roofy

5731 Broadway

Bronx, NY 10463BBL 2-05760-0161Map

Owner of record: 5721 Broadway Development LLC

5731 Broadway is an elevator apartment building built in 2016 in Bronx, 10463. It has 83 residential units across 7 floors. The owner of record is 5721 Broadway Development LLC. HPD has recorded 4 housing violations here, most recently on April 5, 2023. City tax records listed 83 rent-stabilized apartments here in 2024.

HPD violations
4
DOB violations
21
ECB violations
36
HPD complaints
28

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Apr 5, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
83
About 100% of the building's 83 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 4

  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4k, 4th story, 5th apartment from north at east

    Apr 5, 2023 · Apt 4K

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west

    Apr 13, 2019 · Apt 2A

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors ... in the entrance located at apt 2a, 2nd story, 1st apartment from north at east

    Jan 29, 2019 · Apt 2A

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east

    Jan 29, 2019 · Apt 2A

    Closed — Violation closed

DOB building violations · 21

  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 1, 2021

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 23, 2017

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2017

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jun 13, 2017

    Vp*-violation unserved ecb- dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 19, 2017

    Dob violation - dismissed
Show 11 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 19, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 19, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 19, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 19, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 19, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 8, 2017

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Dec 14, 2016

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Dec 14, 2016

    Vp*-violation unserved ecb- dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 16, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 1, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 1, 2016

    Dob violation - dismissed

ECB violations · 36

  • Class - 1

    Unapproved/unsafe/unsuitable electrical equipment, apparatus, materials, devices, appliances or wiring in use. observed in basement electrical room that the con edison endline box has exposed live energized wir

    Feb 24, 2026 · Penalty $4,000

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. observed hole penetrations in mechanical room on 1st floor. inside office space a

    Feb 13, 2025 · Penalty $625

    Resolve
  • Class - 1

    I noted an odor of gas upon entering the gas meter room, notified con ed, whose technician determined there was a leak on the house side of the shut-off valve. a bypass was installed until leak is repaired. as

    Feb 12, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Emergency exit doors do not self-close roof level and throughout building., repair/replace door

    Jan 23, 2024

    Resolve
  • Class - 2

    Hole penetration/circular cut-out of the fire stopping/sheet rock in the ceiling of the boiler mechanical room, cellar level., repair and/or replace

    Jan 23, 2024

    Resolve
  • Class - 2

    2-l-10=defective outside communication(phone) dial, but no answer; must repair. (this is a class 2 violation) alarm system in place and operating.

    Jan 22, 2024

    Resolve
  • Class - 2

    As per one viessman boiler in cellar. condensing drain leaking into boiler and onto floor.

    Aug 17, 2022

    Resolve
  • Class - 2

    I observed in the electrical equipment room the disconnect switch for meter bank "b" blocked and made inaccessible by the installation of a data server cabinet. this is an immediate hazard as it prevents the ma

    May 9, 2022

    Resolve
  • Class - 1

    I observed in the electrical equipment room the installation of data equipment other than electrical distribution equipment as the per e.c. no other equipment is permitted. photos taken., comply with ec

    May 9, 2022 · Penalty $300

    Resolve
  • Class - 2

    Failure to maintain building in active compliant manner. observed in the boiler room in the cellar one boiler for the domestic hot water supply(hot) in operation as the pipes from that boiler were room temp

    Jun 5, 2019

    Resolve
Show 26 more ↓
  • Class - 2

    Pressure relief valve leaking, no compound gage on boiler supply piping. correct all violating conditions, submit a certificate of correction.

    May 7, 2019

    Resolve
  • Class - 2

    67x10;(67,x,10)outside communication not working in car.

