5731 Broadway
Bronx, NY 10463BBL 2-05760-0161Map
Owner of record: 5721 Broadway Development LLC
5731 Broadway is an elevator apartment building built in 2016 in Bronx, 10463. It has 83 residential units across 7 floors. The owner of record is 5721 Broadway Development LLC. HPD has recorded 4 housing violations here, most recently on April 5, 2023. City tax records listed 83 rent-stabilized apartments here in 2024.
- HPD violations
- 4
- DOB violations
- 21
- ECB violations
- 36
- HPD complaints
- 28
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 4
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4k, 4th story, 5th apartment from north at east
Apr 5, 2023 · Apt 4K
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Apr 13, 2019 · Apt 2A
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors ... in the entrance located at apt 2a, 2nd story, 1st apartment from north at east
Jan 29, 2019 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Jan 29, 2019 · Apt 2A
Closed — Violation closed
DOB building violations · 21
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 1, 2021
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 23, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2017
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 13, 2017
Vp*-violation unserved ecb- dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 19, 2017
Dob violation - dismissed
Show 11 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 19, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 19, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 19, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 19, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 19, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 8, 2017
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 14, 2016
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Dec 14, 2016
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 16, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 1, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 1, 2016
Dob violation - dismissed
ECB violations · 36
- Class - 1
Unapproved/unsafe/unsuitable electrical equipment, apparatus, materials, devices, appliances or wiring in use. observed in basement electrical room that the con edison endline box has exposed live energized wir
Feb 24, 2026 · Penalty $4,000
Resolve - Class - 1
Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. observed hole penetrations in mechanical room on 1st floor. inside office space a
Feb 13, 2025 · Penalty $625
Resolve - Class - 1
I noted an odor of gas upon entering the gas meter room, notified con ed, whose technician determined there was a leak on the house side of the shut-off valve. a bypass was installed until leak is repaired. as
Feb 12, 2025 · Penalty $2,500
Resolve - Class - 2
Emergency exit doors do not self-close roof level and throughout building., repair/replace door
Jan 23, 2024
Resolve - Class - 2
Hole penetration/circular cut-out of the fire stopping/sheet rock in the ceiling of the boiler mechanical room, cellar level., repair and/or replace
Jan 23, 2024
Resolve - Class - 2
2-l-10=defective outside communication(phone) dial, but no answer; must repair. (this is a class 2 violation) alarm system in place and operating.
Jan 22, 2024
Resolve - Class - 2
As per one viessman boiler in cellar. condensing drain leaking into boiler and onto floor.
Aug 17, 2022
Resolve - Class - 2
I observed in the electrical equipment room the disconnect switch for meter bank "b" blocked and made inaccessible by the installation of a data server cabinet. this is an immediate hazard as it prevents the ma
May 9, 2022
Resolve - Class - 1
I observed in the electrical equipment room the installation of data equipment other than electrical distribution equipment as the per e.c. no other equipment is permitted. photos taken., comply with ec
May 9, 2022 · Penalty $300
Resolve - Class - 2
Failure to maintain building in active compliant manner. observed in the boiler room in the cellar one boiler for the domestic hot water supply(hot) in operation as the pipes from that boiler were room temp
Jun 5, 2019
Resolve
Show 26 more ↓
- Class - 2
Pressure relief valve leaking, no compound gage on boiler supply piping. correct all violating conditions, submit a certificate of correction.
May 7, 2019
Resolve - Class - 2
67x10;(67,x,10)outside communication not working in car.
Apr 16, 2019 · Penalty $312
Resolve - Class - 2
Unlawful acts.failure to comply with an order of the commissioner.in december 03,2018.a electrical violation was issue to the respondent.the respodent failed to comply with (nyc)electrical code#1250.6y(ecb)#353
Jan 9, 2019 · Penalty $625
Resolve - Class - 2
Failure to properly label disconnects.observed in electrical equipmentroom,several 400 amp service switches with no designation to allow forshut down of electrical systems during normal and or emergency operati
Dec 3, 2018
Resolve - Class - 2
Failure to maintain building in a code-compliant manner. observed on roof for the sixth floor approx three inches of standing water indicating that the roof drain is clogged. *photos taken*. rem: repair and/or
Dec 3, 2018
Resolve - Class - 1
Electrical work without a permit. observed the installation of branch circuit wiring; outlet boxes for switches receptacles, and mc cabling for lighting. photos taken. remedy: comply with code/obtain permits.
