5278 Post Road
Bronx, NY 10471BBL 2-05835-3055Map
Owner of record: 5278 Post Road LLC
5278 Post Road is an elevator apartment building built in 2021 in Bronx, 10471. It has 90 residential units across 7 floors. The owner of record is 5278 Post Road LLC. HPD has recorded 20 housing violations here, most recently on May 7, 2025. 2 of the 20 most recent violations are still open. City tax records listed 88 rent-stabilized apartments here in 2024.
- HPD violations
- 20
- DOB violations
- 9
- ECB violations
- 12
- HPD complaints
- 148
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 20
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper chute door at compactor closet at public hall, 7th story
May 7, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 7f, 7th story, 1st apartment from north at east
Apr 15, 2025 · Apt 7F
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective interior wood door frame at entrance in the bathroom located at apt 7f, 7th story, 1st apartment from north at east
Apr 15, 2025 · Apt 7F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet at public hall, 7th story
Apr 15, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3l, 3rd story, 3rd apartment from south at west
Jan 4, 2025 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 4, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130f degrees at fixtures in the entire apartment located at apt 3l, 3rd story, 3rd apartment from south at west
Jan 4, 2025 · Apt 3L
Closed — Violation dismissed - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 6c, 6th story, 5th apartment from north at east
Aug 17, 2024 · Apt 6C
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maxium of 130 degrees in the entire apartment located at apt 1a, 1st story, 7th apartment from north at east
Mar 27, 2024 · Apt 1A
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds the maxium of 130 degrees in the entire apartment located at apt 3f, 3rd story, 2nd apartment from north at east
Mar 27, 2024 · Apt 3F
Closed — Violation closed
Show 10 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees in the entire apartment located at apt 1a, 1st story, 7th apartment from north at east
Mar 24, 2024 · Apt 1A
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees at fixtures in the kitchen and bathroom located at apt 1a, 1st story, 7th apartment from north at east
Feb 16, 2024 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective baseboard radiator at east wall in the 1st room from east at center located at apt 1a, 1st story, 7th apartment from north at east
Feb 1, 2024 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective baseboard radiator at east wall in the 1st room from east at north located at apt 1a, 1st story, 7th apartment from north at east
Feb 1, 2024 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 1a, 1st story, 7th apartment from north at east
Feb 1, 2024 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective baseboard radiator at east wall in the 1st room from east at south located at apt 1a, 1st story, 7th apartment from north at east
Feb 1, 2024 · Apt 1A
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees in the entire apartment located at apt 1a, 1st story, 7th apartment from north at east
Feb 1, 2024 · Apt 1A
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceeding 130 degrees at sink in kitchen and wash basin in bathroom in the bathroom located at apt 3f, 3rd story, 2nd apartment from north at east
Jan 22, 2024 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7m, 7th story, 1st apartment from south at west
Apr 12, 2023 · Apt 7M
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door lock at boiler room
Apr 12, 2023
Closed — Violation closed
DOB building violations · 9
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - active - Construction other optional
Commissioner's notice of order to stop work immediately due to permit holder withdrawal from job #220491108 (eq-fn). the percentage of work is 0%
Jul 13, 2020
Dob violation - dismissed - Construction other optional
Commissioner's notice of order to stop work immediately due to permit holder withdrawal from job #220395463 (nb). the percentage of work is 0%
Jul 13, 2020
Dob violation - dismissed - Construction other optional
Commissioner's notice of order to stop work immediately due to permit holder withdrawal from job #220457253 (ew-mh). the percentage of work is 0%
Jul 13, 2020
Dob violation - dismissed
ECB violations · 12
- Class - 2
Work contrary to construction drawings at the time of my inspection,i observed the suspended scaffold installed under permit no. x00447088 at exposure#1 had several conditions that were contrary to the approved
Dec 14, 2021
Resolve - Class - 1
Documents to be kept onsite.at the time of my inspection,i observed a 4 point suspended scaffold system installed under permit no. x00600287being operated by four workers at exposure#4,which did not have the fo
Dec 14, 2021
Resolve - Class - 2
Inadequate housekeeping at the time of my inspection,i observed loose bricks,mortar dropping and other loose material accumulating on the supported scaffold at exposure#1,which posed a major hazard to the worke
Dec 14, 2021
Resolve - Class - 2
Pedestrian protection does not meetb code specifications.at the time of my inspection,i observed that the sidewalk shed at exposure#1 had several conditions which posed a manor public hazard:(1)a missing/loose
Dec 14, 2021 · Penalty $625