    Apr 16, 2019 · Penalty $312

    Resolve
  • Class - 2

    Unlawful acts.failure to comply with an order of the commissioner.in december 03,2018.a electrical violation was issue to the respondent.the respodent failed to comply with (nyc)electrical code#1250.6y(ecb)#353

    Jan 9, 2019 · Penalty $625

    Resolve
  • Class - 2

    Failure to properly label disconnects.observed in electrical equipmentroom,several 400 amp service switches with no designation to allow forshut down of electrical systems during normal and or emergency operati

    Dec 3, 2018

    Resolve
  • Class - 2

    Failure to maintain building in a code-compliant manner. observed on roof for the sixth floor approx three inches of standing water indicating that the roof drain is clogged. *photos taken*. rem: repair and/or

    Dec 3, 2018

    Resolve
  • Class - 1

    Electrical work without a permit. observed the installation of branch circuit wiring; outlet boxes for switches receptacles, and mc cabling for lighting. photos taken. remedy: comply with code/obtain permits.

    Dec 3, 2018 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to install ground electrode conductor in accordance with section.observed ground electrode conductor installed for the purpose of jumping across the water meter to allow for continuity of the grounding

    Dec 3, 2018 · Penalty $1,200

    Resolve
  • Class - 2

    32a,50a,50b,50c-as per class 2 (b254) 28-301.1 failure to maintain. 50a)boiler room door not self-closing. 50b)domestic hot water temperature gauge not installed correctly. 50c)acid neutralizer not maintained #

    Jul 23, 2018

    Resolve
  • Class - 1

    Unlawfully continued work while on notice of a stop work order.note:o bserved site-facade at expo #1 completely enclosed. on 5-3-17 nor/swo issued ecb#35238699k for no sidewalk shed with stop all work 10 ft.

    Jun 13, 2017 · Penalty $4,800

    Resolve
  • Class - 1

    Sidewalk shed where required. noted: @ time of insp of a 7 story bldg @ roof level approx 70ft in height, construction work in progress. observed that there were no sidewalk shed in place @ exp#1 as require. fa

    May 3, 2017 · Penalty $4,800

    Resolve
  • Class - 1

    3307.6 sidwalk sheds:missing sections.noted:active s6 massonary work in progress @7th fl at expo#1.the sidwalk shed which covers pedestrian walkway has been removed approx 20foot section causing a hazard to pub

    Dec 14, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to maintain guardrails.noted:at 7th floor level workers are not tied off and there are no guardrails in place at elevator shaftway.no guardrails at expo#2&33 causing a hazardous (prhal)stop work"all wor

    Dec 14, 2016 · Penalty $1,200

    Resolve
  • Class - 1

    Smoking at construction/demolition site.note:worker at 7th floor level w/no hard hat was smokey and cigarette while installing masonary blocks at expo#1 noted:i observed this action worker admitted action when

    Dec 14, 2016 · Penalty $2,400

    Resolve
  • Class - 1

    Bc3301.1.1 responsibilty for safety: no rebar caps noted: at 7th flr level 6-8 workers installing masonry blocks/bricks.there are no rebar caps at any of the expos and also in other areas of working deck caus

    Dec 14, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    3301.6.1 design:no design drawing for needle beam platform at expo #4.over ad property obsrved needle beam with no reshores or verticl support to secure system.note:needle beam are head protector located area

    Dec 14, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to keep job safe. at time of inspection registered super joseph martino has no record of being on site. the foreman rogello ramos isfilling out lots.following hazards and swo were issued; 1-sws removed

    Dec 14, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    3301.2 safety measures and standards:no overhead pt.noted:active site masonary work at 7th floor leading edge.at expo#2 there is no overheadprotection in place for property park.at expo#4 the needle beam over

    Dec 14, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    3301.1.1responsibility for safety:no overhead blocking noted:active 7 story building masonary work at lead edge.there is no overhead protection in place for workers in egress of site expo1 & 3. i'm watching

    Dec 14, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    3301.1.2 fire code.fire extinguisher note:at 5-6-7 floor of active construction site there were no fire extinguishers on working floors,stairs or noted walls.remedy comply with code.

