646 East 231 Street
Bronx, NY 10466BBL 2-04833-0064Map
Owner of record: 318 Realty Co
646 East 231 Street is a walk-up apartment building built in 1922 in Bronx, 10466. It has 65 residential units across 5 floors. The owner of record is 318 Realty Co. HPD has recorded 1,431 housing violations here, most recently on September 26, 2026. 22 of the 50 most recent violations are still open. City tax records listed 63 rent-stabilized apartments here in 2024.
- HPD violations
- 1,431
- DOB violations
- 28
- ECB violations
- 20
- HPD complaints
- 1,493
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,431
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchen located at apt 2c, 2nd story, 1st apartment from south at west
Sep 26, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Sep 26, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules .missing in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Sep 26, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 1e, 1st story, 1st apartment from east at south
Sep 22, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles. in the 1st room from east located at apt 1e, 1st story, 1st apartment from east at south
Sep 22, 2026 · Apt 1E
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 1e, 1st story, 1st apartment from east at south
Sep 22, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective closet door in the 1st room from east located at apt 1e, 1st story, 1st apartment from east at south
Sep 22, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective door closet in the 1st room from east located at apt 1e, 1st story, 1st apartment from east at south
Jul 13, 2026 · Apt 1E
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles. in the 1st room from east located at apt 1e, 1st story, 1st apartment from east at south
Jul 13, 2026 · Apt 1E
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 1e, 1st story, 1st apartment from east at south
Jul 13, 2026 · Apt 1E
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
Jun 25, 2026 · Apt 2C
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective sink base cabinet thru-out in the kitchen located at apt 2c, 2nd story, 1st apartment from south at west
Jun 25, 2026 · Apt 2C
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchen located at apt 2c, 2nd story, 1st apartment from south at west
Jun 25, 2026 · Apt 2C
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
Jun 25, 2026 · Apt 2C
Open — Civ14 mailed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes wooden planks at balcony at 1st fire escape from north, 5th story
May 18, 2026
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration 220 volt electrical outlet for washer dryer in the kitchen located at apt 2f, 2nd story, 1st apartment from west at north , section ''650''
May 18, 2026 · Apt 2F
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north , section ''650''
May 18, 2026 · Apt 2F
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north , section ''650''
May 18, 2026 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 2f, 2nd story, 1st apartment from west at north , section ''650''
May 18, 2026 · Apt 2F
Open — Not complied with - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq ft on all walls and ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north , section ''650''
May 18, 2026 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective caulking around the tub in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north , section ''650''
May 18, 2026 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls and ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north , section ''650''
May 18, 2026 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north , section ''650''
May 18, 2026 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north at east located at apt 2f, 2nd story, 1st apartment from west at north , section ''650''
May 18, 2026 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Jan 23, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Replace with new the missing entrance door in the bathroom located at apt 5e, 5th story, 2nd apartment from west at north
Nov 25, 2025 · Apt 5E
Closed — Violation dismissed - BHazardous
Replace with new the missing radiator at east wall in the 3rd room from north located at apt 5e, 5th story, 2nd apartment from west at north
Nov 25, 2025 · Apt 5E
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures at the wash basin and the bath tub in the bathroom located at apt 5e, 5th story, 2nd apartment from west at north
Nov 25, 2025 · Apt 5E
Closed — Violation dismissed - BHazardous
Replace with new the missing radiator at north wall in the 1st room from north at west located at apt 5e, 5th story, 2nd apartment from west at north
Nov 25, 2025 · Apt 5E
Closed — Violation dismissed - BHazardous
Replace with new the missing radiator at north wall in the 1st room from north at east located at apt 5e, 5th story, 2nd apartment from west at north
Nov 25, 2025 · Apt 5E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 5e, 5th story, 2nd apartment from west at north
Nov 25, 2025 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4e, 4th story, 2nd apartment from west at north
Nov 22, 2025 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4e, 4th story, 2nd apartment from west at north
Nov 22, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the 3rd room from north at east located at apt 4e, 4th story, 2nd apartment from west at north
Nov 22, 2025 · Apt 4E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 3rd room from north at east located at apt 4e, 4th story, 2nd apartment from west at north
Nov 22, 2025 · Apt 4E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from north at east located at apt 4e, 4th story, 2nd apartment from west at north
Nov 22, 2025 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 1st room from north at east located at apt 4e, 4th story, 2nd apartment from west at north
Nov 22, 2025 · Apt 4E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4e, 4th story, 2nd apartment from west at north
Nov 22, 2025 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 4e, 4th story, 2nd apartment from west at north
Nov 22, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures at kitchen and bathroom in the entire apartment located at apt 4e, 4th story, 2nd apartment from west at north
Nov 22, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10sqft at ceiling in the bathroom located at apt 4e, 4th story, 2nd apartment from west at north original violation 18425867 issued 22-nov-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Nov 22, 2025 · Apt 4E
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sqft at ceiling in the bathroom located at apt 4e, 4th story, 2nd apartment from west at north
Nov 22, 2025 · Apt 4E
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening chain and padlock at gate at fire passage way
Nov 15, 2025
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 5e, 5th story, 2nd apartment from west at north
Nov 7, 2025 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the private hallway located at apt 5e, 5th story, 2nd apartment from west at north
Nov 7, 2025 · Apt 5E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 5e, 5th story, 2nd apartment from west at north , section ''650''
Nov 1, 2025 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system no telephone number provided at public hall, 1st story
Nov 1, 2025
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5e, 5th story, 2nd apartment from west at north , section ''650''
Nov 1, 2025 · Apt 5E
Closed — Violation dismissed - BHazardous
Replace the broken or defective missing radiator in the 3rd room from north located at apt 5e, 5th story, 2nd apartment from west at north , section ''650''
Nov 1, 2025 · Apt 5E
Closed — Violation dismissed - BHazardous
Replace the broken or defective missing radiator in the 2nd room from north located at apt 5e, 5th story, 2nd apartment from west at north , section ''650''
Nov 1, 2025 · Apt 5E
Closed — Violation dismissed
DOB building violations · 28
- Construction other optional
Noted loose capstones at 650 e 231, bulging facade exp1/2 side, and cracking at various sides.
