151 Baltic Street
Brooklyn, NY 11201BBL 3-00305-0034Map
Owner of record: 151 Baltic St, LLC
151 Baltic Street is a walk-up apartment building built in 1888 in Brooklyn, 11201. It has 8 residential units across 4 floors. The owner of record is 151 Baltic St, LLC. HPD has recorded 170 housing violations here, most recently on May 10, 2026. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 170
- DOB violations
- 14
- ECB violations
- 15
- HPD complaints
- 103
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 170
- BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at building entrance , 1st story
May 10, 2026
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective masonry stucco at south exterior wall at 1st story
May 10, 2026
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye at building entrance door , 1st story
May 10, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
May 10, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective counter balance at upper sash 2nd window from north at east wall in the 4th room from north located at apt 3r, 3rd story, 1st apartment from north at east
Mar 25, 2026 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balance at upper sash 1st window from north at east wall in the 1st room from north located at apt 3r, 3rd story, 1st apartment from north at east
Mar 25, 2026 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding allowable maximum temperature of 130 degrees at all the hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Mar 25, 2026 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Jun 17, 2025 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Jun 17, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4r, 4th story, 1st apartment from north at east
Jun 17, 2025 · Apt 4R
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story
Jun 17, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Jun 17, 2025 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door lock at 1st boiler room from north
Jun 16, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east
Jun 16, 2025 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Jun 15, 2025 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Jun 15, 2025 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
Jun 15, 2025 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lower window sash counter balances at 2nd window from north at east in the 2nd room from north located at apt 4r, 4th story, 1st apartment from north at east
May 27, 2025 · Apt 4R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to south court located at apt 2l, 1st apartment from south at west
May 27, 2025 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective caulk around the bath tub in the bathroom located at apt 4r, 4th story, 1st apartment from north at east
May 27, 2025 · Apt 4R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling in the 5th room from north located at apt 4r, 4th story, 1st apartment from north at east
May 27, 2025 · Apt 4R
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective upper and lower counter balances at 1st window from east at south in the 5th room from north located at apt 4r, 4th story, 1st apartment from north at east
May 27, 2025 · Apt 4R
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective upper and lower counter balances at 2nd window from east at south in the 5th room from north located at apt 4r, 4th story, 1st apartment from north at east
May 27, 2025 · Apt 4R
Closed — Violation dismissed - BHazardous
Refit the upper and lower window sashes at 1st window from north at east in the 2nd room from north located at apt 4r, 4th story, 1st apartment from north at east
May 27, 2025 · Apt 4R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 4r, 4th story, 1st apartment from north at east
May 27, 2025 · Apt 4R
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective inoperable intercom system at vestibule entrance to west wall in the foyer located at apt 3r, 3rd story, 1st apartment from north at east
Mar 22, 2025 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective glass pane at lower sash window at north wall in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east
Mar 22, 2025 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective counter balance at 1st lower sash window from north at east wall in the 2nd room from north located at apt 3r, 3rd story, 1st apartment from north at east
Mar 22, 2025 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical switch at east wall at closet in the 2nd room from north located at apt 3r, 3rd story, 1st apartment from north at east
Mar 22, 2025 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective counter balance at 1st lower sash window from east at south wall in the 5th room from north located at apt 3r, 3rd story, 1st apartment from north at east
Mar 22, 2025 · Apt 3R
