3063 Godwin Terrace
Bronx, NY 10463BBL 2-05703-0192Map
Owner of record: Didyma Realty Bronx LLC
3063 Godwin Terrace is a walk-up apartment building built in 1925 in Bronx, 10463. It has 63 residential units across 5 floors. The owner of record is Didyma Realty Bronx LLC. HPD has recorded 60 housing violations here, most recently on September 14, 2026. 14 of the 50 most recent violations are still open. City tax records listed 19 rent-stabilized apartments here in 2024.
- HPD violations
- 60
- DOB violations
- 8
- ECB violations
- 0
- HPD complaints
- 335
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 60
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1l, 3rd story, 2nd apartment from west at north
Sep 14, 2026 · Apt 1L
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1l, 3rd story, 2nd apartment from west at north
Sep 14, 2026 · Apt 1L
Open — Civ14 mailed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 18, 2025
Open — Not complied with - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 2l, 3rd story, 2nd apartment from north at east , section ''north''
Jun 18, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2l, 3rd story, 2nd apartment from north at east , section ''north''
Jun 18, 2025 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2l, 3rd story, 2nd apartment from north at east , section ''north''
Jun 18, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at water closet in the bathroom located at apt 2l, 3rd story, 2nd apartment from north at east , section ''north''
Jun 18, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at faucets in bathroom and in the kitchen located at apt 2l, 3rd story, 2nd apartment from north at east , section ''north''
Jun 18, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at faucets in kitchen and in the bathroom located at apt 2l, 3rd story, 2nd apartment from north at east , section ''north''
Jun 18, 2025 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2l, 3rd story, 2nd apartment from north at east , section ''north''
Jun 18, 2025 · Apt 2L
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of plastic incloser at store front impeding egress from drop ladder in case of an emergency at 1st fire escape from north
Jun 18, 2025
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 4a, 5th story, 1st apartment from north at east
May 30, 2024 · Apt 4A
Closed — Violation dismissed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3k, 4th story, 1st apartment from west at north
May 30, 2024 · Apt 3K
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 1st room from east at north located at apt 4a, 5th story, 1st apartment from north at east , section ''south'', 1st from east at south
May 30, 2024 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at south located at apt 4a, 5th story, 1st apartment from north at east
May 30, 2024 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 3rd room from east located at apt 4a, 5th story, 1st apartment from north at east
May 30, 2024 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the kitchen located at apt 4a, 5th story, 1st apartment from north at east
May 30, 2024 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall in the entrance located at apt 4a, 5th story, 2nd apartment from north at east , section ''south'', 1st from east at south
May 30, 2024 · Apt 4A
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4j, 5th story, 1st apartment from south at west
May 30, 2024 · Apt 4J
Open — Certification postponment granted - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 4a, 5th story, 1st apartment from north at east
May 30, 2024 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall in the 1st room from east at north located at apt 4a, 5th story, 1st apartment from north at east , section ''south'', 1st from east at south
May 30, 2024 · Apt 4A
Closed — Violation dismissed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4b, 5th story, 2nd apartment from north at east
May 30, 2024 · Apt 4B
Open — Certification postponment granted - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2b, 3rd story, 2nd apartment from north at east
May 30, 2024 · Apt 2B
Open — Certification postponment granted - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1j, 2nd story, 1st apartment from south at west
May 30, 2024 · Apt 1J
Open — Certification postponment granted - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2j, 3rd story, 1st apartment from south at west
May 30, 2024 · Apt 2J
Open — Certification postponment granted - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2g, 3rd story, 1st apartment from north at east
May 30, 2024 · Apt 2G
Open — Certification postponment granted - BHazardous
Repair the roof so that it will not leak at ceiling in the bathroom located at apt 4a, 5th story, 1st apartment from north at east
May 30, 2024 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east at north located at apt 4a, 5th story, 1st apartment from north at east , section ''south'', 1st from east at south
May 30, 2024 · Apt 4A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector inoperable in the entire apartment located at apt 4a, 5th story, 1st apartment from north at east
May 30, 2024 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 4a, 5th story, 1st apartment from north at east
May 30, 2024 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame in the private hallway located at apt 4a, 5th story, 1st apartment from north at east
May 30, 2024 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 4a, 5th story, 1st apartment from north at east
May 30, 2024 · Apt 4A
