3230 Cruger Avenue
Bronx, NY 10467BBL 2-04597-0021Map
Owner of record: 3230 Cruger Owners Corp
3230 Cruger Avenue is an elevator apartment building built in 1930 in Bronx, 10467. It has 79 residential units across 6 floors. The owner of record is 3230 Cruger Owners Corp. HPD has recorded 2,481 housing violations here, most recently on October 22, 2026. 47 of the 50 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2024.
- HPD violations
- 2,481
- DOB violations
- 51
- ECB violations
- 55
- HPD complaints
- 5,128
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 2,481
- BHazardous
Repair the roof so that it will not leak at ceiling at 2nd public hall bulkhead from north
Oct 22, 2026
Open — Violation open - BHazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling at 2nd public hall bulkhead from north
Oct 22, 2026
Open — Violation open - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door at 2nd public hall bulkhead from north
Oct 22, 2026
Open — Violation open - BHazardous
Properly repair or replace the broken or defective bell buzzerr intercom system from building front to south wall in the foyer located at apt 2k, 2nd story, 2nd apartment from north at east
Oct 22, 2026 · Apt 2K
Open — Violation open - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 2k, 2nd story, 2nd apartment from north at east
Oct 22, 2026 · Apt 2K
Open — Violation open - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the private hallway located at apt 2k, 2nd story, 2nd apartment from north at east
Oct 22, 2026 · Apt 2K
Open — Violation open - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling at north 1 closet in the private hallway located at apt 2k, 2nd story, 2nd apartment from north at east
Oct 22, 2026 · Apt 2K
Open — Violation open - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, north wall and east wall at north 1 closet in the private hallway located at apt 2k, 2nd story, 2nd apartment from north at east
Oct 22, 2026 · Apt 2K
Open — Violation open - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash at window in the bathroom located at apt 2k, 2nd story, 2nd apartment from north at east
Oct 22, 2026 · Apt 2K
Open — Violation open - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 1o square feet at ceiling, north wall, south wall and west wall in the bathroom located at apt 2k, 2nd story, 2nd apartment from north at east
Oct 22, 2026 · Apt 2K
Open — Violation open
Show 40 more ↓
- ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2k, 2nd story, 2nd apartment from north at east
Oct 22, 2026 · Apt 2K
Open — Violation open - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2k, 2nd story, 2nd apartment from north at east
Oct 22, 2026 · Apt 2K
Open — Violation open - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 2k, 2nd story, 2nd apartment from north at east
Oct 22, 2026 · Apt 2K
Open — Violation open - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt 2k, 2nd story, 2nd apartment from north at east
Oct 22, 2026 · Apt 2K
Open — Violation open - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2k, 2nd story, 2nd apartment from north at east
Oct 22, 2026 · Apt 2K
Open — Violation open - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2k, 2nd story, 2nd apartment from north at east
Oct 22, 2026 · Apt 2K
Open — Violation open - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than ten square feet at window sill at north wall in the kitchen located at apt 6l, 6th story, 2nd apartment from north at east , section at south
Oct 18, 2026 · Apt 6L
Open — Notice of issuance sent to tenant - CImmediately hazardous
M/d law abate the nuisance consisting of slide bolt capable of being padlocked at apartment door in the entrance located at apt 3d, 3rd story, 1st apartment from west at north , section at west
Oct 18, 2026 · Apt 3D
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than ten square feet at ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north , section at west
Oct 18, 2026 · Apt 3D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 3, wg to repair = 0 in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north , section at west
Oct 18, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at building entrance door , 1st story
Oct 18, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 6l, 6th story, 2nd apartment from north at east , section at south
Oct 18, 2026 · Apt 6L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from north located at apt 6l, 6th story, 2nd apartment from north at east , section at south
Oct 18, 2026 · Apt 6L
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story
Oct 18, 2026
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen located at apt 6g, 6th story, 4th apartment from south at west
