240 President Street
Brooklyn, NY 11231BBL 3-00351-0013Map
Owner of record: Brooklyn 637-240 LLC
240 President Street is a walk-up apartment building built in 1920 in Brooklyn, 11231. It has 8 residential units across 4 floors. The owner of record is Brooklyn 637-240 LLC. HPD has recorded 25 housing violations here, most recently on March 1, 2022. 4 of the 25 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 25
- DOB violations
- 13
- ECB violations
- 4
- HPD complaints
- 54
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 25
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 1, 2022
Closed — Violation dismissed - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling in the bathroom located at apt 1r, 1st story
Jun 5, 2004 · Apt 1R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall ( behind w/c ) in the bathroom located at apt 1r, 1st story
Jun 5, 2004 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at walls around bathtub in the bathroom located at apt 1r, 1st story
Jun 5, 2004 · Apt 1R
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 200 watts at front areaway
Dec 4, 2000
Closed — Violation closed - BHazardous
Provide hot water at all hot water fixtures 3 sty west apt 3r located at apt 3r
Nov 14, 1996 · Apt 3R
Closed — Violation dismissed - BHazardous
Provide hot water at all hot water fixtures 3 sty east apt 3l located at apt 3l
Nov 14, 1996 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system 1 sty public hall
Nov 14, 1996
Open — False certification - CImmediately hazardous
Provide ready access to buildings heating system cellar door locked
Nov 14, 1996
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective rotted wood frame entrance door 1 sty southwest apt 1r , section '' ''
Oct 1, 1996 · Apt 1R
Closed — Violation dismissed
Show 15 more ↓
- BHazardous
Properly repair with similar material the broken or defective sheetrock south wall bathroom 1 sty southwest apt 1r , section '' ''
Oct 1, 1996 · Apt 1R
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective ceiling light fixture 1 room from north 1 sty southwest apt 1r , section '' ''
Oct 1, 1996 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mechanical balance lower sash north room 1 sty southwest apt 1r , section '' ''
Oct 1, 1996 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing unit 1 sty southwest apt 1r bellido. , section '' ''
Oct 1, 1996 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling kitchen 1 sty east apt 1l , section '' ''
Oct 13, 1994 · Apt 1L
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection wastepipe under sink kitchen 1 sty east apt 1l. , section '' ''
Oct 13, 1994 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings thru out 1 sty east apt 1l. , section '' ''
Oct 13, 1994 · Apt 1L
Open — Nov sent out - BHazardous
Replace with new the broken or defective rotted metal sink cabinets kitchen 1 sty east apt 1l. , section '' ''
Oct 13, 1994 · Apt 1L
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing battery 1 sty east apt 1l marino , section '' ''
Oct 13, 1994 · Apt 1L
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective ceiling light fixture bathroom 1 sty east apt 1l. , section '' ''
Oct 13, 1994 · Apt 1L
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors entrance rear 1 sty east apt 1l. , section '' ''
Oct 13, 1994 · Apt 1L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceilings thru out 1 sty south apt 1l. , section '' ''
Sep 15, 1993 · Apt 1L
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of water stain & moisture ceiling bathroom 2 sty apt 2left. , section '' ''
Feb 3, 1993 · Apt 2LEFT.
