110 Livingston Street is a condominium built in 1926 in Brooklyn, 11201. It has 299 residential units across 17 floors. The owner of record is 110 Livingston. HPD has recorded 13 housing violations here, most recently on November 25, 2024. 4 of the 13 most recent violations are still open.
- HPD violations
- 13
- DOB violations
- 84
- ECB violations
- 92
- HPD complaints
- 73
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 13
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 10, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Feb 8, 2023
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Feb 8, 2023
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at floor approx. 20 sq. ft. in the 2nd room from north located at apt 15i, 15th story, 3rd apartment from north at east
Oct 25, 2015 · Apt 15I
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 15i, 15th story, 3rd apartment from north at east
Oct 25, 2015 · Apt 15I
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at floor approx 1 sq. ft. in the 1st room from north located at apt 15i, 15th story, 3rd apartment from north at east
Oct 25, 2015 · Apt 15I
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 15i, 15th story, 3rd apartment from north at east
Apr 11, 2012 · Apt 15I
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective located at apt 15i, 15th story, 1st apartment from north at east
Apr 11, 2012 · Apt 15I
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 15i, 15th story, 1st apartment from north at east
Apr 11, 2012 · Apt 15I
Open — Nov sent out
Show 3 more ↓
- BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 15i, 15th story, 3rd apartment from north at east
Apr 11, 2012 · Apt 15I
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked boiler room at cellar
Nov 28, 2009
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water at 140 degrees in the entire apartment located at apt 2l, 1st story, 1st apartment from south at west
Jan 22, 2009 · Apt 2L
Closed — Violation closed
DOB building violations · 84
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 30, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 2, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 2, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 2, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 2, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 2, 2021
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 24, 2020
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 21, 2019
Dob violation - resolved
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 21, 2019
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2018
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 15, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 15, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 15, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 15, 2016
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2015
Dob violation - resolved
ECB violations · 92
- Class - 2
Failure to maintain building. observed at exposure#3 bilco doors are deteriorating and have a hole approx 4"x5" and getting worse on pedestrian walkway., repair and/or replace
May 16, 2024
Resolve - Class - 1
97:x:10; entire device is shut down for motor repair. need to repair.
Sep 19, 2023 · Penalty $625
Resolve - Class - 1
Zone restrictor not working (cu). escape hatch not secured on top of the car
Dec 6, 2022 · Penalty $1,250
Resolve - Class - 2
No storage on shed. pedestrian protection does not meet code specifications storage not allowed unless permit state designated area. noted: at time of inspection i observed sws in place on exp#1,2&3 w/storage
May 8, 2019 · Penalty $2,430
Resolve - Class - 1
Sec. 3310.4 site condition. condition of site has to be in conformancew/ssp. notes: at time of inspection,i observed active site for which assm required that is contrary to the site safety plan. the site safety
May 8, 2019 · Penalty $2,500
Resolve - Class - 1
Built contrary to plan. supported scaffold on site is contrary to approved plan. noted: at time of inspection i observed supported scaffold in use that is contrary to the approved plan. a.missing stacking pins
Sep 6, 2018 · Penalty $2,500
Resolve - Class - 2
Installation inspection all equipment is to be inspected once installation is complete as per drawings. note: at time of inspection i observed suspended scaffold in use with no record of an installation report
Sep 6, 2018
Resolve - Class - 1
Plans work does not conform to approved construction documents. note: at time of inspection i observed sws in place that is contrary to the approved. man required the use of 2 additional osha plank directly be
Sep 6, 2018 · Penalty $625
Resolve - Class - 1
Sec. 3314.8 the open sides & ends of scaffold platform shall be provided w/a guardrail system. noted: at time of inspection 2 workers on supported scaffold. scaffold missing guardrail system in multiple locatio
Jun 7, 2018 · Penalty $2,500
Resolve - Class - 1
Sec. 3314.4.3.5 pre-shift inspection for supported scaffold. prior to each shift the scaffold shall be inspected the results of inspection shall be documented in a pre-shift inspection report signed & dated who
Jun 7, 2018 · Penalty $250
Resolve
Show 40 more ↓
- Class - 1
Sec. 3314.4.4.4 the scaffold & all materials & equipment located on or used fron the scaffold shal be kept stable & secure at all time. noted: at time of inspection shop vac,bricks,buckets,large stone on scaffo
Jun 7, 2018
Resolve - Class - 1
Sec. 3314.5 platforms on all working levels of a scaffold shall be fully planked or decked in accordance w/sections 3314.5.1 through 3314.5.6. noted: at time of inspection 2 workers on scaffold,scaffold platfor
Jun 7, 2018 · Penalty $2,500
Resolve - Class - 1
Sec. 3303.16 contractors shed & offices located w/i 30 feet of existing bldg or another contractor shed or office shall be made of metal or other non combustible material. noted: at time of inspection contracto
Jun 7, 2018 · Penalty $625
Resolve - Class - 2
Sec. 3307.6.4.2.2.2 no material shall be placed or stored upon a sidewalk shed designed as a heavy duty sidewalk shed under 3307.6.4.2. noted:at time of inspection material & construction sheds on sidewalk shed
Jun 7, 2018 · Penalty $1,250
Resolve - Class - 2
Work w/o a permit/cd-5. noted: at time of inspection suspended scaffold w/outrigger beams installed & hanging. cd-5 exp on 6-01-18. remedy: obtain/renew cd-5.