Aug 17, 2026 · Apt 6G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall, 2nd window frame from south at west wall in the 1st room from north at west located at apt 6g, 6th story, 4th apartment from south at west
Aug 17, 2026 · Apt 6G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 2nd room from north at west, the bathroom located at apt 6g, 6th story, 4th apartment from south at west
Aug 17, 2026 · Apt 6G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash at 1st window from east at south wall in the kitchen located at apt 6g, 6th story, 4th apartment from south at west
Aug 17, 2026 · Apt 6G
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6g, 6th story, 4th apartment from south at west
Aug 17, 2026 · Apt 6G
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 6g, 6th story, 4th apartment from south at west
Aug 17, 2026 · Apt 6G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall, south wall, east wall in the kitchen located at apt 6g, 6th story, 4th apartment from south at west
Aug 17, 2026 · Apt 6G
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the bathroom located at apt 6g, 6th story, 4th apartment from south at west
Aug 17, 2026 · Apt 6G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, east wall, west wall in the 1st room from north at west located at apt 6g, 6th story, 4th apartment from south at west
Aug 17, 2026 · Apt 6G
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of expose wires at south wall in the private hallway located at apt 6g, 6th story, 2nd apartment from south at west
Aug 11, 2026 · Apt 6G
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Aug 11, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood window sill at first and second window at south at west wall in the 1st room from north at west located at apt 6g, 6th story, 2nd apartment from south at west
Aug 11, 2026 · Apt 6G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at first and second window frome south at west wall in the 1st room from north at west located at apt 6g, 6th story, 2nd apartment from south at west
Aug 11, 2026 · Apt 6G
Open — Nov sent out - BHazardous
Properly secure the loose electrical outlet at east wall in the 1st room from north at west located at apt 6g, 6th story, 2nd apartment from south at west
Aug 11, 2026 · Apt 6G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at first and second window from south at west wall in the 2nd room from north at west located at apt 6g, 6th story, 2nd apartment from south at west
Aug 11, 2026 · Apt 6G
Open — Nov sent out - BHazardous
Properly secure the loose electrical outlet at north and east wall in the 2nd room from north at west located at apt 6g, 6th story, 2nd apartment from south at west
Aug 11, 2026 · Apt 6G
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 6g, 6th story, 2nd apartment from south at west
Aug 11, 2026 · Apt 6G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mortise lock and assembly in the entrance located at apt 6g, 6th story, 2nd apartment from south at west
Aug 11, 2026 · Apt 6G
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective frame in the entrance located at apt 6g, 6th story, 2nd apartment from south at west
Aug 11, 2026 · Apt 6G
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower window sashes (fire escape) in the kitchen located at apt 6g, 6th story, 2nd apartment from south at west
Aug 11, 2026 · Apt 6G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall in the bathroom located at apt 5l, 5th story, 4th apartment from north at east
Jul 12, 2026 · Apt 5L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, south wall, 1st window frame from west at north wall in the bathroom located at apt 5l, 5th story, 4th apartment from north at east
Jul 12, 2026 · Apt 5L
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 2j, 2nd story, 1st apartment from south at west
Jul 12, 2026 · Apt 2J
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2j, 2nd story, 1st apartment from south at west
Jul 12, 2026 · Apt 2J
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the 3rd room from east at north located at apt 2j, 2nd story, 1st apartment from south at west
Jul 12, 2026 · Apt 2J
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from north at east wall door frame, 2nd closet from north at east wall door frame, 1st door frame from north at east wall, east wall in the 3rd room from east at south located at apt 2j, 2nd story, 1st apartment from south at west
Jul 12, 2026 · Apt 2J
Closed — Violation closed
DOB building violations · 51
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 4, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 14, 2021
Dob violation - dismissed
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 2, 2020