Open — False certification - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color loose plasterboard ceiling kitchen 3 sty east apt 3l er1. , section '' ''
Aug 24, 1992 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor kitchen 3 sty east apt 3l er1. , section '' ''
Aug 24, 1992 · Apt 3L
Closed — Violation closed
DOB building violations · 13
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Construction other optional
Work without a permit. work noted: both fixtures removed; electrical circuit breaker box installed as well as cables. stop all work. work is being done in 4th floor east side apartment remedy: stop all work. make site safe; obtain all necessary permits & approvals from dob office before returning to work at 718-802-3685
Jul 2, 1999
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
Show 3 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 4
- Class - 2
Failure to signed off permitted job as required by department of building(dob). dob record show that work under job #340172994 and #321053042 not signed off.28-116.4; 28-116.4, comply with code
Apr 1, 2024 · Penalty $1,250
Active - Class - 1
Unlawfully continued to work while on notice of a stop work order: atosi observed apt. on 4th fl. rear right work that was stop on 07/02/1999 for removal of bathroom plumbing fixtures and electrical work is now
Jul 5, 2023
Resolve - Class - 2
47 feeder blowdown corroded-gas meter area ventilation louver is missing-sewer pit cover is defective-debris in cellar making access difficult; correct violations and submit the certificate of correction
Aug 16, 2019 · Penalty $625
Active - Non-hazardous
Work without apermit. work noted bath fixtures removed. electrical circut braker box installed as well as by cables. stop all work that is being done in forth floor west side apartment. stop all work, make saf
Jul 2, 1999 · Penalty $500
Resolve
Complaints
- Electric
Power outage
Jan 10, 2026 · Apt 1R
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt 4L
Close - Heat/hot water
Entire building
Nov 2, 2021 · Apt 4L
Close - Heat/hot water
Entire building
Nov 1, 2021 · Apt 4L
Close - Heat/hot water
Entire building
Oct 28, 2021 · Apt 4L
Close - Heat/hot water
Entire building
Dec 19, 2020 · Apt 2L
Close - Heat/hot water
Entire building
Oct 30, 2020 · Apt 4L
Close - General
Signage missing
Dec 9, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 5, 2019 · Apt 2L
Close - Heat/hot water
Entire building
Apr 30, 2019 · Apt 4L
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Nov 28, 2016 · Apt 4R
Close - Heat/hot water
Entire building
Jan 8, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2016 · Apt 4R
Close - Heat/hot water
Entire building
Jan 5, 2016 · Apt 4R
Close - Heating
Heat related
Jan 8, 2014 · Apt 4L
Close - Heating
Heat related
Jan 7, 2014 · Apt 2L
Close - Heating
Heat related
Jan 7, 2014 · Apt NA
Close - Heating
Heat related
Nov 28, 2013 · Apt 4R
Close - General
Doors
Dec 27, 2010 · Apt 1L
Close - Heating
Heat related
Oct 20, 2009 · Apt 1L
Close - General
Doors
Dec 15, 2008 · Apt 1L
Close - Heating
Heat related
Nov 21, 2008 · Apt BLDG
Close - Heating
Heat related
Nov 20, 2008 · Apt BLDG
Close - Heating
Heat related
Nov 20, 2008 · Apt 4L
Close - Plumbing
Radiator
Feb 8, 2006 · Apt 2L
Close - Heating
Heat related
Feb 8, 2006 · Apt 2L
Close - Appliance
Refrigerator
Feb 6, 2006 · Apt 1L
Close - Heating
Heat related
Feb 6, 2006 · Apt 1L
Close - Paint/plaster
Ceiling
Feb 6, 2006 · Apt 1L
Close - Paint/plaster
Ceiling
Feb 6, 2006 · Apt 1L
Close - Electric
Wiring
Feb 6, 2006 · Apt 1L
Close - Electric
Electric-supply
Nov 26, 2005 · Apt 1R
Close - General
Windows
Nov 26, 2005 · Apt 1R
Close - General
Floor
Nov 26, 2005 · Apt 1R
Close - General
Floor
Nov 26, 2005 · Apt 1R
Close - General
Floor
Nov 26, 2005 · Apt 1R
Close - General
Floor
Nov 26, 2005 · Apt 1R
Close - General
Floor
Nov 26, 2005 · Apt 1R
Close - General
Floor
Nov 26, 2005 · Apt 1R
Close - General
Floor
Nov 26, 2005 · Apt 1R
Close - Heating
Heat related
Nov 21, 2005 · Apt 1R
Close - Plumbing
Sewer
Nov 21, 2005 · Apt 1R
Close - Electric
Wiring
Nov 21, 2005 · Apt 1R
Close - Electric
Wiring
Nov 21, 2005 · Apt 1R
Close - Plumbing
Bathtub/shower
Nov 21, 2005 · Apt 1R
Close - Plumbing
Radiator
Nov 21, 2005 · Apt 1R
Close - Paint/plaster
Wall
Nov 21, 2005 · Apt 1R
Close - General
Floor
Nov 21, 2005 · Apt 1R
Close - Electric
Lighting
May 29, 2004 · Apt 1R
Close - Appliance
Electric/gas range
May 17, 2004 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 4
- Residential units
- 8
- Building area
- 6,584 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6A
- Community board
- 306
- Council district
- 39
- Block / lot
- 351 / 13
- Assessed value
- $1,812,600
- Landmark / historic district
- No
HPD registration #339419, last renewed Sep 9, 2025.
Questions about 240 President Street
Who owns 240 President Street?
The owner of record in NYC Department of City Planning PLUTO data is Brooklyn 637-240 LLC.
Does 240 President Street have violations?
Yes. NYC HPD has recorded 25 housing violations at this property.
Is 240 President Street rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 25% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 240 President Street built?
City records list 1920 as the year it was built.
How many apartments are in 240 President Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.