Aug 23, 2025
Dob violation - active - Immediate emergency anythingoptional
Install 100 linear feet of sidewalk shed, broken down as follow: 30 li near feet over the front entrance of 650, 70 linear feet wrapping the the expo #1/2 corner
Aug 23, 2025
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2023
Jun 23, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Mar 18, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 17, 2019
Dob violation - dismissed
Show 18 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 23, 2019
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)
Feb 16, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 16, 2016
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years(2015)
Jun 1, 2016
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years
Jun 1, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 21, 2014
Dob violation - dismissed - Failure to submit eer none
Failure to submit an energy efficiency report (eer) per ad. code sec. 28-308.4
Dec 31, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 20
- Class - 1
Note over entrance of 650 1 x 3ft capstone is partially dislodged and in danger of falling. also noted on exp1/2 corner that facade was bulginsg with separation noted. also cracking noted front exp 1 left side
Aug 23, 2025 · Penalty $2,500
Resolve - Class - 2
Failure to maintain building in code compliant manner. i observed missing mortar, rusted window lintels and a step crack at exposure #1/2 of the front brick facade, repair and/or replace; submit the certificate
Jul 26, 2024 · Penalty $625
Active - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35369907x issued on 10/04/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permit. remedy: comply w/comm's order &/or file
Jan 27, 2020 · Penalty $6,250
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35369907x issued on 10/04/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Dec 13, 2019 · Penalty $6,250
Active - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35369907x issued on 10/04/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Oct 7, 2019
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35369907x issued on 10/04/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Aug 22, 2019
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35369907x issued on 10/04/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Jun 29, 2019 · Penalty $2,500
Active - Class - 2
Unapproved/unsafe/unsuitable electrical equipment,apparatus,materials,devices,appliances or wiring in use. observed 1 light fixture is beingfed from single strand electrical wires/conductors through holes drill
Apr 26, 2019 · Penalty $830
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation #35369907x issued on 10/24/18 7 to file a cert. of correctionpursuant to 28-201.1&1rcny 102-01.rem:comply with commissioner's order
Apr 12, 2019 · Penalty $6,250
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#35369907x issued on 10/24/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi
Feb 13, 2019 · Penalty $1,250
Active
Show 10 more ↓
- Class - 1
Work without a permit.noted:illegal work observed at basement level;partions erected next to super:apartment creating 2 separate sleeping quarters,also observed full kitchen with elecyric stove at common hallwa
Oct 24, 2018 · Penalty $800
Active - Class - 1
Occupancy contrary to building department records.noted:at basement observed 2 sleeping quarters at southwest corner with beds and personal belongings with no natural light,inadequate ventilation and no seconda
Oct 24, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in a code-compliant manner.noted:at basement level observed combustible & misc items stored under and around gas meters and electric meters throughout entire basement creating a fir
Oct 24, 2018 · Penalty $313
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. on aug 17 2016 at 4:45pm at 646 east 231st in the cellar i observed a gas line going through a sink cabinet w/a gas valve, and flex in the cabinet supplyin
Aug 17, 2016 · Penalty $1,000
Active - Class - 2
Failure to maintain bldg. noted: found metal stair stringers at 4th & 5th floors rusted,marble treads in danger of dislodged. remedy: repair defects forthwith,maintain bldg.
