940 East Gun Hill Road
Bronx, NY 10469BBL 2-04635-0037Map
Owner of record: 3415 Colden Ave LLC
940 East Gun Hill Road is a walk-up apartment building built in 1932 in Bronx, 10469. It has 20 residential units across 4 floors. The owner of record is 3415 Colden Ave LLC. HPD has recorded 171 housing violations here, most recently on May 6, 2026. 31 of the 50 most recent violations are still open. City tax records listed 18 rent-stabilized apartments here in 2024.
- HPD violations
- 171
- DOB violations
- 10
- ECB violations
- 0
- HPD complaints
- 181
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 171
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective located at apt 3c, 4th story, 1st apartment from north at east
May 6, 2026 · Apt 3C
Open — Invalid certification - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective located at apt 3c, 4th story, 1st apartment from north at east
May 6, 2026 · Apt 3C
Open — Invalid certification - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 3e, 4th story, 2nd apartment from west at north
Apr 29, 2026 · Apt 3E
Closed — Violation closed - CImmediately hazardous
Properly secure the loose washbasin in the bathroom located at apt 3b, 4th story, 1st apartment from east at south
Apr 29, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 3b, 4th story, 1st apartment from east at south
Apr 29, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective broken upper window sash glass in the bathroom located at apt 3b, 4th story, 1st apartment from east at south
Apr 29, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective rotted wood sink base cabinet in the kitchen located at apt 3b, 4th story, 1st apartment from east at south
Apr 29, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at bulkhead
Apr 29, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 3b, 4th story, 1st apartment from east at south
Apr 29, 2026 · Apt 3B
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Properly secure the loose 10th marble tread up from the bottom at public hall stairs, 1st story
Apr 29, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and north wall at bulkhead
Apr 29, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door
Apr 29, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing located at apt b, 1st story, 1st apartment from east at south
Apr 29, 2026 · Apt B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing located at apt b, 1st story, 1st apartment from east at south
Apr 29, 2026 · Apt B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt b, 1st story, 1st apartment from east at south
Apr 29, 2026 · Apt B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Apr 15, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - BHazardous
Provide adequate supply of hot water for the fixtures at washbasin in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Apr 15, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the private hallway located at apt 1a, 2nd story, 1st apartment from north at east
Apr 15, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Apr 15, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash at window in the kitchen located at apt 1a, 2nd story, 1st apartment from north at east
Apr 15, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door jamb in the entrance located at apt 1a, 2nd story, 1st apartment from north at east
Apr 15, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Apr 15, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Apr 15, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation riser in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Apr 15, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Feb 17, 2026 · Apt 1A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1a, 2nd story, 1st apartment from north at east
Feb 17, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 1a, 2nd story, 1st apartment from north at east
Feb 17, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1a, 2nd story, 1st apartment from north at east
Feb 17, 2026 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel paint at bathtub in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Feb 17, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Feb 17, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east located at apt 2b, 2nd story, 1st apartment from east at south
Dec 17, 2025 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 2b, 2nd story, 1st apartment from east at south
Dec 17, 2025 · Apt 2B
Open — First no access to re- inspect violation - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Dec 17, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Properly secure the loose newel cap at newel post of 3rd story intermediate landing
Mar 16, 2024
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt b, 1st story, 1st apartment from east at south
Jan 18, 2024 · Apt B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt b, 1st story, 1st apartment from east at south
Jan 18, 2024 · Apt B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt b, 1st story, 1st apartment from east at south
Jan 18, 2024 · Apt B
Open — Not complied with - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall in the 1st room from east located at apt b, 1st story, 1st apartment from east at south
Jan 18, 2024 · Apt B
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt b, 1st story, 1st apartment from east at south
Jan 18, 2024 · Apt B