Jun 7, 2018
Resolve - Class - 1
Sec. 3314.10.11 securing suspended scaffold. at the end of the shift,the suspended scaffold shall be cleared of all equipment/material & lowered to the street or deck of the sidewalk shed or shall be secured to
Jun 7, 2018 · Penalty $2,500
Resolve - Class - 2
Pswo all work related to permit #321456624 work w/o permit. noted: at time of inspection 3 workers on site 2 on pipe scaffold for facade job under permit #321456624. rmdy: stop all work under permit #3214566
Jun 7, 2018
Resolve - Class - 1
Failure to conduct a site-specific safety orientation program for all workers. noted: at time of inspection no site specific safety orientation could be provided for workers on site or any worker at all.
Jun 7, 2018 · Penalty $250
Resolve - Class - 1
Sec. 3310.8.6 reasonable prudence in addition to the above requirements,the site safety manager or coordinator shall use reasonable pruduce to ensure that safety is maintained at the site as job conditions dica
Jun 7, 2018 · Penalty $2,500
Resolve - Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control#809158. remedy: submit required technical report
May 18, 2018 · Penalty $625
Resolve - Class - 1
Work w/o a permit.at lower level of garage facility installed twenty-nine(29)hydraulic/mechanical car lifts w/o obtaining permit.remedy:obtain permit.
Nov 6, 2014
Resolve - Class - 1
Failure to comply w/the comm'nrs order contained i nov#35084681n issued on 01/12/14, wirj w/o a permit:hydraulic/mechanical car lifts installed in garage w/o permits.remedy:comply w/the comm'nrs order.
Nov 6, 2014
Resolve - Class - 1
Failure to comply w/ the comm's order contained in notice of violation#35084681n issued on 01/12/14 for installation of hydraculiccar lift w/o a permit.rem:comply w/ the comm's order.
Sep 15, 2014
Resolve - Class - 1
Fail to comply w/the comm's order contained in notice of vio#35084681nissued on 01/12/14.installation of hydraulic car lifts w/o permit.rem:comply w/the comm's order.
Jul 31, 2014
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #35084681n issued on 1/12/14. (hydralic cars w/o permit)remedy: comply w/the commissioner's order.
May 14, 2014
Resolve - Class - 1
Failure to comply w/commissioner's order contained in nov 3508461n issued on 1/12/14. work w/o a permit. installed hydraulic/mechanical car lifts in garage w/o permit.rmdy:comply w/commissioner's order.
Mar 1, 2014
Resolve - Class - 1
Work w/o permit. note: hydraulic/mechanical car lifts installed in garage w/o permits. remedy: obtain permits & file for lifts.
Jan 12, 2014
Resolve - Class - 2
Failure to maintain. note: 1. ceilings (both levels) of garage have spalling concrete, 4 exposed rebar/mesh, missing concrete w/holes through stabs. 2. main level has cracked concrete throughout flrs. remedy:
Jan 12, 2014 · Penalty $500
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner. no fire stopping per bc 712.3 & 27-345. note: at ceilings of garage several areas w/ penetration through ceiling for pipes&other openings w/o fire stopping
Jan 12, 2014 · Penalty $500
Resolve - Class - 1
Work without a permit work noted:installed three ramps. installed double doors in electrical room. rem:obtain permit or restore premises to prior legal condition.