Dec 3, 2018 · Penalty $1,600
Resolve - Class - 1
Failure to install ground electrode conductor in accordance with section.observed ground electrode conductor installed for the purpose of jumping across the water meter to allow for continuity of the grounding
Dec 3, 2018 · Penalty $1,200
Resolve - Class - 2
32a,50a,50b,50c-as per class 2 (b254) 28-301.1 failure to maintain. 50a)boiler room door not self-closing. 50b)domestic hot water temperature gauge not installed correctly. 50c)acid neutralizer not maintained #
Jul 23, 2018
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order.note:o bserved site-facade at expo #1 completely enclosed. on 5-3-17 nor/swo issued ecb#35238699k for no sidewalk shed with stop all work 10 ft.
Jun 13, 2017 · Penalty $4,800
Resolve - Class - 1
Sidewalk shed where required. noted: @ time of insp of a 7 story bldg @ roof level approx 70ft in height, construction work in progress. observed that there were no sidewalk shed in place @ exp#1 as require. fa
May 3, 2017 · Penalty $4,800
Resolve - Class - 1
3307.6 sidwalk sheds:missing sections.noted:active s6 massonary work in progress @7th fl at expo#1.the sidwalk shed which covers pedestrian walkway has been removed approx 20foot section causing a hazard to pub
Dec 14, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to maintain guardrails.noted:at 7th floor level workers are not tied off and there are no guardrails in place at elevator shaftway.no guardrails at expo#2&33 causing a hazardous (prhal)stop work"all wor
Dec 14, 2016 · Penalty $1,200
Resolve - Class - 1
Smoking at construction/demolition site.note:worker at 7th floor level w/no hard hat was smokey and cigarette while installing masonary blocks at expo#1 noted:i observed this action worker admitted action when
Dec 14, 2016 · Penalty $2,400
Resolve - Class - 1
Bc3301.1.1 responsibilty for safety: no rebar caps noted: at 7th flr level 6-8 workers installing masonry blocks/bricks.there are no rebar caps at any of the expos and also in other areas of working deck caus
Dec 14, 2016 · Penalty $1,600
Resolve - Class - 1
3301.6.1 design:no design drawing for needle beam platform at expo #4.over ad property obsrved needle beam with no reshores or verticl support to secure system.note:needle beam are head protector located area
Dec 14, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to keep job safe. at time of inspection registered super joseph martino has no record of being on site. the foreman rogello ramos isfilling out lots.following hazards and swo were issued; 1-sws removed
Dec 14, 2016 · Penalty $1,600
Resolve - Class - 1
3301.2 safety measures and standards:no overhead pt.noted:active site masonary work at 7th floor leading edge.at expo#2 there is no overheadprotection in place for property park.at expo#4 the needle beam over
Dec 14, 2016 · Penalty $1,600
Resolve - Class - 1
3301.1.1responsibility for safety:no overhead blocking noted:active 7 story building masonary work at lead edge.there is no overhead protection in place for workers in egress of site expo1 & 3. i'm watching
Dec 14, 2016 · Penalty $1,600
Resolve - Class - 2
3301.1.2 fire code.fire extinguisher note:at 5-6-7 floor of active construction site there were no fire extinguishers on working floors,stairs or noted walls.remedy comply with code.
Dec 14, 2016 · Penalty $400
Resolve - Class - 1
Failure to safeguard all person and property affected by construction operation.noted:workers at 7th floor installing masonary at leading edge-not tied off-approx 6-8 workers no fall arrest system in place caus
Dec 14, 2016 · Penalty $10,000
Resolve - Class - 1
3303.4.4 areas open to persons other than workers.noted:expo#1active loading operations in progress with a "lull"loading the 7th floor masoary operations will back into public walkway with public using walk
Dec 14, 2016 · Penalty $1,600
Resolve - Class - 2
Housekeeping: not maintained. noted: at 6th floor level there is assorted construction debris equipment and trash.housekeeping to be maintained on a daily basis.rmdy: provide adequate housekeeping.
