655 East 234 Street
Bronx, NY 10466BBL 2-04995-0022Map
Owner of record: Ripple Realty Corp
655 East 234 Street is a walk-up apartment building built in 1928 in Bronx, 10466. It has 54 residential units across 5 floors. The owner of record is Ripple Realty Corp. HPD has recorded 1,059 housing violations here, most recently on October 9, 2026. 50 of the 50 most recent violations are still open. City tax records listed 50 rent-stabilized apartments here in 2024.
- HPD violations
- 1,059
- DOB violations
- 30
- ECB violations
- 0
- HPD complaints
- 812
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,059
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from west at north wall, 1st door frame from west at north wall in the foyer located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). east wall in the 3rd room from north at west located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 2nd room from north located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the private hallway located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, east wall, ceiling in the foyer located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, ceiling, south wall in the 3rd room from north at west located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from south at west wall in the 3rd room from north at west located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall in the 2nd room from north located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, east wall, ceiling in the private hallway located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling in the kitchen located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall, and east wall in the kitchen located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective metal base cabinets at sink in the kitchen located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entrance located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from south at west wall in the 3rd room from north at west located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at south wall, 1st window frame from east at south wall in the 3rd room from north at west located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, south wall, ceiling in the 3rd room from north at west located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the foyer located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at west wall in the foyer located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from east at south wall in the bathroom located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the foyer located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at east wall in the foyer located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, east wall in the bathroom located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling, west wall in the private hallway located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 3rd closet from south at west wall door, 2nd closet from south at west wall door, 1st closet from south at west wall door, 3rd closet from south at west wall door frame, 2nd closet from south at west wall door frame, 1st closet from south at west wall door frame in the private hallway located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall in the 3rd room from north at west located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall in the 2nd room from north located at apt c1, 3rd story, 1st apartment from east at south
Oct 9, 2026 · Apt C1
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt d6, 4th story, 1st apartment from north at east
Oct 8, 2026 · Apt D6
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt d6, 4th story, 1st apartment from north at east
Oct 8, 2026 · Apt D6
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the bathroom located at apt d6, 4th story, 1st apartment from north at east
Oct 8, 2026 · Apt D6
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling equal to 4 sq ft. in the bathroom located at apt d6, 4th story, 1st apartment from north at east
Oct 8, 2026 · Apt D6
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the 1st room from east located at apt d6, 4th story, 1st apartment from north at east
Oct 8, 2026 · Apt D6
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt d6, 4th story, 1st apartment from north at east
Oct 8, 2026 · Apt D6
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor around radiator in the kitchen located at apt d6, 4th story, 1st apartment from north at east
Oct 8, 2026 · Apt D6
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt d6, 4th story, 1st apartment from north at east
Oct 8, 2026 · Apt D6
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt d6, 4th story, 1st apartment from north at east
Oct 8, 2026 · Apt D6
Open — Notice of issuance sent to tenant - BHazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt b6, 2nd story, 1st apartment from north at east , section ''center''
Sep 22, 2026 · Apt B6
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt b6, 2nd story, 1st apartment from north at east , section ''center''