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt b, 1st story, 1st apartment from east at south
Jan 18, 2024 · Apt B
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tile floor in the bathroom located at apt b, 1st story, 1st apartment from east at south
Jan 18, 2024 · Apt B
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall, 1st window frame from north at east wall in the 1st room from east located at apt b, 1st story, 1st apartment from east at south
Jan 18, 2024 · Apt B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, 1st window frame from west at north wall in the 1st room from north at east located at apt 3e, 4th story, 2nd apartment from west at north
Aug 28, 2023 · Apt 3E
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from north at east wall, 1st radiator from north at east wall in the kitchen located at apt 3e, 4th story, 2nd apartment from west at north
Aug 28, 2023 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall in the 1st room from north at west located at apt 3e, 4th story, 2nd apartment from west at north
Aug 28, 2023 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 1st room from north at west located at apt 3e, 4th story, 2nd apartment from west at north
Aug 28, 2023 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall, 1st door frame from east at south wall, 1st window frame from west at north wall in the 1st room from north at east located at apt 3e, 4th story, 2nd apartment from west at north
Aug 28, 2023 · Apt 3E
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from north at east wall in the 4th room from north located at apt 3e, 4th story, 2nd apartment from west at north
Aug 28, 2023 · Apt 3E
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall in the bathroom located at apt 3e, 4th story, 2nd apartment from west at north
Aug 28, 2023 · Apt 3E
Closed — Violation closed
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Heavy flow
Apr 3, 2026 · Apt 1A
Close - Door/window
Door frame
Apr 3, 2026 · Apt 1A
Close - General
Ventilation system
Apr 3, 2026 · Apt 1A
Close - General
Cabinet
Apr 3, 2026 · Apt 1A
Close - Unsanitary condition
Mold
Apr 3, 2026 · Apt 1A
Close - Plumbing
Bathtub/shower
Apr 3, 2026 · Apt 1A
Close - Flooring/stairs
Floor
Apr 3, 2026 · Apt 1A
Close - Paint/plaster
Wall
Apr 3, 2026 · Apt 1A
Close - Water leak
Heavy flow
Mar 11, 2026 · Apt 1A
Close - Water leak
Slow leak
Mar 11, 2026 · Apt 1A
Close
Show 40 more ↓
- Unsanitary condition
Pests
Feb 22, 2026 · Apt 2C
Open - Unsanitary condition
Pests
Feb 22, 2026 · Apt 2C
Open - Unsanitary condition
Pests
Feb 22, 2026 · Apt 2C
Open - Paint/plaster
Ceiling
Feb 16, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt BLDG
Close - Water leak
Heavy flow
Dec 11, 2025 · Apt 2B
Close - Safety
Window guard broken/missing
Dec 11, 2025 · Apt 2B
Close - Unsanitary condition
Mold
Dec 11, 2025 · Apt 2B
Close - Paint/plaster
Ceiling
Dec 11, 2025 · Apt 2B
Close - Paint/plaster
Ceiling
Nov 21, 2025 · Apt 2B
Close - Safety
Window guard broken/missing
Nov 21, 2025 · Apt 2B
Close - Paint/plaster
Wall
Nov 21, 2025 · Apt 2B
Close - Water leak
Damp spot
Nov 21, 2025 · Apt 2B
Close - Unsanitary condition
Pests
Feb 27, 2025 · Apt 7T
Close - Unsanitary condition
Pests
Feb 27, 2025 · Apt 7T
Close - Door/window
Window frame
Jan 8, 2024 · Apt B
Close - Paint/plaster
Wall
Jan 8, 2024 · Apt B
Close - Unsanitary condition
Mold
Jan 8, 2024 · Apt B
Close - Flooring/stairs
Floor
Jan 8, 2024 · Apt B
Close - Paint/plaster
Wall
Jan 8, 2024 · Apt B
Close - Unsanitary condition
Pests
Jan 8, 2024 · Apt B
Close - Paint/plaster
Wall
Jan 8, 2024 · Apt B
Close - Unsanitary condition
Pests
Aug 15, 2023 · Apt 3E
Close - Door/window
Window frame
Aug 15, 2023 · Apt 3E
Close - Unsanitary condition
Pests
Aug 15, 2023 · Apt 3E
Close - Unsanitary condition
Mold
Aug 15, 2023 · Apt 3E
Close - Heat/hot water
Entire building
Dec 20, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2022 · Apt BLDG
Close - Unsanitary condition
Mold
Dec 22, 2021 · Apt D
Close - Paint/plaster
Ceiling
Dec 22, 2021 · Apt D
Close - Appliance
Refrigerator
Dec 21, 2021 · Apt 3B
Close - Door/window
Window frame
Apr 20, 2021 · Apt 3C
Close - Door/window
Window frame
Mar 31, 2021 · Apt 3C
Close - Heat/hot water
Entire building
Jan 24, 2021 · Apt A
Close - Heat/hot water
Entire building
Dec 14, 2020 · Apt A
Close - Heat/hot water
Entire building
Mar 29, 2020 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1932
- Floors
- 4
- Residential units
- 20
- Building area
- 18,176 ft²
- Lot area
- 5,238 ft²
- Zoning
- R6A
- Community board
- 212
- Council district
- 12
- Block / lot
- 4635 / 37
- Assessed value
- $598,950
- Landmark / historic district
- No
HPD registration #218709, last renewed Jul 27, 2026.
Questions about 940 East Gun Hill Road
Who owns 940 East Gun Hill Road?
The owner of record in NYC Department of City Planning PLUTO data is 3415 Colden Ave LLC.
Does 940 East Gun Hill Road have violations?
Yes. NYC HPD has recorded 171 housing violations at this property.
Is 940 East Gun Hill Road rent stabilized?
NYC Department of Finance tax bills listed 18 rent-stabilized units here in 2024 (about 90% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 940 East Gun Hill Road built?
City records list 1932 as the year it was built.
How many apartments are in 940 East Gun Hill Road?
It has 20 residential units and 21 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.