Dec 14, 2016
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements as noted: at time of inspection at an active job site observed excessive amount of debris on 1st fl consisting of combustible wood/wood pallets
Aug 19, 2016 · Penalty $2,400
Resolve - Class - 2
Submittal of construction documents as noted: at time of inspection atan active job site observed new building under construction provide more detail for 1-vertial ()welded to steel lintels at first floor; b-
Aug 19, 2016 · Penalty $400
Resolve - Class - 1
Failure to provide protection at rides of excavation. 45 angle of repose as shown on approved(50 e)plans(pg 102.00)dated 10-6-15 has not been provided for approx 3/4' of south exp#1(along bway). dirt excavation
Mar 1, 2016 · Penalty $2,400
Resolve - Class - 1
Sec. 48 failure to adequately supervise work at a construction site;soas to maintain a safe const site & ensure compliance w/approved construction documents & chapter 33. the following layardous condition was
Mar 1, 2016 · Penalty $1,630
Resolve
Complaints
- Unsanitary condition
Mold
May 26, 2026 · Apt 2L
Close - Appliance
Electric/gas range
May 26, 2026 · Apt 2L
Close - General
Cabinet
May 26, 2026 · Apt 2L
Close - Heat/hot water
Entire building
Apr 5, 2023 · Apt 4K
Close - Heat/hot water
Apartment only
Jan 29, 2022 · Apt 5M
Close - Heat/hot water
Entire building
Dec 27, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 15, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2021 · Apt 6G
Close - Heat/hot water
Entire building
Mar 6, 2021 · Apt 2K
Close - Heat/hot water
Entire building
Feb 18, 2020 · Apt 5N
Close
Show 18 more ↓
- Heat/hot water
Entire building
Jun 4, 2019 · Apt 2A
Close - Heat/hot water
Entire building
Jun 4, 2019 · Apt 6F
Close - Heat/hot water
Entire building
Jun 4, 2019 · Apt 6D
Close - Heat/hot water
Entire building
Jun 3, 2019 · Apt 2A
Close - Heat/hot water
Entire building
Feb 7, 2019 · Apt 2A
Close - Heat/hot water
Entire building
Feb 7, 2019 · Apt 2A
Close - Heat/hot water
Entire building
Feb 1, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2019 · Apt 4L
Close - Heat/hot water
Entire building
Jan 31, 2019 · Apt 4L
Close - Heat/hot water
Entire building
Jan 31, 2019 · Apt 4L
Close - Heat/hot water
Entire building
Jan 30, 2019 · Apt 7A
Close - Heat/hot water
Entire building
Jan 25, 2019 · Apt 2A
Close - Heat/hot water
Entire building
Jan 25, 2019 · Apt 2A
Close - Heat/hot water
Entire building
Jan 19, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 28, 2018 · Apt 5P
Close - Heat/hot water
Entire building
Nov 19, 2018 · Apt 2P
Close - Heat/hot water
Entire building
Nov 3, 2017 · Apt 6M
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2016
- Floors
- 7
- Residential units
- 83
- Building area
- 73,455 ft²
- Lot area
- 21,294 ft²
- Zoning
- R6
- Community board
- 208
- Council district
- 11
- Block / lot
- 5760 / 161
- Assessed value
- $8,461,350
- Landmark / historic district
- No
HPD registration #227732, last renewed Jul 15, 2025.
Questions about 5731 Broadway
Who owns 5731 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is 5721 Broadway Development LLC.
Does 5731 Broadway have violations?
Yes. NYC HPD has recorded 4 housing violations at this property.
Is 5731 Broadway rent stabilized?
NYC Department of Finance tax bills listed 83 rent-stabilized units here in 2024 (about 100% of its 83 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 5731 Broadway built?
City records list 2016 as the year it was built.
How many apartments are in 5731 Broadway?
It has 83 residential units and 85 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.