59 Livingston Street
Brooklyn, NY 11201BBL 3-00265-0006Map
Owner of record: Maxtor Realty Corp
59 Livingston Street is an elevator apartment building built in 1917 in Brooklyn, 11201. It has 43 residential units across 6 floors. The owner of record is Maxtor Realty Corp. HPD has recorded 24 housing violations here, most recently on July 23, 2025. 5 of the 24 most recent violations are still open. City tax records listed 23 rent-stabilized apartments here in 2024.
- HPD violations
- 24
- DOB violations
- 36
- ECB violations
- 13
- HPD complaints
- 55
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 24
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from east at south located at apt 6a, 6th story, 2nd apartment from east at south
Jul 23, 2025 · Apt 6A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 6a, 6th story, 2nd apartment from east at south
Jul 23, 2025 · Apt 6A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 6a, 6th story, 2nd apartment from east at south
Jul 23, 2025 · Apt 6A
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 23, 2023
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 4e, 4th story, 1st apartment from north at east
Jun 7, 2021 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 4e, 4th story, 1st apartment from north at east
Jun 7, 2021 · Apt 4E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 4e, 4th story, 1st apartment from north at east
Jun 7, 2021 · Apt 4E
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the 1st room from east at north located at apt 4e, 4th story, 1st apartment from north at east , section at north
Jan 8, 2021 · Apt 4E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and east wal in the 1st room from east at north located at apt 4e, 4th story, 1st apartment from north at east , section at north
Jan 8, 2021 · Apt 4E
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective located at apt 4e, 4th story, 1st apartment from north at east , section at north
Jan 8, 2021 · Apt 4E
Closed — Violation dismissed
Show 14 more ↓
- BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 4e, 4th story, 1st apartment from north at east , section at north
Jan 8, 2021 · Apt 4E
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the ceramic tiles with grouted joints / caulking surface of visible mold at north ,south and west walls in the bathroom located at apt 4e, 4th story, 1st apartment from north at east , section at north
Jan 8, 2021 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors at apartment in the entrance located at apt 4e, 4th story, 1st apartment from north at east , section at north
Jan 8, 2021 · Apt 4E
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jan 8, 2021
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors in the entrance located at apt 2b, 2nd story, 1st apartment from east at south
Aug 23, 2018 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st bathroom from east at north located at apt 2b, 2nd story, apartment at south
Jun 15, 2018 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st bathroom from east at north located at apt 2b, 2nd story, apartment at south
Jun 15, 2018 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from east at south located at apt 2b, 2nd story, apartment at south
Jun 15, 2018 · Apt 2B
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at south located at apt 2b, 2nd story, apartment at south
Jun 15, 2018 · Apt 2B
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east at south located at apt 2b, 2nd story, apartment at south
Jun 15, 2018 · Apt 2B
Open — Not complied with - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air-conditioner protruding beyond window sill at 6th story balcony at 1st fire escape from east at south
Jun 15, 2018
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air-conditioners protruding beyond windows sills at 6th, 3rd and 2nd stories balconies at 2nd fire escape from east at south
Jun 15, 2018
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the 1st bathroom from east at south located at apt 2b, 2nd story, apartment at south
Jun 15, 2018 · Apt 2B
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby, 1st story
Mar 4, 2015
Closed — Violation dismissed
DOB building violations · 36
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 2, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 2, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 17, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 17, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 20, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed
Show 26 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 1, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 12, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 12, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 11, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 11, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 21, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 21, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 22, 2004
Dob violation - resolved - Elevator elevatorrequired
3p544
Feb 21, 2001
Dob violation - resolved - Elevator elevatorrequired
3p545
Feb 21, 2001
Dob violation - resolved - Elevator elevatorrequired
3p544
Dec 17, 1999
Dob violation - resolved - Elevator elevatorrequired
3p545
Dec 17, 1999
Dob violation - resolved - Elevator elevatoroptional
2
Oct 12, 1989
Dob violation - dismissed - Elevator elevatorrequired
(51)provide access to motor room
Mar 27, 1989
Dob violation - resolved
ECB violations · 13
- Class - 2
Failure to maintain exterior of building facade and appurtenances.noteobserved at exp2 west elevation:brick chipping/spalling/disintegratingmortar joint and abrasion of brick face at multiple locations.remedy:t
Jan 17, 2023
Resolve - Class - 3
Failure to post building exterior wall condition certificate as requieunder 1rcny 103-04.noted:observed that above mentioned certificate was not posted.remedy:post building exterior wall certificate on conditio
Jan 17, 2023
Resolve - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #912321.remedy:submit acceptable required te
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit a required cycle 8a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control # 812321.remedy: submit required technical report
Feb 11, 2019 · Penalty $625
Resolve - Class - 2
Failure to maintain exterior building facade & appurtenances.note:ecpo1,south elevation:damaged/missing masonry lintle stone at various locations damaged/crack decorative stone at parapet wall/cornice.(ii)expo2
Mar 2, 2017 · Penalty $500
Resolve - Non-hazardous
40b11,8v1. 40-cehck bearing
May 29, 2001 · Penalty $180
Resolve - Non-hazardous
38m07,37n10. 37n- over load by passed and missing oil can.