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4g, 5th story, 1st apartment from north at east
May 30, 2024 · Apt 4G
Open — Certification postponment granted - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Apr 4, 2024 · Apt I
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Apr 4, 2024 · Apt I
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east
Nov 12, 2019 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the door interior in the entrance located at apt 2a, 3rd story, 1st apartment from north at east
Nov 12, 2019 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story, section ''north''
Nov 12, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. , 1st story, section ''north''
Nov 12, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story, section ''south''
Nov 12, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story, section ''south''
Nov 12, 2019
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east
Nov 12, 2019 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story, section ''north''
Nov 12, 2019
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the bathroom located at apt 2a, 3rd story, 1st apartment from north at east
Jun 13, 2019 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east
Apr 17, 2019 · Apt 2A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east
Apr 17, 2019 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall in the foyer located at apt 2a, 3rd story, 1st apartment from north at east
Apr 17, 2019 · Apt 2A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the kitchen , the bathroom located at apt 2a, 3rd story, 1st apartment from north at east
Apr 17, 2019 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from south at west wall in the foyer located at apt 2a, 3rd story, 1st apartment from north at east
Apr 17, 2019 · Apt 2A
Closed — Violation dismissed
DOB building violations · 8
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2023
Jun 23, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Heavy flow
Jul 22, 2026 · Apt 1L
Close - Electric
Lighting
Jul 22, 2026 · Apt 1L
Close - Paint/plaster
Ceiling
Jul 22, 2026 · Apt 1L
Close - Heat/hot water
Apartment only
Jun 17, 2025 · Apt 2L
Close - Heat/hot water
Entire building
May 20, 2025 · Apt BLDG
Close - Door/window
Door frame
Nov 7, 2022 · Apt 2C
Close - Appliance
Electric/gas range
Nov 7, 2022 · Apt 2C
Close - Water leak
Slow leak
Nov 7, 2022 · Apt 2C
Close - Safety
Smoke detector
Feb 18, 2022 · Apt 1I
Close - Safety
Carbon monoxide detector
Feb 18, 2022 · Apt 1I
Close
Show 40 more ↓
- Safety
Window guard broken/missing
Feb 18, 2022 · Apt 1I
Close - Flooring/stairs
Floor
Jul 3, 2019 · Apt B
Close - Paint/plaster
Wall
Jul 3, 2019 · Apt B
Close - Electric
Outlet/switch
Jul 3, 2019 · Apt B
Close - Unsanitary condition
Pests
Jul 3, 2019 · Apt B
Close - Unsanitary condition
Pests
May 10, 2019 · Apt B
Close - Water leak
Slow leak
Apr 14, 2019 · Apt 2A
Close - Water leak
Slow leak
Apr 14, 2019 · Apt 2A
Close - Plumbing
Water supply
Dec 15, 2014 · Apt 4H
Close - Plumbing
Water supply
Dec 15, 2014 · Apt 4C
Close - Plumbing
Water supply
Dec 14, 2014 · Apt 2A
Close - Plumbing
Water supply
Dec 14, 2014 · Apt 3G
Close - Plumbing
Water supply
Dec 14, 2014 · Apt 2A
Close - Plumbing
Water supply
Dec 14, 2014 · Apt BLDG
Close - Plumbing
Water supply
Dec 13, 2014 · Apt 4F
Close - Plumbing
Water supply
Dec 13, 2014 · Apt 2L
Close - Plumbing
Water supply
Dec 13, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2014 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 13, 2014 · Apt 1K
Close - Heat/hot water
Apartment only
Dec 13, 2014 · Apt 2F
Close - Plumbing
Water supply
Dec 13, 2014 · Apt 1K
Close - Plumbing
Water supply
Dec 13, 2014 · Apt 4I
Close - Heating
Heat related
Feb 9, 2014 · Apt 3I
Close - Heating
Heat related
Feb 9, 2014 · Apt 1H
Close - Heating
Heat related
May 9, 2013 · Apt NA
Close - General
Cooking gas
May 9, 2013 · Apt 1K
Close - General
Cooking gas
May 9, 2013 · Apt 2FL
Close - Heating
Heat related
May 9, 2013 · Apt 2FL
Close - Heating
Heat related
May 9, 2013 · Apt 1K
Close - General
Cooking gas
May 8, 2013 · Apt 4E
Close - General
Cooking gas
May 3, 2013 · Apt B
Close - General
Cooking gas
May 3, 2013 · Apt B
Close - General
Cooking gas
May 1, 2013 · Apt 4F
Close - Heating
Heat related
May 1, 2013 · Apt 4F
Close - General
Cooking gas
Apr 29, 2013 · Apt 3A
Close - Heating
Heat related
Apr 29, 2013 · Apt 3A
Close - Heating
Heat related
Apr 29, 2013 · Apt 1H
Close - General
Cooking gas
Apr 29, 2013 · Apt 1H
Close - Plumbing
Basin/sink
Apr 8, 2013 · Apt 1A
Close - Plumbing
Basin/sink
Apr 8, 2013 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1925
- Floors
- 5
- Residential units
- 63
- Building area
- 64,490 ft²
- Lot area
- 10,300 ft²
- Zoning
- R6
- Community board
- 208
- Council district
- 11
- Block / lot
- 5703 / 192
- Assessed value
- $3,080,250
- Landmark / historic district
- No
HPD registration #216291, last renewed Oct 17, 2025.
Questions about 3063 Godwin Terrace
Who owns 3063 Godwin Terrace?
The owner of record in NYC Department of City Planning PLUTO data is Didyma Realty Bronx LLC.
Does 3063 Godwin Terrace have violations?
Yes. NYC HPD has recorded 60 housing violations at this property.
Is 3063 Godwin Terrace rent stabilized?
NYC Department of Finance tax bills listed 19 rent-stabilized units here in 2024 (about 30% of its 63 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3063 Godwin Terrace built?
City records list 1925 as the year it was built.
How many apartments are in 3063 Godwin Terrace?
It has 63 residential units and 70 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.