roofy

2187 New England Thruway

Bronx, NY 10475BBL 2-05263-0183Map

Owner of record: Hp Amanda's Cove HDFC, INC.

2187 New England Thruway is a walk-up apartment building built in 2004 in Bronx, 10475. It has 3 residential units across 3 floors. The owner of record is Hp Amanda's Cove HDFC, INC.. HPD has recorded 57 housing violations here, most recently on June 23, 2025. 5 of the 50 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2018.

HPD violations
57
DOB violations
0
ECB violations
1
HPD complaints
43

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jun 23, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2018
3
About 100% of the building's 3 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 57

  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor. in sanitary conditions in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Jun 23, 2025 · Apt 2

    Closed — Violation closed
  • C

    Provide a safe and adequate supply of electric service to the fixtures at all range and all fixture in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Jun 23, 2025 · Apt 2

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from east at south original violation 17105327 issued 05-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jul 5, 2024 · Apt 2

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective lock and assembly at door in the entrance located at apt 2, 2nd story, 1st apartment from east at south

    Jul 5, 2024 · Apt 2

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Jul 5, 2024 · Apt 2

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jul 5, 2024 · Apt 2

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jul 5, 2024 · Apt 2

    Closed — Violation dismissed
  • B

    Refit entrance door in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south

    Jun 7, 2024 · Apt 2

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective locking mechanism at door in the entrance located at apt 2, 2nd story, 1st apartment from east at south

    Jun 7, 2024 · Apt 2

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... at east wall approximately 10 sq ft in the 1st room from east located at apt 2, 2nd story, 1st apartment from east at south

    Jun 7, 2024 · Apt 2

    Closed — Violation closed
Show 40 more ↓
  • A

    Trace and repair the source and abate the visible mold condition... approx 2 sq ft at ceiling in the 2nd bathroom from east located at apt 2, 2nd story, 1st apartment from east at south

    Oct 30, 2023 · Apt 2

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd bathroom from east located at apt 2, 2nd story, 1st apartment from east at south

    Oct 30, 2023 · Apt 2

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective ... at boiler room, 1st story

    Oct 30, 2023

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... approx 2 sq ft at ceiling in the 2nd bathroom from east located at apt 2, 2nd story, 1st apartment from east at south original violation 16354750 issued 30-oct-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Oct 30, 2023 · Apt 2

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    May 4, 2023 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    May 4, 2023 · Apt 2

    Closed — Violation dismissed
  • C

    Properly repair the broken or defective lock and assembly at building entrance door , 1st story

    Feb 4, 2022

    Closed — Violation dismissed
  • A

    Replace with new the missing safety cover at electrical outlet at public hall, 1st story

    Feb 4, 2022

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective at building entrance , 1st story

    Feb 4, 2022

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceiling, in the entire apartment located at apt 2, 2nd story

    Sep 8, 2021 · Apt 2

    Open — Violation will be reinspected
  • B

    Replace with new the broken or defective rubber gasket door at refrigerator in the kitchen located at apt 2, 2nd story

    Sep 8, 2021 · Apt 2

    Open — Violation will be reinspected
  • B

    Replace with new the broken or defective wash basin in the 2nd bathroom located at apt 2, 2nd story

    Sep 8, 2021 · Apt 2

    Open — Violation will be reinspected
  • B

    Properly repair with similar material the broken or defective wood floor, in the 1st room from east located at apt 2, 2nd story

    Sep 8, 2021 · Apt 2

    Open — Violation will be reinspected
  • B

    Properly secure the loose electric light fixture at ceiling, in the 3rd room from east located at apt 2, 2nd story

    Sep 8, 2021 · Apt 2

    Open — Violation will be reinspected
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jan 7, 2020 · Apt 2

    Closed — Violation dismissed
  • C

    Arrange and make self-closing the doors .. in the entrance located at apt 2, 2nd story, 1st apartment from east at south

    Jan 7, 2020 · Apt 2

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling (approx 1 sq ft) in the bathroom located at apt 2, 2nd story

    Jun 11, 2019 · Apt 2

    Closed — Violation closed
  • B

    Properly repair the broken or defective mechanical air vent in the bathroom located at apt 2, 2nd story

    Jun 11, 2019 · Apt 2

    Closed — Violation dismissed
  • A

    Properly repair the source and abate the evidence of a water leak over ceiling in the 1st room from east at south located at apt 2, 2nd story

    Jun 11, 2019 · Apt 2

    Closed — Violation closed
  • A

    Properly repair the source and abate the evidence of a water leak over ceiling in the 1st room from east at north located at apt 2, 2nd story

    Jun 11, 2019 · Apt 2

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at north located at apt 2, 2nd story

    Jun 11, 2019 · Apt 2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceilings and walls in the entire apartment located at apt 2, 2nd story

    Jun 11, 2019 · Apt 2

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling (approx 1 sq ft) in the bathroom located at apt 2, 2nd story original violation 13117805 issued 11-jun-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jun 11, 2019 · Apt 2

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at south located at apt 2, 2nd story

    Jun 11, 2019 · Apt 2

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room, 1st story

    Jan 31, 2018

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2fl, 2nd story, apartment at west

    Jan 31, 2018 · Apt 2FL

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from south at west

    Jan 10, 2018 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from south at west

    Jan 10, 2018 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from south at west

    Jan 10, 2018 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from south at west

    Jan 10, 2018 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 2, 2nd story, 1st apartment from south at west