    Dec 14, 2016 · Penalty $400

    Resolve
  • Class - 1

    Failure to safeguard all person and property affected by construction operation.noted:workers at 7th floor installing masonary at leading edge-not tied off-approx 6-8 workers no fall arrest system in place caus

    Dec 14, 2016 · Penalty $10,000

    Resolve
  • Class - 1

    3303.4.4 areas open to persons other than workers.noted:expo#1active loading operations in progress with a "lull"loading the 7th floor masoary operations will back into public walkway with public using walk

    Dec 14, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    Housekeeping: not maintained. noted: at 6th floor level there is assorted construction debris equipment and trash.housekeeping to be maintained on a daily basis.rmdy: provide adequate housekeeping.

    Dec 14, 2016

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements as noted: at time of inspection at an active job site observed excessive amount of debris on 1st fl consisting of combustible wood/wood pallets

    Aug 19, 2016 · Penalty $2,400

    Resolve
  • Class - 2

    Submittal of construction documents as noted: at time of inspection atan active job site observed new building under construction provide more detail for 1-vertial ()welded to steel lintels at first floor; b-

    Aug 19, 2016 · Penalty $400

    Resolve
  • Class - 1

    Failure to provide protection at rides of excavation. 45 angle of repose as shown on approved(50 e)plans(pg 102.00)dated 10-6-15 has not been provided for approx 3/4' of south exp#1(along bway). dirt excavation

    Mar 1, 2016 · Penalty $2,400

    Resolve
  • Class - 1

    Sec. 48 failure to adequately supervise work at a construction site;soas to maintain a safe const site & ensure compliance w/approved construction documents & chapter 33. the following layardous condition was

    Mar 1, 2016 · Penalty $1,630

    Resolve

Complaints

  • Unsanitary condition

    Mold

    May 26, 2026 · Apt 2L

    Close
  • Appliance

    Electric/gas range

    May 26, 2026 · Apt 2L

    Close
  • General

    Cabinet

    May 26, 2026 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Apr 5, 2023 · Apt 4K

    Close
  • Heat/hot water

    Apartment only

    Jan 29, 2022 · Apt 5M

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Aug 15, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 9, 2021 · Apt 6G

    Close
  • Heat/hot water

    Entire building

    Mar 6, 2021 · Apt 2K

    Close
  • Heat/hot water

    Entire building

    Feb 18, 2020 · Apt 5N

    Close
Show 18 more ↓
  • Heat/hot water

    Entire building

    Jun 4, 2019 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Jun 4, 2019 · Apt 6F

    Close
  • Heat/hot water

    Entire building

    Jun 4, 2019 · Apt 6D

    Close
  • Heat/hot water

    Entire building

    Jun 3, 2019 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Feb 7, 2019 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Feb 7, 2019 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2019 · Apt 4L

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2019 · Apt 4L

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2019 · Apt 4L

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2019 · Apt 7A

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2019 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2019 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 4, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 28, 2018 · Apt 5P

    Close
  • Heat/hot water

    Entire building

    Nov 19, 2018 · Apt 2P

    Close
  • Heat/hot water

    Entire building

    Nov 3, 2017 · Apt 6M

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
2016
Floors
7
Residential units
83
Building area
73,455 ft²
Lot area
21,294 ft²
Zoning
R6
Community board
208
Council district
11
Block / lot
5760 / 161
Assessed value
$8,461,350
Landmark / historic district
No

HPD registration #227732, last renewed Jul 15, 2025.

Questions about 5731 Broadway

Who owns 5731 Broadway?

The owner of record in NYC Department of City Planning PLUTO data is 5721 Broadway Development LLC.

Does 5731 Broadway have violations?

Yes. NYC HPD has recorded 4 housing violations at this property.

Is 5731 Broadway rent stabilized?

NYC Department of Finance tax bills listed 83 rent-stabilized units here in 2024 (about 100% of its 83 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 5731 Broadway built?

City records list 2016 as the year it was built.

How many apartments are in 5731 Broadway?

It has 83 residential units and 85 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.