissed - CImmediately hazardous
Properly secure the loose glass rail in the terrace located at apt 7b, 7th story, 1st apartment from east at south
Apr 7, 2024 · Apt 7B
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 2 sq ft at floor in the 2nd room from east at south located at apt 7b, 7th story, 1st apartment from east at south original violation 16823898 issued 07-apr-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Apr 7, 2024 · Apt 7B
Closed — Violation dismissed
Show 10 more ↓
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 2 sq ft at floor in the 2nd room from east at south located at apt 7b, 7th story, 1st apartment from east at south
Apr 7, 2024 · Apt 7B
Closed — Violation closed - BHazardous
Remove the illegal fastening consisting of electromagnetic lock installed at building entrance door , 1st story
Aug 25, 2022
Closed — Violation dismissed - BHazardous
Provide security in the event of power outage by means of an acceptable mechanical heavy duty lock and latch set at building entrance door , 1st story
Aug 25, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east at south located at apt 7b, 7th story, 1st apartment from east at south
Aug 25, 2022 · Apt 7B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective firedoor at east at public hall, 1st story
Aug 25, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 10, 2022
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective cold radiator in the 1st room from north at east located at apt 3d, 3rd story, 1st apartment from west at north
Feb 25, 2022 · Apt 3D
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 11, 2017
Closed — Violation dismissed
DOB building violations · 4
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2020
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 24, 2016
Dob violation - dismissed
ECB violations · 15
- Class - 2
Wrk doesnt conform to approved construction documents and/or approved amendments.nb-job#320627808 on an energy compliance inspection i observed exterior mass wall(front wall)with aluminum panels was installed w
Dec 29, 2016 · Penalty $500
Resolve - Class - 1
No guardrails responding to incident #22517 @time of inspection observed missing guardrails @bulkhead roof exp #3,balconies @ exp#1 roof exp #1 @garbage chute @ 7th flr &garbage chute @roof creating a hazard
Sep 14, 2016 · Penalty $1,200
Resolve - Class - 1
Egress/exit passageway responding to incident #22517 @time of inspection observed exit passageways @ 1st,2nd,3rd&4th fl.hallway to stair cases didn't maintain clearance &has materials stored creating trip hazar
Sep 14, 2016 · Penalty $1,200
Resolve - Class - 1
Housekeeping responding to incident #22517 @time of inspection observed rubbish consisting of wood,sheet rock,cardboard &various other materials diced through out.stop all work expect to correct violating condi
Sep 14, 2016 · Penalty $400
Resolve - Class - 1
Failure to safeguard.responding to incident #22517 observed doors to balconies unlocked &open w.no guard rail system in place creating a dangerous (fare)condition to public open balcony door @exp#1&exp#3 stop a
Sep 14, 2016 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard temp electric responding to incident #22517.@timeof inspection observed failure to safe guard temporary electric from improper contact,no protective covers observed on light bulbs @various
Sep 14, 2016 · Penalty $2,400
Resolve - Class - 1
Work after hours w/out variance. permit contrary to 28-105.12. note: @ time of insp of a 7 story bldg @ bulkhead level, constr work in progress. upon review of dept records i observed that there were no after h
Jun 4, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to institute/maintain safety equipment measures. vertical safety netting/guardrails. note: @ time of insp of a 7 story bldg @ bulkhead level, constr work in progress. i observed that vertical safety net
Jun 4, 2016 · Penalty $2,400
Resolve - Class - 1
Failure to institute/ maintain safety equipment measures ot temporary construction- no toe boards. note: @ time of insp of a 7 story bldg @ bulkhead level, constr work in progress. i observed that there were no
Jun 4, 2016 · Penalty $1,000
Resolve - Class - 1
Erected, dismantled, repaired, maintained, modified or removed scaffold w/out a scaffold certification. note: @ time of insp of a 7 story bldg @ bulk head level, constr work in progress. i observed supported pi
Jun 4, 2016 · Penalty $2,400
Resolve
Show 5 more ↓
- Class - 1
Sec: bc3314.4.4.5. dislodgement. note: @ time of insp of a 7 story bldg @ bulkhead level, constr work in progress. i observed supported pipe scaffold @ exp#1&4 was consume w/ debris of loose bricks, buckets, pl
Jun 4, 2016 · Penalty $1,600
Resolve - Class - 1
Sec: bc3303.4. housekeeping. note: @ time of insp of a 7 story bldg @ biulkhead level, constr work in progress. i observed debris & materialthat consist of metal & q deck being store on perimeter edge of balcon
Jun 4, 2016 · Penalty $1,600
Resolve - Class - 1
Sec: bc3301.1.1. responsibility for safety. note: @ time of insp of a 7 story bldg @ bulkhead level, constr work in progress. i observed that there were no (caz) control access zone or overhead protection provi
Jun 4, 2016 · Penalty $1,600
Resolve - Class - 1
1rcny48 failure to adequately supervise work @a construction site,so as to maintain a safe construction site&ensure compliance w.approved construction documents &chapter33(safeguard during construction demoliti
Jun 4, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons & property affected by constr operations. note: @ time of insp of a 7 story bldg @ bulkhead level, constr work in progress. i observed worker @ perimeter edge on roof level appr
Jun 4, 2016 · Penalty $10,000
Resolve
Complaints
- Water leak
Damp spot
Oct 5, 2026 · Apt 5B
Close - Unsanitary condition
Mold
Oct 5, 2026 · Apt 5B
Close - Flooring/stairs
Floor
Oct 5, 2026 · Apt 5B
Close - Flooring/stairs
Floor
Jun 15, 2026 · Apt 5E
Close - General
Cabinet
Apr 23, 2026 · Apt 7A
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt 3E
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 20, 2026 · Apt 2D
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt 5B
Close
Show 11 more ↓
- Heat/hot water
Apartment only
Dec 15, 2025 · Apt 5C
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 5E
Close - Heat/hot water
Apartment only
Jan 21, 2025 · Apt 5E
Close - Safety
Window guard broken/missing
May 1, 2024 · Apt 7B
Close - Unsanitary condition
Mold
May 1, 2024 · Apt 7B
Close - Unsanitary condition
Mold
Mar 31, 2024 · Apt 7B
Close - Safety
Window guard broken/missing
Mar 31, 2024 · Apt 7B
Close - Heat/hot water
Apartment only
Dec 20, 2023 · Apt 2B
Close - Flooring/stairs
Floor
Aug 20, 2022 · Apt 7B
Close - Heat/hot water
Apartment only
Feb 23, 2022 · Apt 3D
Close - Unsanitary condition
Mold
Aug 31, 2018 · Apt 6E
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Dec 17, 2025 | $14,000,000 | Rentals - elevator apartments | 28 |
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2015
- Floors
- 7
- Residential units
- 27
- Building area
- 18,820 ft²
- Lot area
- 6,333 ft²
- Zoning
- R7B
- Community board
- 306
- Council district
- 39
- Block / lot
- 401 / 62
- Assessed value
- $2,358,450
- Landmark / historic district
- No
HPD registration #387561, last renewed Jan 21, 2026.
Questions about 577 Baltic Street
Who owns 577 Baltic Street?
The owner of record in NYC Department of City Planning PLUTO data is 577 Baltic St LLC.
Does 577 Baltic Street have violations?
Yes. NYC HPD has recorded 20 housing violations at this property.
Is 577 Baltic Street rent stabilized?
NYC Department of Finance tax bills listed 27 rent-stabilized units here in 2024 (about 100% of its 27 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 577 Baltic Street built?
City records list 2015 as the year it was built.
How many apartments are in 577 Baltic Street?
It has 27 residential units and 28 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.