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 31, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective inoperative intercom system from vestibule to panel at west wall in the entrance located at apt 4r, 4th story, 1st apartment from north at east
Oct 31, 2024 · Apt 4R
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Oct 31, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 31, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Oct 31, 2024
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Oct 31, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 31, 2024
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 31, 2024
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 3r, 3rd story, 1st apartment from north at east
Oct 9, 2024 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective window counter balance upper and lower sash at east wall in the 2nd room from north located at apt 4r , 4th story, 1st apartment from north at east
Oct 9, 2024 · Apt 4R
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft st north wall in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
Oct 9, 2024 · Apt 3R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the closet in the 5th room from north located at apt 3r, 3rd story, 1st apartment from north at east
Oct 9, 2024 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 4r , 4th story, 1st apartment from north at east
Oct 9, 2024 · Apt 4R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 4r , 4th story, 1st apartment from north at east
Oct 9, 2024 · Apt 4R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 5th room from north located at apt 3r, 3rd story, 1st apartment from north at east
Oct 9, 2024 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical light switch at north wall in the 4th room from north located at apt 3r, 3rd story, 1st apartment from north at east
Oct 9, 2024 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 3r, 3rd story, 1st apartment from north at east
Oct 9, 2024 · Apt 3R
Closed — Violation closed - ANon-hazardous
Replace with new the missing missing escutcheon plate at top of riser in the 3rd room from north located at apt 3r, 3rd story, 1st apartment from north at east
Oct 9, 2024 · Apt 3R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 3r, 3rd story, 1st apartment from north at east
Oct 9, 2024 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 3r, 3rd story, 1st apartment from north at east
Oct 9, 2024 · Apt 3R
Closed — Violation closed
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Landmark none
Landmrk-landmark none
Jan 28, 1991
Dob violation - dismissed - Landmark none
Landmk-landmark none
Jan 28, 1991
Dob violation - active
ECB violations · 15
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39128817k as of 12/10/25., file a certificate o
Dec 10, 2025 · Penalty $1,250
Active - Class - 1
Atoi observed tpp states dust producing operations shall be controlled by negative air vacs or wetting down in approved construction areas. observed no negative air vacs in common areas and excessive dust on st
Oct 29, 2024 · Penalty $10,000
Active - Class - 1
Failure to safeguard all persons and property affected by construction operations. fire escape drop ladder obstructed by new rear deck, eliminating secondary egress of occupied multiple dwelling., safeguard pub
Sep 17, 2024 · Penalty $10,000
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments. work contrary to the approved plans : plans call for two sets of stairs from wood deck to allow rear yard access., conform wo
Sep 17, 2024 · Penalty $1,250
Resolve - Class - 1
Observed fire escape drop ladder has not beenshorten to accommodate egress. the deck is made of wood where tpp indicates steel decking, and there is no path to escape the wood deck; 3303.1, comply with code
Sep 17, 2024
Resolve - Class - 1
Observed inadequate tpp. tpp fails to address drop ladder being obstructed by rear deck and does not account for the wood deck on site. there is no phasing describing how egress will be maintained throughout th
Sep 17, 2024 · Penalty $2,500
Resolve - Class - 1
I observed dust producing operations shall be controlled by negative air vacs or wetting down in approved construction areas. not maintained. excessive dust& construction debris and materials throughout public
Sep 13, 2024 · Penalty $2,500
Resolve - Class - 1
Unapproved/unsafe/unsuitable electrical equipment, apparatus, materials, devices, appliances or wiring in use. note:at time of inspection observed unsuitable, electrical conditions creating a potential electric
Sep 13, 2024 · Penalty $1,600
Resolve - Class - 1
At time of inspection excessive amounts of debris in rear yard and steps leading to cellar. failure to maintain housekeeping., maintain adequate construction housekeeping
Sep 3, 2024 · Penalty $2,500
Resolve - Class - 1
Observed excessive dust in hallways. hepa vacuums not properly installed missing hose. located throughout common area. failure to comply with ttp.; 3303.10, comply with code
Sep 3, 2024 · Penalty $5,000
Resolve
Show 5 more ↓
- Class - 1