Sep 22, 2026 · Apt B6
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt b6, 2nd story, 1st apartment from north at east , section ''center''
Sep 22, 2026 · Apt B6
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling aprox 10 sq feet in the bathroom located at apt b6, 2nd story, section ''center''
Sep 22, 2026 · Apt B6
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt b6, 2nd story, section ''center''
Sep 22, 2026 · Apt B6
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt b6, 2nd story, section ''center''
Sep 22, 2026 · Apt B6
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 10, 2026
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt a2, 1st story, 2nd apartment from east at south
Jul 1, 2026 · Apt A2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt a2, 1st story, 2nd apartment from east at south
Jul 1, 2026 · Apt A2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective door in the kitchen located at apt a1, 1st story, 1st apartment from east at south
Jul 1, 2026 · Apt A1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt a1, 1st story, 1st apartment from east at south
Jul 1, 2026 · Apt A1
Open — Nov sent out
DOB building violations · 30
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 22, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active
Show 20 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Garbage/recycling storage
Oct 16, 2026 · Apt BLDG
Open - Appliance
Refrigerator
Oct 8, 2026 · Apt C1
Close - Unsanitary condition
Pests
Oct 8, 2026 · Apt C1
Close - Door/window
Window frame
Oct 8, 2026 · Apt C1
Close - Plumbing
Steam pipe/riser
Oct 8, 2026 · Apt C1
Close - Door/window
Door
Oct 8, 2026 · Apt C1
Close - General
Bell/buzzer/intercom
Oct 8, 2026 · Apt C1
Close - Paint/plaster
Ceiling
Oct 8, 2026 · Apt C1
Close - Appliance
Electric/gas range
Oct 8, 2026 · Apt C1
Close - Plumbing
Basin/sink
Oct 8, 2026 · Apt C1
Close
Show 40 more ↓
- Paint/plaster
Wall
Oct 8, 2026 · Apt B1
Open - Paint/plaster
Ceiling
Oct 6, 2026 · Apt A3
Close - Unsanitary condition
Mold
Oct 6, 2026 · Apt A3
Close - Water leak
Heavy flow
Oct 6, 2026 · Apt A3
Close - General
Janitor/super
Oct 6, 2026 · Apt B8
Close - Unsanitary condition
Pests
Oct 6, 2026 · Apt B8
Close - Appliance
Electric/gas range
Oct 6, 2026 · Apt B8
Close - Appliance
Refrigerator
Oct 6, 2026 · Apt B8
Close - Water leak
Slow leak
Sep 29, 2026 · Apt B6
Close - Paint/plaster
Ceiling
Sep 29, 2026 · Apt B6
Close - Water leak
Heavy flow
Sep 16, 2026 · Apt B6
Close - Unsanitary condition
Pests
Sep 2, 2026 · Apt A4
Close - Paint/plaster
Wall
Sep 2, 2026 · Apt A4
Close - Flooring/stairs
Floor
Sep 2, 2026 · Apt A4
Close - Appliance
Electric/gas range
Sep 2, 2026 · Apt A4
Close - Paint/plaster
Wall
Sep 2, 2026 · Apt A4
Close - Paint/plaster
Wall
Sep 2, 2026 · Apt A4
Close - Unsanitary condition
Mold
Jun 17, 2026 · Apt A1
Close - Plumbing
Water supply
Jun 17, 2026 · Apt A1
Close - General
Cabinet
Jun 17, 2026 · Apt A1
Close - Paint/plaster
Ceiling
Jun 17, 2026 · Apt A1
Close - Paint/plaster
Wall
Jun 17, 2026 · Apt A4
Close - Flooring/stairs
Floor
Jun 17, 2026 · Apt A4
Close - Paint/plaster
Wall
Jun 17, 2026 · Apt A4
Close - Door/window
Door
Jun 17, 2026 · Apt A4
Close - Unsanitary condition
Mold
Jun 17, 2026 · Apt A4
Close - Safety
Smoke detector
May 31, 2026 · Apt C2
Close - Flooring/stairs
Floor
May 31, 2026 · Apt C2
Close - Water leak
Slow leak
May 31, 2026 · Apt C2
Close - Electric
Wiring
May 31, 2026 · Apt C2
Close - Plumbing
Water supply
May 31, 2026 · Apt C2
Close - Electric
Lighting
May 31, 2026 · Apt C2
Close - Electric
Outlet/switch
May 31, 2026 · Apt C2
Close - Unsanitary condition
Mold
May 31, 2026 · Apt C2
Close - Paint/plaster
Ceiling
May 31, 2026 · Apt C2
Close - Water leak
Heavy flow
May 31, 2026 · Apt C2
Close - Unsanitary condition
Pests
May 31, 2026 · Apt C2
Close - Plumbing
Water supply
May 26, 2026 · Apt A1
Close - Unsanitary condition
Mold
May 26, 2026 · Apt A1
Close - Plumbing
Basin/sink
May 26, 2026 · Apt A1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1928
- Floors
- 5
- Residential units
- 54
- Building area
- 45,205 ft²
- Lot area
- 14,250 ft²
- Zoning
- R6
- Community board
- 212
- Council district
- 11
- Block / lot
- 4995 / 22
- Assessed value
- $1,127,700
- Landmark / historic district
- No
HPD registration #205247, last renewed May 27, 2025.
Questions about 655 East 234 Street
Who owns 655 East 234 Street?
The owner of record in NYC Department of City Planning PLUTO data is Ripple Realty Corp.
Does 655 East 234 Street have violations?
Yes. NYC HPD has recorded 1,059 housing violations at this property.
Is 655 East 234 Street rent stabilized?
NYC Department of Finance tax bills listed 50 rent-stabilized units here in 2024 (about 93% of its 54 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 655 East 234 Street built?
City records list 1928 as the year it was built.
How many apartments are in 655 East 234 Street?
It has 54 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.