633 East 224 Street
Bronx, NY 10466BBL 2-04826-0040Map
Owner of record: Z K Holding Corp
633 East 224 Street is a walk-up apartment building built in 1928 in Bronx, 10466. It has 21 residential units across 4 floors. The owner of record is Z K Holding Corp. HPD has recorded 166 housing violations here, most recently on August 28, 2026. 37 of the 50 most recent violations are still open. City tax records listed 20 rent-stabilized apartments here in 2024.
- HPD violations
- 166
- DOB violations
- 2
- ECB violations
- 2
- HPD complaints
- 297
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 166
- BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3d, 3rd story, 1st apartment from east at south
Aug 28, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1e, 1st story, 1st apartment from south at west
Aug 28, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2d, 2nd story, 1st apartment from east at south
Aug 26, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Properly secure the loose countertop at north wall in the kitchen located at apt 2d, 2nd story, 1st apartment from east at south
Aug 26, 2026 · Apt 2D
Open — Civ14 mailed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from east at south
Aug 26, 2026 · Apt 2D
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 2nd story, 1st apartment from east at south
Aug 26, 2026 · Apt 2D
Open — Civ14 mailed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from east at south
Aug 26, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2d, 2nd story, 1st apartment from east at south
Aug 26, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2d, 2nd story, 1st apartment from east at south
Aug 26, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3a, 3rd story, 1st apartment from west at north
Aug 5, 2026 · Apt 3A
Open — Nov sent out
Show 40 more ↓
- BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1d, 1st story, 2nd apartment from north at east
Aug 5, 2026 · Apt 1D
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1c, 1st story, 1st apartment from north at east
Aug 5, 2026 · Apt 1C
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of heat on at riser at west wall in the kitchen located at bsmt-apt 1e, 1st story, 1st bsmt-apt from south at west
Jun 29, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at bsmt-apt 1e, 1st story, 1st bsmt-apt from south at west
Jun 29, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at bsmt-apt 1e, 1st story, 1st bsmt-apt from south at west
Jun 29, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
May 27, 2026
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
May 27, 2026
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, south wall, east wall in the 3rd room from north located at apt 2a, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2a, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall in the foyer located at apt 2a, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from south at west wall in the 3rd room from north located at apt 2a, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 2nd closet from north at east wall door in the private hallway located at apt 2a, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 2A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, west wall in the 3rd room from north located at apt 2a, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 2A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the private hallway located at apt 2a, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the 1st room from north located at apt 2a, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 2A
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall, east wall in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall in the 1st room from north located at apt 2a, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, west wall in the 1st room from north located at apt 2a, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 2A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 2a, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 2A
Open — Nov certified late - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 2A
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 2A
Open — Nov certified late - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiliing in the bathroom located at apt 1e, 1st story, 1st apartment from south at west
Sep 16, 2025 · Apt 1E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1e, 1st story, 1st apartment from south at west
Sep 16, 2025 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective plywood floor covered by vinyl floor tiles in the private hallway located at apt 1e, 1st story, 1st apartment from south at west
Sep 16, 2025 · Apt 1E
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of construction material (sheet rock) at public hall, 1st story
May 19, 2025
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2e, 2nd story, 2nd apartment from east at south
Apr 29, 2025 · Apt 2E
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2e, 2nd story, 2nd apartment from east at south
Apr 29, 2025 · Apt 2E
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft. at ceiling, north wall and around window casing in the bathroom located at apt 2d, 2nd story, 1st apartment from east at south
Jan 15, 2025 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 2nd story, 1st apartment from east at south
Jan 15, 2025 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees, temperature found at 138 degrees at all fixtures kitchen and bathroom in the entire apartment located at apt 2d, 2nd story, 1st apartment from east at south
Jan 15, 2025 · Apt 2D
Open — Nov certified late - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2d, 2nd story, 1st apartment from east at south
Jan 15, 2025 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective heavy duty mortise lock at door in the entrance located at apt 2d, 2nd story, 1st apartment from east at south
Jan 15, 2025 · Apt 2D
Open — Nov certified late - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing
Jan 15, 2025
Open — Nov certified late - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft. at ceiling, north wall and around window casing in the bathroom located at apt 2d, 2nd story, 1st apartment from east at south original violation 17623518 issued 15-jan-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jan 15, 2025 · Apt 2D
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2d, 2nd story, 1st apartment from south at west
Nov 4, 2024 · Apt 2D
Open — Invalid certification - ANon-hazardous
Refit door to frame in the 2nd room from north located at apt 2d, 2nd story, 1st apartment from south at west
Nov 4, 2024 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door lock in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west
Nov 4, 2024 · Apt 2D
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective floor ceramic tile in the kitchen located at apt 2d, 2nd story, 1st apartment from south at west
Nov 4, 2024 · Apt 2D
Open — Nov sent out
DOB building violations · 2
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 2
- Class - 2
Found exposed wiring at burner, g lass gauge guards missing, dar valve missing on oil pump.
