109 Gold Street
Brooklyn, NY 11201BBL 3-00056-0002Map
Owner of record: 109 Gold Street Owner LLC
109 Gold Street is an elevator apartment building built in 2008 in Brooklyn, 11201. It has 33 residential units across 7 floors. The owner of record is 109 Gold Street Owner LLC. HPD has recorded 25 housing violations here, most recently on March 7, 2026. City tax records listed 33 rent-stabilized apartments here in 2024.
- HPD violations
- 25
- DOB violations
- 7
- ECB violations
- 15
- HPD complaints
- 305
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 25
- CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at vestibule entrance door , 1st story
Mar 7, 2026
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2d, 2nd story, 3rd apartment from west at north
Mar 7, 2026 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Provide security in the case of power outage by installing an acceptable heavy-duty lock and latch set at vestibule entrance door , 1st story
Mar 7, 2026
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective laminated floor tiles in the 1st room from north at west located at apt 3f, 3rd story, 1st apartment from west at north
Aug 29, 2023 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 29, 2023
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall
Oct 1, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Oct 1, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Oct 1, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall
Oct 1, 2022
Closed — Violation dismissed
Show 15 more ↓
- ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 1, 2022
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Oct 1, 2022
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall
Oct 1, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 5a, 5th story, 3rd apartment from east at south
Mar 1, 2022 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 5a, 5th story, 3rd apartment from east at south
Mar 1, 2022 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from north located at apt 4f, 4th story, 1st apartment from west at north
Feb 27, 2022 · Apt 4F
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 1st room from north located at apt 4f, 4th story, 1st apartment from west at north
Feb 27, 2022 · Apt 4F
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room at cellar
Feb 27, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3a, 3rd story
Feb 27, 2022 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story
Feb 27, 2022 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at stove in the kitchen located at apt 3a, 3rd story, 3rd apartment from east at south
Feb 27, 2022 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at stove in the kitchen located at apt 4f, 4th story, 1st apartment from west at north
Feb 27, 2022 · Apt 4F
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt pha, 7th story, 1st apartment from east at south
Feb 25, 2022 · Apt PHA
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt pha, 7th story, 1st apartment from east at south
Feb 25, 2022 · Apt PHA
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5d, 5th story, 3rd apartment from west at north
Feb 23, 2022 · Apt 5D
Closed — Violation closed
DOB building violations · 7
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 25, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2014
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 16, 2012
Dob violation - resolved - Construction other optional
C-construction other optional
Mar 30, 2010
Dob violation - active - Construction other optional
Failure to safeguard all persons and property affected by construction operstions remedy: safeguard public prioperty
Mar 30, 2010
Dob violation - dismissed
ECB violations · 15
- Class - 2
1) adjust/clean governor making squeaking noise. (2) provide current elevator company label on mainline disconnect and controller. 3) 2026 elevator maintenance preventative log missing months of signatures.
Sep 1, 2026 · Penalty $625
Active - Class - 2
32j01,98bb05. 32j01-car roller is out of adjustment; 98bb05-cat5 tag expired.
May 16, 2016 · Penalty $500
Resolve - Class - 1
Sec 3314.9.1.2 misc viol: supported scaffold does not meet dob specs. noted: no access or egress provided to scaffold. steps not installed pins missing thru out. planks not tied down. remedy: conform to code.
May 28, 2010 · Penalty $2,400
Resolve - Class - 1
Failure to institute maintain 1 safety equipment measures no guardrails noted no guardrails @ exp 3 & 4 observed @ 4th & 6th flrs picture dated remedy: provide guardrails
May 26, 2010 · Penalty $2,400
Resolve - Class - 1
Failure to institute safety equipment measures - no toe boards. noted:no toe boards observed or scaffolds at exposures 2 & 3. remedy: provide toe boards.
May 26, 2010 · Penalty $1,000
Resolve - Class - 1
Failure to safeguard all persons affected by construction operations. noted: no overhead protection provided at exp 4. stop all work at exp 4 except to provide safety. remedy: provide overhead protection of
May 26, 2010 · Penalty $2,400
Resolve - Class - 1
3303.4.5.1.2 misc.vio.materials stored too close to the edge of bldg.note:@ time of inspection observed materials such as a pile of rebars,wood,etc.being stored on the 7th flr. less than 10ft away from the peri
Dec 10, 2009 · Penalty $1,600
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guard rails.note:@ time of inspec.observed masonry workbeing performed @ roof level w/o any guard rail in place.remedy:stop a
Dec 10, 2009 · Penalty $1,200