At time of inspection observed no fall protection. located at the back of both rear first floor apartments, leading to rear yard. about a 6ft drop in to yard. potential fall hazards., safeguard public and prope
Sep 3, 2024 · Penalty $10,000
Resolve - Class - 1
I observed the kitchen window in apartment 3r defective as the top section of the window held up by the window locks, this is an immediate safety hazard as the window is the means of egress to the rear firescap
Feb 6, 2024 · Penalty $1,250
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. attime of inspection, i observed no work but common area floors 1-4, hasexcessive dust, on top of floor protection. same violations was issue
Nov 9, 2023
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.note:at time of inspection at occupied dwelling observed excessive dust in corridors of floors of stairs,stair landing and on plastic door barr
Sep 1, 2023 · Penalty $2,500
Resolve - Class - 1
Bc3303.10 tenant protection plan not being complianed with.note:at time of inspection at occupied dwelling observed excessive dust in corridors of floors of stairs,stair landings & on plastic door barriors.seve
Sep 1, 2023 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 19, 2026 · Apt 4R
Close - Heat/hot water
Apartment only
Oct 18, 2026 · Apt 4R
Close - Heat/hot water
Apartment only
Oct 18, 2026 · Apt 3R
Close - Electric
No lighting
Apr 10, 2026 · Apt 4R
Close - Water leak
Heavy flow
Mar 10, 2026 · Apt 3R
Close - Water leak
Slow leak
Mar 10, 2026 · Apt 3R
Close - Electric
No lighting
Mar 10, 2026 · Apt 3R
Close - Electric
No lighting
Mar 6, 2026 · Apt 4R
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Appliance
Refrigerator
Dec 31, 2025 · Apt 4R
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 29, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jun 17, 2025 · Apt 4R
Close - Heat/hot water
Apartment only
Jun 17, 2025 · Apt 3R
Close - Heat/hot water
Apartment only
Jun 16, 2025 · Apt 3R
Close - Heat/hot water
Apartment only
Jun 16, 2025 · Apt 4R
Close - Heat/hot water
Apartment only
Jun 15, 2025 · Apt 3R
Close - Heat/hot water
Apartment only
Jun 15, 2025 · Apt 4R
Close - Heat/hot water
Apartment only
Jun 14, 2025 · Apt 3R
Close - Heat/hot water
Apartment only
Jun 14, 2025 · Apt 4R
Close - General
Bell/buzzer/intercom
Jan 31, 2025 · Apt 3R
Close - Door/window
Window frame
Jan 31, 2025 · Apt 3R
Close - Door/window
Window pane
Jan 31, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Nov 9, 2024 · Apt BLDG
Close - General
Bell/buzzer/intercom
Oct 27, 2024 · Apt 4R
Close - General
Bell/buzzer/intercom
Oct 27, 2024 · Apt 4R
Close - Heat/hot water
Entire building
Oct 27, 2024 · Apt 3R
Close - Heat/hot water
Apartment only
Oct 9, 2024 · Apt 4R
Close - General
Bell/buzzer/intercom
Oct 9, 2024 · Apt 4R
Close - General
Bell/buzzer/intercom
Oct 9, 2024 · Apt 3R
Close - Heat/hot water
Entire building
Oct 9, 2024 · Apt 4R
Close - Door/window
Door
Sep 14, 2024 · Apt 3R
Close - Outside building
Porch/balcony
Sep 14, 2024 · Apt 3R
Close - General
Bell/buzzer/intercom
Sep 14, 2024 · Apt 3R
Close - General
Bell/buzzer/intercom
Aug 31, 2024 · Apt 4R
Close - Electric
Power outage
Aug 3, 2024 · Apt 3R
Close - Paint/plaster
Ceiling
Jul 25, 2024 · Apt 2R
Close - General
Bell/buzzer/intercom
Jul 25, 2024 · Apt 2R
Close - Door/window
Window frame
Jul 25, 2024 · Apt 2R
Close - Paint/plaster
Ceiling
Jul 25, 2024 · Apt 3
Close - General
Bell/buzzer/intercom
Jul 25, 2024 · Apt 3
Close - Door/window
Window frame
Jul 25, 2024 · Apt 3
Close - General
Bell/buzzer/intercom
Jun 6, 2024 · Apt 4R
Close - Plumbing
Water supply
Jun 6, 2024 · Apt 4R
Close - Heat/hot water
Entire building
Apr 26, 2024 · Apt 3R
Close - Heat/hot water
Entire building
Apr 26, 2024 · Apt 4R
Close - Heat/hot water
Entire building
Apr 19, 2024 · Apt 3R
Close - Plumbing
Water supply
Apr 16, 2024 · Apt BLDG
Close - Plumbing
Water supply
Apr 16, 2024 · Apt 4R
Close - Heat/hot water
Entire building
Apr 16, 2024 · Apt 4R
Close - Unsanitary condition
Pests
Apr 16, 2024 · Apt 4R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1888
- Floors
- 4
- Residential units
- 8
- Building area
- 8,400 ft²
- Lot area
- 3,667 ft²
- Zoning
- R6
- Community board
- 306
- Council district
- 39
- Block / lot
- 305 / 34
- Assessed value
- $1,830,600
- Landmark / historic district
- Cobble Hill Historic District
HPD registration #316564, last renewed Jun 24, 2026.
Questions about 151 Baltic Street
Who owns 151 Baltic Street?
The owner of record in NYC Department of City Planning PLUTO data is 151 Baltic St, LLC.
Does 151 Baltic Street have violations?
Yes. NYC HPD has recorded 170 housing violations at this property.
Is 151 Baltic Street rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 25% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 151 Baltic Street built?
City records list 1888 as the year it was built.
How many apartments are in 151 Baltic Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.