710 East 221 Street
Bronx, NY 10467BBL 2-04668-0060Map
Owner of record: Bx 710 E 221st Holdings LLC
710 East 221 Street is a walk-up apartment building built in 2019 in Bronx, 10467. It has 8 residential units across 4 floors. The owner of record is Bx 710 E 221st Holdings LLC. HPD has recorded 18 housing violations here, most recently on October 13, 2026. 4 of the 18 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 18
- DOB violations
- 2
- ECB violations
- 14
- HPD complaints
- 24
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 18
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Oct 13, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2a, 2nd story, 1st apartment from west at north
Oct 13, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the the floor at public hall stairs, 1st story
Oct 13, 2026
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the the floor at public hall stairs, 1st story
Oct 13, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the approx 13 yards of house hold garbage at basement
Jan 10, 2026
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the public hall stairs at basement
Jan 10, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ... at the south wall in the foyer located at apt 1b, 1st story
Aug 24, 2025 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story
Aug 24, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ... at the ceiling in the bathroom located at apt 1b, 1st story
Aug 24, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective .. vinyl floor tile in the kitchen located at apt 1b, 1st story
Aug 24, 2025 · Apt 1B
Closed — Violation dismissed
Show 8 more ↓
- BHazardous
Properly repair or replace the broken or defective ... mailbox at public hall, 1st story
Aug 24, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective ... mortise lock set at vestibule door at public hall, 1st story
Aug 24, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles. in the 2nd room from north at east located at apt 1b, 1st story, 1st apartment from east at south
Jun 18, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles. in the kitchen located at apt 1b, 1st story, 1st apartment from east at south
Jun 18, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from east at south
Jun 18, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection waste line at wash basin in the bathroom located at apt 1b, 1st story, 1st apartment from east at south
Jun 18, 2025 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 18, 2024
Closed — Violation dismissed
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 6, 2017
Dob violation - dismissed - Zoning none
Z-zoning none
Dec 11, 1990
Dob violation - dismissed
ECB violations · 14
- Class - 2
Jobsite fence not constructed or maintained pursuant to subsection.at time of inspection of 4 story nb observed jobsite fence in place at exp#1 not as per code.observed that the fence not painted hunter green a
Jan 11, 2022 · Penalty $1,000
Resolve - Class - 2
Project information panel/sidewalk shed parapet panel at time of inspection of 4 story nb,observed sidewalk shed in place at exp#1 missing parapet information panel for project as required by code.rem:comly wit
Jan 11, 2022
Resolve - Class - 1
Failure to maintain construction gate as per code.at time of inspection of active 4 story nb construction site observed gate for constructin site made to swing into public walkway/sidewalk also contractor faile
Sep 27, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to maintain handrails on stairs as per code. at time of inspection on active 4 story nb construction site observed stairs leading to 3rd and 4th floors no handrails were in place for workers inspectors
Sep 27, 2021 · Penalty $2,500
Resolve - Class - 1
Pedestrian protection completely non exist. at time of inspection on active 4 story nb construction site observed not pedestrian protection in place for pedestrian walking at front of construction site the side
Sep 27, 2021 · Penalty $2,400
Resolve - Class - 2
Superintendent failed to correct unsafe conditions.at time of inspection on active 4 story nb constructin site observed conditions on site that went uncorrected by construction superintendent on site failure to
Sep 27, 2021 · Penalty $2,500
Resolve - Class - 2
Superintendent failed to maintain lobs on site as per code. at time of inspection on active 4 story nb construction site when request was made for superintendent and competent person to about 10-11 workers was
Sep 27, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to provide approved construction documents on site.at time of inspection on active 4 story nb constructin site notice 10-12 workers on site when request was made to workers for competent person to prov
Sep 27, 2021 · Penalty $312
Resolve - Class - 1
Bc3314.1 failure to maintain pipe scaffold as per code.at time of inspection on active 4 story nb construction site observed 6 workers working on 2 pipe scaffold more than 30 feet at exp #4 observed pipe scaffo
Sep 27, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to provide and maintain guardrails on site at openings as per code. at time of inspection of active 4 story nb construction site observed openings went unprotected by contractor at windows facing exp #3
Sep 27, 2021 · Penalty $2,500
Resolve
Show 4 more ↓
- Class - 2
Job site fence not maintained or inadquate.at time of inspection on active 4 story nb construction site onbserved at exp #3 fence at exp #2 back of yard fallen leaving opening that allows non construction perso
Sep 27, 2021 · Penalty $500
Resolve - Class - 1
Failure to provide & maintain pedestrian protection as per code. at time of inspection on an inactive 4 sty nb construction site,notice thatthe contractor failed to maintain pdestrian protection on site as per
Jun 7, 2021 · Penalty $2,500
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection. at the time of inspection at a 4 story nb,i observed the construction fence expo 1 not maintained to code(plywood fence leaning,not plumb,nai
Oct 23, 2020
Resolve - Class - 1
Demolition work w/out required demo permit. @ time of insp noted that the garage structure was demolished leaning only the slab on grade & partial wall @ rear & right side of garage, the pre-demo filling calls
Jun 5, 2017 · Penalty $24,000
Resolve
Complaints
- Electric
No lighting
Oct 23, 2026 · Apt 2A
Open - Electric
Power outage
Oct 12, 2026 · Apt 2A
Close - Heat/hot water
Apartment only
Oct 12, 2026 · Apt 2A
Close - Unsanitary condition
Garbage/recycling storage
Jul 14, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 14, 2026 · Apt BLDG
Close - General
Bell/buzzer/intercom
Mar 30, 2026 · Apt 3A
Close - Electric
Power outage
Jan 23, 2026 · Apt 4A
Close - Door/window
Door
Jan 9, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 8, 2026 · Apt 2A
Close - Electric
Power outage
Jan 8, 2026 · Apt 2A
Close
Show 14 more ↓
- Paint/plaster
Wall
Aug 15, 2025 · Apt 1B
Close - Unsanitary condition
Pests
Aug 15, 2025 · Apt 1B
Close - Water leak
Slow leak
Aug 15, 2025 · Apt 1B
Close - General
Mailbox
Aug 15, 2025 · Apt 1B
Close - Flooring/stairs
Floor
Aug 15, 2025 · Apt 1B
Close - Door/window
Door
Aug 15, 2025 · Apt 1B
Close - Flooring/stairs
Floor
Jun 13, 2025 · Apt 1B
Close - Water leak
Damp spot
Jun 13, 2025 · Apt 1B
Close - Flooring/stairs
Floor
Jun 13, 2025 · Apt 1B
Close - Electric
Power outage
Jun 10, 2025 · Apt 1B
Close - General
Mailbox
May 12, 2025 · Apt 2
Close - Door/window
Door
May 12, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Dec 2, 2024 · Apt 1A
Close - Water leak
Heavy flow
Dec 2, 2024 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2019
- Floors
- 4
- Residential units
- 8
- Building area
- 4,974 ft²
- Lot area
- 2,187 ft²
- Zoning
- R6
- Community board
- 212
- Council district
- 12
- Block / lot
- 4668 / 60
- Assessed value
- $502,200
- Landmark / historic district
- No
HPD registration #228786, last renewed Sep 16, 2025.
Questions about 710 East 221 Street
Who owns 710 East 221 Street?
The owner of record in NYC Department of City Planning PLUTO data is Bx 710 E 221st Holdings LLC.
Does 710 East 221 Street have violations?
Yes. NYC HPD has recorded 18 housing violations at this property.
Is 710 East 221 Street rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 100% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 710 East 221 Street built?
City records list 2019 as the year it was built.
How many apartments are in 710 East 221 Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.