Mar 8, 2000
Resolve - Non-hazardous
50y 50f 14i 15d 40l 40 l 11 clicking 15 d 06 secure hole in basement door 31 q 03 top of car
Nov 16, 1998
Resolve - Non-hazardous
50y 50f 37d 40l 53d 03y 08v 27 d 06 secure timer 40 l 11 clicking 53 d 06 secure light fixture 03 y 02 top of car
Nov 16, 1998
Resolve - Non-hazardous
50y11,35m12,53x11,13m12,74m12,57o2,58o2,59o2. 35-fire extinguisher. 53-lighting. 13-car mirror. 74-elec box covers under car.
Feb 10, 1998
Resolve
Show 3 more ↓
- Non-hazardous
50y11,50ad3,35o2,5j1,35am12,74o2,74am12,57o2,74bm12. 50a-motor wires.5-car doors. 35a-fire extinguisher. 74-car top. 74a-elec box covers.74b-elec box covers under car.
Feb 10, 1998
Resolve - Non-hazardous
05j, 08v, 22d, 39h, 57o.
Jun 29, 1995
Resolve - Non-hazardous
08v, 39h, 29m, 57o. 29-c/weight buffer spring.
Jun 26, 1995
Resolve
Complaints
- Door/window
Window frame
Jul 15, 2025 · Apt 6A
Close - Water leak
Damp spot
Jun 2, 2021 · Apt 4E
Close - Water leak
Slow leak
Dec 16, 2020 · Apt 4E
Close - Heat/hot water
Entire building
Jan 13, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 13, 2019 · Apt 1E
Close - Paint/plaster
Wall
Jun 14, 2018 · Apt 2B
Close - Water leak
Heavy flow
Jun 14, 2018 · Apt 2B
Close - Paint/plaster
Wall
Jun 14, 2018 · Apt 2B
Close - Heat/hot water
Entire building
Jan 18, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2018 · Apt 3A
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 3, 2018 · Apt 5B
Close - Heat/hot water
Entire building
Feb 12, 2017 · Apt 1C
Close - Heat/hot water
Entire building
Feb 7, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2017 · Apt 6D1
Close - Heat/hot water
Entire building
Jan 7, 2017 · Apt 1D
Close - Heat/hot water
Entire building
Feb 8, 2016 · Apt 4B1
Close - Heat/hot water
Entire building
Jan 25, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2016 · Apt 3A
Close - Heat/hot water
Entire building
Jan 9, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2016 · Apt 3A
Close - Heat/hot water
Entire building
Dec 20, 2015 · Apt 1B
Close - Heat/hot water
Entire building
Nov 29, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 8, 2015 · Apt 3A
Close - Heat/hot water
Entire building
Mar 29, 2015 · Apt 4A
Close - Heat/hot water
Entire building
Mar 1, 2015 · Apt 3A
Close - Heating
Heat related
Oct 15, 2007 · Apt 2D
Close - Plumbing
Water-leaks
Apr 11, 2007 · Apt 2E
Close - Plumbing
Water-leaks
Apr 11, 2007 · Apt 2E
Close - General
Mold
Feb 20, 2007 · Apt 5D
Close - Heating
Heat related
Apr 3, 2006 · Apt 2D
Close - Heating
Heat related
Feb 3, 2006 · Apt 2D
Close - Heating
Heat related
Jan 18, 2006 · Apt 2D
Close - Heating
Heat related
Dec 29, 2005 · Apt 2D
Close - Heating
Heat related
Dec 26, 2005 · Apt 2D
Close - Heating
Heat related
Dec 16, 2005 · Apt 2D
Close - Heating
Heat related
Nov 28, 2005 · Apt 2D
Close - Heating
Heat related
Nov 7, 2005 · Apt 2D
Close - Heating
Heat related
Mar 31, 2005 · Apt 2D
Close - Heating
Heat related
Mar 31, 2005 · Apt 2D
Close - Heating
Heat related
Mar 30, 2005 · Apt 2D
Close - Heating
Heat related
Jan 18, 2005 · Apt 2D
Close - Heating
Heat related
Dec 23, 2004 · Apt 2D
Close - Heating
Heat related
Dec 21, 2004 · Apt 2D
Close - Heating
Heat related
Oct 6, 2004 · Apt 2D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1917
- Floors
- 6
- Residential units
- 43
- Building area
- 63,224 ft²
- Lot area
- 15,015 ft²
- Zoning
- C5-2A
- Community board
- 302
- Council district
- 33
- Block / lot
- 265 / 6
- Assessed value
- $3,289,050
- Landmark / historic district
- No
HPD registration #300476, last renewed Aug 13, 2025.
Questions about 59 Livingston Street
Who owns 59 Livingston Street?
The owner of record in NYC Department of City Planning PLUTO data is Maxtor Realty Corp.
Does 59 Livingston Street have violations?
Yes. NYC HPD has recorded 24 housing violations at this property.
Is 59 Livingston Street rent stabilized?
NYC Department of Finance tax bills listed 23 rent-stabilized units here in 2024 (about 53% of its 43 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 59 Livingston Street built?
City records list 1917 as the year it was built.
How many apartments are in 59 Livingston Street?
It has 43 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.