roofy

747 South Oak Drive

Bronx, NY 10467BBL 2-04599-0015Map

Owner of record: Groce Enterprises LLC

747 South Oak Drive is a walk-up apartment building built in 1934 in Bronx, 10467. It has 5 residential units across 3 floors. The owner of record is Groce Enterprises LLC. HPD has recorded 117 housing violations here, most recently on April 30, 2026. 39 of the 50 most recent violations are still open.

HPD violations
117
DOB violations
0
ECB violations
0
HPD complaints
101

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 117

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the 1st room from north at east located at apt 3r, 3rd story

    Aug 14, 2025 · Apt 3R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the east and south walls at public hall, 3rd story

    Aug 11, 2025

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at bulkhead at public hall, 3rd story

    Aug 11, 2025

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective the fire retardant east and south walls at public hall, 3rd story

    Aug 11, 2025

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective the fire retardant ceiling at bulk head at public hall, 3rd story

    Aug 11, 2025

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the east wall at public hall, 1st story

    Aug 11, 2025

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective the fire retardant east wall at public hall, 1st story

    Aug 11, 2025

    Open — Nov sent out
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partition sheetrock wall erected dividing and creating another room in the 1st room from east at north located at apt 3r, 3rd story, 1st apartment from west at north

    Aug 11, 2025 · Apt 3R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective the ceiling light fixture in the 1st room from east at south located at apt 3r, 3rd story, 1st apartment from west at north

    Aug 11, 2025 · Apt 3R

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective wood floor in the foyer located at apt 3r, 3rd story, 1st apartment from west at north

    Aug 11, 2025 · Apt 3R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the 1st room from north at east located at apt 3r, 3rd story, 1st apartment from south at west

    Aug 5, 2025 · Apt 3R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, 2nd window frame from west at north wall, 1st window frame from south at west wall in the 1st room from north at west located at apt 3r, 3rd story, 1st apartment from south at west

    Jul 13, 2025 · Apt 3R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 2nd room from north at west located at apt 3r, 3rd story, 1st apartment from south at west

    Jul 13, 2025 · Apt 3R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall, north wall in the 1st room from north at west located at apt 3r, 3rd story, 1st apartment from south at west

    Jul 13, 2025 · Apt 3R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the baseboard at south wall, baseboard at west wall in the 2nd room from north at west located at apt 3r, 3rd story, 1st apartment from south at west

    Jul 13, 2025 · Apt 3R

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall

    Jul 13, 2025

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at east wall at public hall, 1st story

    Jul 13, 2025

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective fire retardant materials at east wall at public hall, 1st story

    Jul 13, 2025

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective door at entrance in the 1st room from north at west located at apt 3r, 3rd story, 1st apartment from south at west

    Jul 13, 2025 · Apt 3R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl tiles at floor in the 1st room from north at east located at apt 3r, 3rd story, 1st apartment from south at west

    Jul 13, 2025 · Apt 3R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall, baseboard at north wall, 1st door from east at south wall in the 1st room from north at west located at apt 3r, 3rd story, 1st apartment from south at west

    Jul 13, 2025 · Apt 3R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from north at west located at apt 3r, 3rd story, 1st apartment from south at west

    Jul 13, 2025 · Apt 3R

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall

    Jul 8, 2025

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall

    Jul 8, 2025

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, west wall in the 1st room from north at east located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak the north wall in the 1st room from north at east located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling in the 1st room from north at east located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the 1st room from north at east located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the south wall in the kitchen located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, 1st door from north at east wall in the 3rd room from north at west located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl tiles at floor in the 1st room from north at east located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall

    Jun 23, 2025

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Jun 23, 2025

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north at east located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective door knob at entrance in the 1st room from north at east located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame in the 3rd room from north at west located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door from south at west wall, 1st door frame from south at west wall, north wall, south wall, 1st window frame from north at east wall in the bathroom located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 3rd room from north at west located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, east wall in the private hallway located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall, 1st window frame from north at east wall in the 1st room from north at east located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st dumb waiter from east at south wall, 1st window frame from north at east wall in the kitchen located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 3r, 3rd story, 2nd apartment from south at west

    Jun 23, 2025 · Apt 3R

    Open — Lead docs submitted, acceptable
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Closed — Violation dismissed
  • B

    Refit lower window sash in the kitchen located at apt 3f, 3rd story, 1st apartment from north at east

    May 12, 2025 · Apt 3F

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective inoperable gfic electrical outlets at north wall in the kitchen located at apt 3f, 3rd story, 1st apartment from north at east

    May 12, 2025 · Apt 3F

    Open — Nov sent out
  • B

    Refit lower window sash in the 1st room from east at south located at apt 3f, 3rd story, 1st apartment from north at east

    May 12, 2025 · Apt 3F

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north, and west walls in the kitchen located at apt 3f, 3rd story, 1st apartment from north at east

    May 12, 2025 · Apt 3F

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 3f, 3rd story, 1st apartment from north at east