Resolve - Class - 1
Failure to safguard all persons & property affected by const. operations.failure to provide overhead protection to adjoining property.noted:@ time of inspec. bldg to 5th flr.(approx. 50')observed wall under con
Sep 3, 2009 · Penalty $2,400
Resolve - Hazardous
Failure to obtain a permit for temporary construction. noted: 8'h plywood construction fence erected at front of lot for demolition purposesdemolition work has been signed off w/8' high plywood fence erected at
Mar 17, 2008 · Penalty $400
Resolve
Show 5 more ↓
- Non-hazardous
Erected, dismantled, repaired, maintained or modified supported scaffold 40' feet or higherr w/o a permit pursuant to 27-1042. demo of facades under permit 310039133 utilizing supported scaffold @ exposures
Feb 15, 2008 · Penalty $800
Resolve - Non-hazardous
Erected, dismantled, repaired, maintained or modified supported scaffold 40' or higher w/o a permit pursuant to 27-1042. demo of structure under permit 302380956 utilizing supported scaffold which exceeds
Feb 15, 2008 · Penalty $800
Resolve - Hazardous
Failure to provide @ least 2 means of egress from space as required. noted: front apt. (west side) @ 2nd fl has only one mean of egress - entry thru common stair (interior) to front door. no access to 1st & 3rd
Oct 27, 2006
Resolve - Non-hazardous
Dangerous places & things. noted: brick work erected at front facade nearly completed to roof line, where-as at various locations the wall is out of plumb with bulging present. wall ties are present but brick
Aug 24, 2005 · Penalty $2,500
Resolve - Hazardous
Work without permit hazardous at time of inspection. vencer was being constructed with pipe scaffold obstructing sidewalk and pedestrains. scaffold was not erected properly or tied in adequately debris & materi
Jun 10, 2002 · Penalty $2,500
Resolve
Complaints
- Safety
Smoke detector
Sep 24, 2026 · Apt PHA
Open - Unsanitary condition
Pests
Sep 24, 2026 · Apt PHA
Open - Door/window
Door
Aug 15, 2026 · Apt PHA
Close - Door/window
Door
Aug 15, 2026 · Apt PHA
Close - Door/window
Door
Aug 14, 2026 · Apt PHA
Close - Door/window
Door
Aug 14, 2026 · Apt 6D
Close - General
Bell/buzzer/intercom
Aug 14, 2026 · Apt 4A
Close - Door/window
Door
Aug 14, 2026 · Apt 4A
Close - Plumbing
Basin/sink
Aug 3, 2026 · Apt PHA
Close - Heat/hot water
Apartment only
Mar 3, 2026 · Apt 2D
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Jan 1, 2024 · Apt 5C
Close - Flooring/stairs
Floor
Aug 23, 2023 · Apt 3F
Close - Unsanitary condition
Mold
Aug 23, 2023 · Apt 3F
Close - Electric
Wiring
Sep 27, 2022 · Apt 6A
Close - Heat/hot water
Entire building
Feb 28, 2022 · Apt 4A
Close - Heat/hot water
Entire building
Feb 27, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2022 · Apt 3A
Close - General
Cooking gas
Feb 25, 2022 · Apt 3A
Close - General
Cooking gas
Feb 25, 2022 · Apt 4F
Close - Heat/hot water
Entire building
Feb 25, 2022 · Apt 4F
Close - Heat/hot water
Entire building
Feb 24, 2022 · Apt 3C
Close - Heat/hot water
Entire building
Feb 24, 2022 · Apt 6D
Close - General
Cooking gas
Feb 24, 2022 · Apt PHC
Close - Heat/hot water
Apartment only
Feb 24, 2022 · Apt PHC
Close - Heat/hot water
Entire building
Feb 24, 2022 · Apt PHB
Close - Heat/hot water
Entire building
Feb 24, 2022 · Apt 4D
Close - Heat/hot water
Apartment only
Feb 24, 2022 · Apt 5C
Close - General
Cooking gas
Feb 24, 2022 · Apt 3C
Close - General
Cooking gas
Feb 24, 2022 · Apt 6D
Close - Appliance
Electric/gas range
Feb 24, 2022 · Apt 5E
Close - Heat/hot water
Entire building
Feb 24, 2022 · Apt 6F
Close - Heat/hot water
Entire building
Feb 24, 2022 · Apt 2B
Close - Appliance
Electric/gas range
Feb 24, 2022 · Apt 2C
Close - Heat/hot water
Apartment only
Feb 24, 2022 · Apt 2C
Close - Heat/hot water
Apartment only
Feb 24, 2022 · Apt 3D
Close - Heat/hot water
Entire building
Feb 23, 2022 · Apt BLDG
Close - Plumbing
Water supply
Feb 23, 2022 · Apt PHA
Close - Heat/hot water
Entire building
Feb 23, 2022 · Apt PHA
Close - Heat/hot water
Entire building
Feb 23, 2022 · Apt 2D
Close - Heat/hot water
Entire building
Feb 22, 2022 · Apt 3A
Close - Heat/hot water
Entire building
Feb 22, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2022 · Apt 3F
Close - Heat/hot water
Entire building
Feb 21, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2022 · Apt BLDG
Close - Electric
Power outage
Aug 3, 2018 · Apt 3B
Close - Heating
Heat related
Jan 20, 2013 · Apt 3E
Close - Electric
Electric-supply
Oct 26, 2006 · Apt 2B
Close - Heating
Heat related
Oct 26, 2006 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D9)
- Year built
- 2008
- Floors
- 7
- Residential units
- 33
- Building area
- 34,395 ft²
- Lot area
- 8,750 ft²
- Zoning
- R6A
- Community board
- 302
- Council district
- 33
- Block / lot
- 56 / 2
- Assessed value
- $2,640,600
- Landmark / historic district
- No
HPD registration #383916, last renewed Aug 4, 2025.
Questions about 109 Gold Street
Who owns 109 Gold Street?
The owner of record in NYC Department of City Planning PLUTO data is 109 Gold Street Owner LLC.
Does 109 Gold Street have violations?
Yes. NYC HPD has recorded 25 housing violations at this property.
Is 109 Gold Street rent stabilized?
NYC Department of Finance tax bills listed 33 rent-stabilized units here in 2024 (about 100% of its 33 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 109 Gold Street built?
City records list 2008 as the year it was built.
How many apartments are in 109 Gold Street?
It has 33 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.