Jun 22, 2023
Resolve - Class - 2
B254,38,50,50a,50b. 50-boiler room doro not fire rated; 50a-need check valve on backflow preventer; 50b-need to install pigtail (brass) on all controls (can't have 2 controls coming off 1 pigtail)
Apr 4, 2018
Resolve
Complaints
- Plumbing
Basin/sink
Oct 21, 2026 · Apt 2D
Close - Unsanitary condition
Mold
Oct 21, 2026 · Apt 2D
Close - Electric
Lighting
Oct 21, 2026 · Apt 2D
Close - Electric
Wiring
Oct 21, 2026 · Apt 2D
Close - Unsanitary condition
Pests
Oct 21, 2026 · Apt 2D
Close - Appliance
Electric/gas range
Oct 21, 2026 · Apt 2D
Close - Plumbing
Radiator
Oct 21, 2026 · Apt 2D
Close - Appliance
Electric/gas range
Jul 13, 2026 · Apt 2D
Close - Plumbing
Basin/sink
Jul 13, 2026 · Apt 2D
Close - Plumbing
Radiator
Jul 13, 2026 · Apt 2D
Close
Show 40 more ↓
- Water leak
Slow leak
Jul 13, 2026 · Apt 2D
Close - Unsanitary condition
Pests
Jul 13, 2026 · Apt 2D
Close - Heat/hot water
Apartment only
Jun 28, 2026 · Apt 1E
Close - Water leak
Slow leak
Feb 10, 2026 · Apt 2A
Close - Water leak
Heavy flow
Feb 10, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt WHOLEA
Close - Heat/hot water
Apartment only
Feb 2, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt 2A
Close - Water leak
Slow leak
Sep 12, 2025 · Apt 1E
Close - Paint/plaster
Ceiling
Sep 12, 2025 · Apt 1E
Close - Flooring/stairs
Floor
Sep 12, 2025 · Apt 1E
Close - Paint/plaster
Ceiling
Sep 12, 2025 · Apt 1E
Close - Unsanitary condition
Mold
Sep 12, 2025 · Apt 1E
Close - Paint/plaster
Wall
Sep 12, 2025 · Apt 1E
Close - Unsanitary condition
Mold
May 14, 2025 · Apt 2D
Close - Door/window
Door frame
May 14, 2025 · Apt 2D
Close - Door/window
Window frame
May 14, 2025 · Apt 2D
Close - Door/window
Door
May 14, 2025 · Apt 2D
Close - Door/window
Door
May 12, 2025 · Apt 2D
Close - Plumbing
Basin/sink
Mar 18, 2025 · Apt 2E
Close - Door/window
Window frame
Mar 18, 2025 · Apt 2E
Close - Unsanitary condition
Mold
Mar 18, 2025 · Apt 2E
Close - Unsanitary condition
Pests
Feb 21, 2025 · Apt 2D
Close - Heat/hot water
Apartment only
Feb 19, 2025 · Apt 2D
Close - Unsanitary condition
Pests
Feb 19, 2025 · Apt 2D
Close - Unsanitary condition
Pests
Feb 19, 2025 · Apt 2D
Close - Heat/hot water
Entire building
Jan 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 19, 2025 · Apt 2D
Close - Heat/hot water
Entire building
Jan 18, 2025 · Apt 3B
Close - Plumbing
Basin/sink
Jan 17, 2025 · Apt 2D
Close - Electric
Lighting
Jan 17, 2025 · Apt 2D
Close - Plumbing
Bathtub/shower
Jan 17, 2025 · Apt 2D
Close - General
Cabinet
Jan 17, 2025 · Apt 2D
Close - Plumbing
Radiator
Jan 17, 2025 · Apt 2D
Close - Paint/plaster
Ceiling
Jan 17, 2025 · Apt 2D
Close - Door/window
Door
Jan 17, 2025 · Apt 2D
Close - Heat/hot water
Apartment only
Jan 17, 2025 · Apt 2D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1928
- Floors
- 4
- Residential units
- 21
- Building area
- 15,532 ft²
- Lot area
- 5,726 ft²
- Zoning
- R6A
- Community board
- 212
- Council district
- 12
- Block / lot
- 4826 / 40
- Assessed value
- $598,950
- Landmark / historic district
- No
HPD registration #202752, last renewed Aug 24, 2025.
Questions about 633 East 224 Street
Who owns 633 East 224 Street?
The owner of record in NYC Department of City Planning PLUTO data is Z K Holding Corp.
Does 633 East 224 Street have violations?
Yes. NYC HPD has recorded 166 housing violations at this property.
Is 633 East 224 Street rent stabilized?
NYC Department of Finance tax bills listed 20 rent-stabilized units here in 2024 (about 95% of its 21 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 633 East 224 Street built?
City records list 1928 as the year it was built.
How many apartments are in 633 East 224 Street?
It has 21 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.