    May 12, 2025 · Apt 3F

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Heat/hot water

    Apartment only

    Mar 20, 2026 · Apt 3F

    Close
  • Door/window

    Door

    Mar 20, 2026 · Apt 3F

    Close
  • Plumbing

    Bathtub/shower

    Mar 20, 2026 · Apt 3F

    Close
  • Plumbing

    Basin/sink

    Mar 20, 2026 · Apt 3F

    Close
  • Plumbing

    Water supply

    Mar 9, 2026 · Apt 3F

    Close
  • Plumbing

    Basin/sink

    Mar 9, 2026 · Apt 3F

    Close
  • Door/window

    Door

    Mar 9, 2026 · Apt 3F

    Close
  • Plumbing

    Bathtub/shower

    Mar 9, 2026 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Mar 6, 2026 · Apt 3F

    Close
  • Plumbing

    Bathtub/shower

    Mar 6, 2026 · Apt 3F

    Close
Show 40 more ↓
  • Door/window

    Door frame

    Mar 6, 2026 · Apt 3F

    Close
  • Appliance

    Electric/gas range

    Mar 4, 2026 · Apt 1F

    Close
  • Door/window

    Door

    Feb 28, 2026 · Apt 3F

    Close
  • Paint/plaster

    Wall

    Feb 28, 2026 · Apt 3F

    Close
  • General

    Ventilation system

    Feb 20, 2026 · Apt APT1R

    Close
  • Electric

    Lighting

    Aug 8, 2025 · Apt 3R

    Close
  • Electric

    No lighting

    Jul 20, 2025 · Apt 3R

    Close
  • Water leak

    Slow leak

    Jul 7, 2025 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Jul 7, 2025 · Apt 3R

    Close
  • Flooring/stairs

    Floor

    Jul 7, 2025 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Jul 7, 2025 · Apt 3R

    Close
  • Water leak

    Slow leak

    Jul 6, 2025 · Apt 3R

    Close
  • Water leak

    Slow leak

    Jun 30, 2025 · Apt 3R

    Close
  • Water leak

    Slow leak

    Jun 15, 2025 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Jun 15, 2025 · Apt 3R

    Close
  • Flooring/stairs

    Floor

    Jun 15, 2025 · Apt 3R

    Close
  • Paint/plaster

    Wall

    May 13, 2025 · Apt 1F

    Close
  • Electric

    Outlet/switch

    May 8, 2025 · Apt 3F

    Close
  • Door/window

    Window frame

    May 8, 2025 · Apt 3F

    Close
  • Paint/plaster

    Wall

    May 8, 2025 · Apt 3F

    Close
  • Plumbing

    Bathtub/shower

    May 8, 2025 · Apt 3F

    Close
  • Paint/plaster

    Wall

    Apr 25, 2025 · Apt 2R

    Close
  • Water leak

    Heavy flow

    Apr 25, 2025 · Apt 2R

    Close
  • Electric

    Lighting

    Apr 25, 2025 · Apt 2R

    Close
  • Appliance

    Electric/gas range

    Apr 25, 2025 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Apr 25, 2025 · Apt 2R

    Close
  • Appliance

    Electric/gas range

    Apr 25, 2025 · Apt 2R

    Close
  • Electric

    Lighting

    Apr 25, 2025 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Apr 25, 2025 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Apr 25, 2025 · Apt 2R

    Close
  • Water leak

    Heavy flow

    Apr 22, 2025 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Apr 22, 2025 · Apt 3R

    Close
  • Flooring/stairs

    Floor

    Apr 22, 2025 · Apt 3R

    Close
  • Appliance

    Refrigerator

    Apr 22, 2025 · Apt 3R

    Close
  • Safety

    Carbon monoxide detector

    Mar 28, 2025 · Apt 3F

    Close
  • Paint/plaster

    Ceiling

    Mar 28, 2025 · Apt 3F

    Close
  • Safety

    Smoke detector

    Mar 28, 2025 · Apt 3F

    Close
  • Plumbing

    Bathtub/shower

    Mar 28, 2025 · Apt 3F

    Close
  • Plumbing

    Toilet

    Mar 28, 2025 · Apt 3F

    Close
  • Paint/plaster

    Wall

    Mar 28, 2025 · Apt 3F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1934
Floors
3
Residential units
5
Building area
3,780 ft²
Lot area
4,750 ft²
Zoning
R4A
Community board
212
Council district
12
Block / lot
4599 / 15
Assessed value
$417,600
Landmark / historic district
No

HPD registration #212582, last renewed Oct 23, 2025.

Questions about 747 South Oak Drive

Who owns 747 South Oak Drive?

The owner of record in NYC Department of City Planning PLUTO data is Groce Enterprises LLC.

Does 747 South Oak Drive have violations?

Yes. NYC HPD has recorded 117 housing violations at this property.

Is 747 South Oak Drive rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 747 South Oak Drive built?

City records list 1934 as the year it was built.

How many apartments are in 747 South Oak Drive?

It has 5 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.