Dec 21, 2011 · Penalty $1,600
Resolve - Class - 2
Failure to maitain bldg in code compliant manner concrete floors cracked patched unlevel in some areas walls and floor opening greater than 6" and throughout fire stopping and fire proofing missing throughout r
Dec 21, 2011 · Penalty $500
Resolve - Class - 1
Failure to maintain building in code compliant manner-electrical room used as storage room. stuffed chair,small wood table,boxes,golf clubs,a/c unit without cover,wood pannels kitchen cab table top w/sink cut o
Dec 21, 2011 · Penalty $1,000
Resolve - Class - 1
Failure to maintain building in code compliant manner. lack of emergency power or storage battery connected to exit signs no exit directional signs. rem:obtain permits architect to provide egress plan & maintai
Dec 21, 2011 · Penalty $500
Resolve - Class - 1
Failure to comply w/ an order of the commissioner.noted:a swo/violation was issued on 9/8/10 for no license rigger on site,"swo stated"do not remove scaffold before being re-inspected.scaffold was removed.refer
Sep 11, 2010 · Penalty $2,400
Resolve - Class - 1
Supervision/use of rigging equipment without a riggers license.noted:no license riggers on site for suspended scaffold or outrigger beams in use @ exp#1.obtain license.partial swo for suspended scaffold issued
Sep 8, 2010 · Penalty $4,800
Resolve - Class - 2
Sec mc403.1 mechanical ventilation not provided where requires note the return vent located at 12th fl near apt 12o public hall is inoperable not taking in any stale air causing occupants to breath stagnant air
Oct 23, 2009
Resolve - Class - 2
02b10.29d06.05m07.17d06.70p17 02b intermittently muted 29 greenfield 05m door restrictor 17d bsmt 70p no available access
Mar 20, 2009
Resolve - Class - 3
02b10.52o02.05m07.100m07.17d06.70p17.29d06.02b intermittent muted bell 52o clean where needed 05m door zone restrictors 100m brake tag in lobby 70 bsmt 70p no available access 29d secure greenfield
Mar 20, 2009
Resolve - Class - 1
Failure to maintain bldg in code compliant manner note bldg is found with c shape double loaded corridors and inadequate ventilation system provided for public halls w/o windows as supplies found and no returns
Aug 5, 2008 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in code compliant manner defects noted inadequate exit signs provided or installed within public hallways thruout showing location of fire stairs in case of an emergency all flrs
Aug 5, 2008 · Penalty $2,400
Resolve - Class - 2
Failure to maintain bldg in code compliant manner! noted: at door use as exits from terraces found w/the installation of double cylinder key operated locks installed. remedy: provide legal hardware forthwith!
Aug 5, 2008 · Penalty $250
Resolve - Hazardous
Failure to maintain bldg. defects noted: ventilation system which supplies fresh air to bathroom is inoperable at apt 12k. bathroom is windowless creating unsafe conditions for tenants occupying bldg. remedy:
Jan 8, 2008 · Penalty $800
Resolve - Non-hazardous
Failure to maintain bldg. noted: at sub level garage, breakaway fire proofing in approx 5 places on ceiling joists (metal) to place (installed) straps to secure pipes. remedy: maintain josts - fire proof.
Nov 24, 2007 · Penalty $350
Resolve - Hazardous
Failure to use panic hardware where required by law. exit door from sub garage level to upper floors has no hardware (panic) installed thus affecting means of egress. remedy: provide panic hardware.
Nov 24, 2007 · Penalty $350
Resolve - Non-hazardous
Failure to maintain building. noted: at sub-level garage, door leadingto stair case to upper level, installed illegal hardware(locking device) & failure to install (panic) hardware. remedy: maintain door
Nov 24, 2007 · Penalty $800
Resolve - Hazardous
Failure to provide a designated site safety manager present as per ll61/87.upon insp noted:construction in progress exterior walls also not completed & no site safety manager present as per ll 61/87.remedy:stop
Jun 25, 2007 · Penalty $2,000
Resolve - Non-hazardous
Failure to safeguard public property.upon insp flatbed truck lic#46238ts is parked in st occupying only lane of flow of traffic west bound lic#46238-js ny commercial causing traffic to be on opposite side of
May 23, 2007 · Penalty $1,500
Resolve - Non-hazardous