    Jan 10, 2018 · Apt 2

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 2, 2nd story, 1st apartment from south at west

    Jan 10, 2018 · Apt 2

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective located at apt 2, 2nd story, 1st apartment from south at west

    Jan 10, 2018 · Apt 2

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 2, 2nd story

    Jun 16, 2017 · Apt 2

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective sheetrock ceiling in the bathroom located at apt 2, 2nd story

    Jun 16, 2017 · Apt 2

    Closed — Violation dismissed
  • B

    Replace with new the missing doors on the sink base cabinet in the kitchen located at apt 2, 2nd story

    Jun 16, 2017 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective connection drain pipe under sink in the kitchen located at apt 2, 2nd story

    Jun 16, 2017 · Apt 2

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). that is missing located at apt 2, 2nd story, 1st apartment from south at west

    Mar 10, 2014 · Apt 2

    Closed — Violation dismissed
  • C

    Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Mar 10, 2014 · Apt 2

    Closed — Violation closed
  • C

    Replace with new the broken or defective upper and lower window glass pane in the 3rd room from north at east located at apt 2, 2nd story, 1st apartment from south at west

    Mar 10, 2014 · Apt 2

    Closed — Violation closed

DOB building violations · 0

No DOB violations on record

ECB violations · 1

  • Class - 1

    New/bldg or open lot occupied w/o a valid c of o. noted: the current temp c of o. co # 200812193t003, expired on 2/14/2007. remedy: obtain avalid c of o.

    Nov 21, 2008

    Resolve

Complaints

  • Water leak

    Heavy flow

    Jul 23, 2025 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Jul 23, 2025 · Apt 2

    Close
  • General

    Cabinet

    Jul 23, 2025 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Jul 23, 2025 · Apt 2

    Close
  • Paint/plaster

    Cabinet

    Jul 23, 2025 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Jan 31, 2018 · Apt 2

    Close
  • Paint/plaster

    Wall

    Jan 31, 2018 · Apt 2

    Close
  • Safety

    Smoke detector

    Jan 31, 2018 · Apt 2

    Close
  • Electric

    No lighting

    Jan 31, 2018 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2018 · Apt 2

    Close
Show 33 more ↓
  • Heat/hot water

    Apartment only

    Jan 29, 2018 · Apt 2FL

    Close
  • Paint/plaster

    Wall

    Jan 22, 2018 · Apt 2

    Close
  • Safety

    Smoke detector

    Jan 22, 2018 · Apt 2

    Close
  • Electric

    Power outage

    Jan 22, 2018 · Apt 2

    Close
  • Electric

    Outlet/switch

    Jan 22, 2018 · Apt 2

    Close
  • Electric

    Lighting

    Jan 22, 2018 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Jan 22, 2018 · Apt 2

    Close
  • Water leak

    Heavy flow

    Jan 8, 2018 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Jan 8, 2018 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Jan 8, 2018 · Apt 3

    Close
  • Heat/hot water

    Entire building

    Jan 8, 2018 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Jan 7, 2017 · Apt 2

    Close
  • Appliance

    Refrigerator

    Nov 1, 2016 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Nov 1, 2016 · Apt 2

    Close
  • General

    Cabinet

    Nov 1, 2016 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Nov 1, 2016 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 10, 2015 · Apt 1

    Close
  • Electric

    No lighting

    Jul 22, 2014 · Apt 2FL

    Close
  • Electric

    No lighting

    Jul 22, 2014 · Apt 2FL

    Close
  • General

    Cooking gas

    Mar 5, 2014 · Apt 2

    Close
  • General

    Windows

    Mar 5, 2014 · Apt 2

    Close
  • Heating

    Heat related

    Mar 5, 2014 · Apt 2

    Close
  • General

    Windows

    Mar 4, 2014 · Apt 2

    Close
  • General

    Windows

    Mar 4, 2014 · Apt 2

    Close
  • Nonconst

    Vermin

    Sep 4, 2012 · Apt 2

    Close
  • Nonconst

    Smoke detector

    Aug 15, 2012 · Apt BLDG

    Close
  • General

    Fire-escape

    Aug 15, 2012 · Apt BLDG

    Close
  • Nonconst

    Smoke detector

    Aug 15, 2012 · Apt BLDG

    Close
  • Nonconst

    Carbon monoxide

    Aug 15, 2012 · Apt BLDG

    Close
  • General

    Locks

    Aug 15, 2012 · Apt BLDG

    Close
  • General

    Fire-escape

    Aug 15, 2012 · Apt BLDG

    Close
  • Nonconst

    Smoke detector

    Aug 15, 2012 · Apt BLDG

    Close
  • Nonconst

    Carbon monoxide

    Aug 15, 2012 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
2004
Floors
3
Residential units
3
Building area
3,618 ft²
Lot area
3,700 ft²
Zoning
R4
Community board
212
Council district
12
Block / lot
5263 / 183
Assessed value
$59,460
Landmark / historic district
No

HPD registration #224604, last renewed Jul 28, 2025.

Questions about 2187 New England Thruway

Who owns 2187 New England Thruway?

The owner of record in NYC Department of City Planning PLUTO data is Hp Amanda's Cove HDFC, INC..

Does 2187 New England Thruway have violations?

Yes. NYC HPD has recorded 57 housing violations at this property.

Is 2187 New England Thruway rent stabilized?

NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2018 (about 100% of its 3 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2187 New England Thruway built?

City records list 2004 as the year it was built.

How many apartments are in 2187 New England Thruway?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.