Jan 15, 2016
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. noted: bldg fire escapes are in deteriorating conditions,oxidation has set in causing themetal to beging flaking,leaking the fire escapes in a weaken & defecti
Feb 20, 2014 · Penalty $250
Active - Hazardous
Exit passageway or corridor total obstruction at s/w fire corridor the alley has been closed by a 8'-0" high plywood fence & door padlocked cutting the flow of egress from both bldg. remedy:remove padlocked doo
May 3, 2006 · Penalty $1,200
Resolve - Hazardous
Exit passageway or corridor total obstruction at south west fire corridor the alley has been closed by a 8' high plywood fence & door padlocked shut. cutting of egress from both bldg. fire escapes at rear. reme
Dec 16, 2005 · Penalty $480
Active - Hazardous
Failure to maintain. defect is: courtyard at front of building is cracked buldging and sinking in various locations. remedy: remove defective masonary and make all repairs
Jul 20, 1993
Resolve - Non-hazardous
Failure to maintain. railing missing at first story step entrance 650-646 east 231 street. remedy: provide railing at first steps entrance 650-646 east 231 street.
Apr 19, 1993
Resolve
Complaints
- Heat/hot water
Entire building
Sep 25, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
Sep 14, 2026 · Apt 1E
Close - Flooring/stairs
Floor
Sep 14, 2026 · Apt 1E
Close - Plumbing
Toilet
Sep 14, 2026 · Apt 1E
Close - Unsanitary condition
Pests
Sep 14, 2026 · Apt 1E
Close - Heat/hot water
Entire building
Sep 11, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
Sep 8, 2026 · Apt 1E
Close - Plumbing
Basin/sink
Sep 8, 2026 · Apt 1E
Close - Electric
No lighting
Sep 8, 2026 · Apt 1E
Close - Unsanitary condition
Pests
Sep 8, 2026 · Apt 1E
Close
Show 40 more ↓
- Flooring/stairs
Floor
Sep 8, 2026 · Apt 1E
Close - Paint/plaster
Wall
Sep 8, 2026 · Apt 1E
Close - Plumbing
Toilet
Sep 8, 2026 · Apt 1E
Close - Door/window
Window frame
Sep 8, 2026 · Apt 1E
Close - Door/window
Door frame
Sep 8, 2026 · Apt 1E
Close - Paint/plaster
Ceiling
Sep 8, 2026 · Apt 1E
Close - Electric
Lighting
Jul 7, 2026 · Apt 1E
Close - Water leak
Heavy flow
Jul 7, 2026 · Apt 1E
Close - Paint/plaster
Ceiling
Jul 7, 2026 · Apt 1E
Close - Unsanitary condition
Mold
Jun 22, 2026 · Apt 2C
Close - Plumbing
Basin/sink
Apr 23, 2026 · Apt 5B
Close - Plumbing
Basin/sink
Apr 23, 2026 · Apt 5B
Close - Paint/plaster
Wall
Apr 23, 2026 · Apt 5B
Close - Plumbing
Bathtub/shower
Apr 23, 2026 · Apt 5B
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Feb 13, 2026 · Apt 2F
Close - Paint/plaster
Wall
Feb 13, 2026 · Apt 2F
Close - Plumbing
Bathtub/shower
Feb 13, 2026 · Apt 2F
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 31, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 21, 2026 · Apt 1C
Close - Paint/plaster
Wall
Dec 18, 2025 · Apt 4D
Close - Paint/plaster
Wall
Dec 18, 2025 · Apt 4D
Close - Unsanitary condition
Pests
Dec 18, 2025 · Apt 4D
Close - Flooring/stairs
Floor
Dec 18, 2025 · Apt 4D
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt BLDG
Close - Plumbing
Water supply
Nov 24, 2025 · Apt 5E
Close - Heat/hot water
Apartment only
Nov 24, 2025 · Apt 5E
Close - Plumbing
Radiator
Nov 24, 2025 · Apt 5E
Close - Plumbing
Water supply
Nov 21, 2025 · Apt BLDG
Close - Plumbing
Water supply
Nov 21, 2025 · Apt 1E
Close - Water leak
Slow leak
Nov 18, 2025 · Apt 4E
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 11, 2026 | $3,300,000 | Rentals - walkup apartments | 65 |
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1922
- Floors
- 5
- Residential units
- 65
- Building area
- 53,860 ft²
- Lot area
- 17,230 ft²
- Zoning
- R6A
- Community board
- 212
- Council district
- 11
- Block / lot
- 4833 / 64
- Assessed value
- $1,778,400
- Landmark / historic district
- No
HPD registration #205193, last renewed Aug 28, 2025.
Questions about 646 East 231 Street
Who owns 646 East 231 Street?
The owner of record in NYC Department of City Planning PLUTO data is 318 Realty Co.
Does 646 East 231 Street have violations?
Yes. NYC HPD has recorded 1,431 housing violations at this property.
Is 646 East 231 Street rent stabilized?
NYC Department of Finance tax bills listed 63 rent-stabilized units here in 2024 (about 97% of its 65 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 646 East 231 Street built?
City records list 1922 as the year it was built.
How many apartments are in 646 East 231 Street?
It has 65 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.