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments.note new building permit#240275796 with active 4 floor suspended scaffold permit#x00600287 approved drawings show tieback to s
Oct 12, 2021
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments.note new building permit#2402757966327 broadway(lots m erged with 5278 post road)with active scaffold permit#x00447088 approv
Oct 12, 2021 · Penalty $625
Resolve - Class - 1
Failure to maintain safety equipment measures or temporary construction.at time of inspection observed inadequate guardrails and loose netting on several levels at exp #1 and #3 posed severe falling hazard loos
Oct 5, 2021 · Penalty $2,500
Resolve - Class - 2
Inadequate housekeeping (storage near unenclosed perimeter)at time of inspection observed lumber and re-bar being stored near leading edges on garage roofs at exp #3 and piles of materials/debris near window ca
Oct 5, 2021 · Penalty $625
Resolve - Class - 3
Work in progress via dob app#240275796. construction debris accumulations including metal subjects on overhead protection shed at exposure#2(6299 broadway). windows at 2nd fl level at exposure#4 of 6299 broadwa
Aug 18, 2021
Resolve - Class - 2
Failure to maintain/display onsite documents required by chapter 33-pre-construction survey at time of inspection on a proposed 7 story new building currently chipping bedrock requested to see the pre-construct
Jan 4, 2021
Resolve
Show 2 more ↓
- Class - 2
Failure to maintain jobsite fence as required at time of inspection ona proposed 7 story new building currently chipping bedrock observed missing/inadequate site fence of exposure#2 not enclosing site fully as
Jan 4, 2021
Resolve - Class - 2
Bc 3304.7 inadequate means of egress at time of inspection on a proposed 7 story new building currently chipping bedrock observed inadequatemeans of egress into excavated area to exposure#3(broadway)soil was no
Jan 4, 2021
Resolve
Complaints
- Door/window
Window frame
Aug 7, 2026 · Apt 3J
Close - Door/window
Window frame
Aug 5, 2026 · Apt 3J
Close - Heat/hot water
Apartment only
Feb 7, 2026 · Apt 6B
Close - Heat/hot water
Apartment only
Jan 31, 2026 · Apt 2I
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 2I
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 1B
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 6B
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 15, 2025 · Apt 6B
Close - Heat/hot water
Apartment only
Nov 12, 2025 · Apt 4N
Close - Heat/hot water
Apartment only
Nov 10, 2025 · Apt 6B
Close - Heat/hot water
Entire building
Oct 27, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 27, 2025 · Apt 4N
Close - Heat/hot water
Entire building
Oct 26, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 15, 2025 · Apt 4N
Close - Appliance
Electric/gas range
Sep 15, 2025 · Apt 7G
Close - Unsanitary condition
Garbage/recycling storage
Jul 29, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 22, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 14, 2025 · Apt 7F
Close - Plumbing
Basin/sink
Apr 14, 2025 · Apt 7F
Close - Plumbing
Basin/sink
Apr 14, 2025 · Apt 7F
Close - Heat/hot water
Apartment only
Mar 3, 2025 · Apt 7M
Close - Heat/hot water
Apartment only
Mar 2, 2025 · Apt 7M
Close - Heat/hot water
Apartment only
Feb 15, 2025 · Apt 7M
Close - Heat/hot water
Apartment only
Feb 5, 2025 · Apt PH7F
Close - Heat/hot water
Apartment only
Jan 30, 2025 · Apt 1B
Close - Heat/hot water
Entire building
Jan 23, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 13, 2025 · Apt 5C
Close - Heat/hot water
Apartment only
Jan 8, 2025 · Apt 7M
Close - Plumbing
Radiator
Jan 7, 2025 · Apt 3B
Close - Heat/hot water
Apartment only
Jan 7, 2025 · Apt 7M
Close - Heat/hot water
Entire building
Jan 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 7, 2024 · Apt 5C
Close - Heat/hot water
Apartment only
Dec 5, 2024 · Apt 7G
Close - Heat/hot water
Apartment only
Dec 4, 2024 · Apt 7M
Close - Heat/hot water
Apartment only
Dec 3, 2024 · Apt 7M
Close - Heat/hot water
Entire building
Dec 2, 2024 · Apt BLDG
Close - Door/window
Window frame
Dec 2, 2024 · Apt 413
Close - Heat/hot water
Apartment only
Dec 2, 2024 · Apt 3L
Close - Unsanitary condition
Garbage/recycling storage
Oct 16, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 15, 2024 · Apt BLDG
Close - Door/window
Door
Sep 18, 2024 · Apt PH
Close - Door/window
Door
Sep 18, 2024 · Apt PH
Close - Appliance
Electric/gas range
Jul 31, 2024 · Apt 6C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D9)
- Year built
- 2021
- Floors
- 7
- Residential units
- 90
- Building area
- 113,634 ft²
- Lot area
- 25,078 ft²
- Zoning
- R6
- Community board
- 208
- Council district
- 11
- Block / lot
- 5835 / 3055
- Assessed value
- $6,019,200
- Landmark / historic district
- No
HPD registration #228511, last renewed Jul 15, 2025.
Questions about 5278 Post Road
Who owns 5278 Post Road?
The owner of record in NYC Department of City Planning PLUTO data is 5278 Post Road LLC.
Does 5278 Post Road have violations?
Yes. NYC HPD has recorded 20 housing violations at this property.
Is 5278 Post Road rent stabilized?
NYC Department of Finance tax bills listed 88 rent-stabilized units here in 2024 (about 98% of its 90 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 5278 Post Road built?
City records list 2021 as the year it was built.
How many apartments are in 5278 Post Road?
It has 90 residential units and 92 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.