Expired permit-alteration.upon insp alt permit #301990898 expired on 02/21/07.16 story bld under alteration site open under const.remedy:stop all work entire job site renew alteration permit as per code call
Mar 26, 2007 · Penalty $500
Resolve - Hazardous
No flag man. upon insp 2 trucks on livingston st occuping 2nd lane of traffic causing vehicles to cross yellow line into opposite traffic no flag persons to direct vehicle traffic, causing traffic congrestion
Dec 13, 2006 · Penalty $1,000
Resolve - Non-hazardous
No dot permit posted. trucks occupying 2nd lane. upon insp 2 trucks occupying 2nd lane on livingston st side. causing vehicle traffic to use opposite sides of yellow line reducing 2 way traffic causing
Dec 13, 2006 · Penalty $400
Resolve
Complaints
- Heat/hot water
Entire building
Jun 24, 2025 · Apt 17F
Close - Plumbing
Toilet
Sep 9, 2024 · Apt PHF
Close - Plumbing
Water supply
Oct 11, 2023 · Apt PHF
Close - Unsanitary condition
Pests
Jun 7, 2023 · Apt 3T
Close - Unsanitary condition
Pests
Apr 17, 2023 · Apt 3T
Close - Unsanitary condition
Pests
Mar 27, 2023 · Apt 3T
Close - Heat/hot water
Apartment only
Feb 8, 2023 · Apt 3T
Close - Heat/hot water
Apartment only
Feb 5, 2023 · Apt 3T
Close - Heat/hot water
Apartment only
Dec 26, 2022 · Apt 3T
Close - Heat/hot water
Apartment only
Nov 19, 2022 · Apt 3T
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Oct 29, 2022 · Apt BLDG
Close - Unsanitary condition
Mold
Oct 5, 2015 · Apt 15I
Close - Unsanitary condition
Mold
Oct 5, 2015 · Apt 15I
Close - General
Floor
Apr 9, 2012 · Apt 15I
Close - General
Floor
Apr 9, 2012 · Apt 15I
Close - General
Mold
Apr 9, 2012 · Apt 15I
Close - General
Mold
Apr 9, 2012 · Apt 15I
Close - General
Mold
Dec 8, 2011 · Apt 15I
Close - General
Mold
Dec 8, 2011 · Apt 15I
Close - General
Mold
Nov 2, 2011 · Apt 15I
Close - Heating
Heat related
Dec 23, 2010 · Apt 6L
Close - Nonconst
Rubbish
Aug 4, 2010 · Apt 1
Close - General
Ventilation system
Jan 6, 2010 · Apt 12K
Close - Heating
Heat related
Jan 2, 2010 · Apt BLDG
Close - General
Ventilation system
Dec 5, 2009 · Apt 12K
Close - Heating
Heat related
Dec 5, 2009 · Apt 12K
Close - Plumbing
Water supply
Nov 20, 2009 · Apt 12K
Close - Plumbing
Water supply
Nov 20, 2009 · Apt 12K
Close - General
Ventilation system
Oct 10, 2009 · Apt 12K
Close - Heating
Heat related
Sep 20, 2009 · Apt 12K
Close - Plumbing
Water supply
Sep 20, 2009 · Apt 12K
Close - Heating
Heat related
Sep 20, 2009 · Apt 12K
Close - General
Ventilation system
Sep 7, 2009 · Apt 12K
Close - Heating
Heat related
Sep 7, 2009 · Apt 12K
Close - Heating
Heat related
Aug 28, 2009 · Apt 12K
Close - General
Ventilation system
Aug 28, 2009 · Apt 12K
Close - Heating
Heat related
Aug 28, 2009 · Apt 12K
Close - Heating
Heat related
Aug 28, 2009 · Apt 12K
Close - General
Ventilation system
Aug 28, 2009 · Apt 12K
Close - Heating
Heat related
Aug 28, 2009 · Apt 12K
Close - General
Ventilation system
Aug 16, 2009 · Apt 12K
Close - Electric
Wiring
Aug 6, 2009 · Apt 12K
Close - Heating
Heat related
May 29, 2009 · Apt 12K
Close - Heating
Heat related
Apr 26, 2009 · Apt 2L
Close - General
Doors
Mar 14, 2009 · Apt BLDG
Close - Heating
Heat related
Mar 3, 2009 · Apt 2L
Close - Heating
Heat related
Feb 5, 2009 · Apt 2L
Close - Heating
Heat related
Feb 5, 2009 · Apt 2K
Close - Heating
Heat related
Jan 26, 2009 · Apt BLDG
Close - Heating
Heat related
Jan 26, 2009 · Apt 12K
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1926
- Floors
- 17
- Residential units
- 299
- Building area
- 337,174 ft²
- Lot area
- 29,000 ft²
- Zoning
- C5-4
- Community board
- 302
- Council district
- 33
- Block / lot
- 269 / 7501
- Assessed value
- $43,904,157
- Landmark / historic district
- No
HPD registration #379851, last renewed Sep 26, 2025.
Questions about 110 Livingston Street
Who owns 110 Livingston Street?
The owner of record in NYC Department of City Planning PLUTO data is 110 Livingston.
Does 110 Livingston Street have violations?
Yes. NYC HPD has recorded 13 housing violations at this property.
Is 110 Livingston Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 110 Livingston Street built?
City records list 1926 as the year it was built.
How many apartments are in 110 Livingston Street?
It has 299 residential units and 320 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.