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 21, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 30, 2015
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 4, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 4, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 2013
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 7, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 30, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 5, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 8, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 1, 2008
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - active - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 22, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 30, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Elevator elevatorrequired
2p1305
Jan 7, 2003
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active
ECB violations · 55
- Class - 1
Failure to maintain building in code compliant manner. at time of inspection observed at exposure# 3 fire escape pathway to street has been obstructed by excessive amounts of household garbage. condition is an
May 27, 2026 · Penalty $12,500
Active - Class - 2
Failure to comply with commissioner's order contained in summons #39103895p issued on 01/22/2024, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Feb 11, 2025 · Penalty $1,250
Active - Class - 2
Inoperative phone. provide designated lobby braille tags. misaligned cab mirror. operator cover missing. provide in case of fire signs where missing. adjust door checks where needed. unguarded plank switch. mis
May 29, 2024 · Penalty $625
Active - Class - 2
Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #908694. remedy: submit acceptable requ
Apr 11, 2024 · Penalty $1,250
Active - Class - 2
In-car communication is not working properly, need to repair. required signage stating "in case of fire use do not use elevator use the stairs" is missing, need to provide proper signage on each floor. contacto
Jan 22, 2024 · Penalty $625
Active - Class - 2
Failure to maintain in code-compliant manner. observed throughout building emergency lights not working. as per bc 1008.3.5 and also 1008.3.4. the emergency power system shall provide power for a duration not l
Aug 18, 2023 · Penalty $655
Active - Class - 2
Failure to maintain building in code compliant manner. observed in basement/cellar ceiling penetrations throughout level. as per bc 307.4 floor/ceiling assemblies shall be protected in accordance with the nyc b
Aug 18, 2023 · Penalty $655
Active - Class - 2
Failure to maintain building in code-compliant manner. observed in basement/cellar combusible storage in meter bank area also gas powered snow blower observed in the adjacent room. remedy: repair and/or replace
Aug 18, 2023 · Penalty $655
Active - Class - 1
Responding to a 311 complaint, upon inspection of the device cease use violation was issued for 1/ car door restrictor not working, 2/ cab floor saddle worn and damage , cab strike post damage and unsecured, ca
Jun 1, 2023 · Penalty $1,250
Active - Class - 1
Cease use 05a10,42m07,02x10 and 29q03 repair car door restrictor that have be tampered with.no door lock monitoring installed in controller as mandated by 3.10.12 of appendix k3 of 2014 nyc building code.remedy
Apr 12, 2022 · Penalty $1,250
Resolve
Show 40 more ↓
- Class - 1
No door lock monitoring installed in controller as mandated in appendix k of the 2014 buildings code. remedy: install dlm, file and perform test with nyc dob, door restrictor in operative, cat 1 tags expired on
Mar 15, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior bldg facades/walls&appurtenances.note:atoi observed@exp1,w elevation:step crack b/w windows of5&6level.brickwork cracked@window lintels@several locations.exp2,n elevation:missing br
Oct 22, 2021 · Penalty $3,125
Resolve - Class - 1
(recurring class 1) door restrictor altered/inoperative. (class ii violations) cat 1 tag expired, provide. brake maintenance tag expired, perform brake maintenance and tag device. cab mirror missing
May 4, 2021 · Penalty $3,125
Resolve - Class - 1
Ceause use=01-x-10,05-x-10,02-x-10,02-x-10,29-q-03,42-m-07=cease use from 01-x-10 repair stop switch in car 05-x-10 repair car door restructore 02-x-10 repair outside communication in car (telephone) 02-x-10
Jan 20, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/violation #35365704h issued on 10/7/2019,& to file a certificate of correctionpursuant to 28.201.1 & 1 rcny 102-01(d)(2).remedy:file a certificate
Jun 29, 2020 · Penalty $6,250
Active - Class - 2
Failure to comply w/commissioner's order contained in summons/violation #35365705j issued on 10/7/2019,& to file a certificate of correctionpursuant to 28-201.1 & 1rcny 102-01(d)(2).remedy:file a certificate of
Jun 29, 2020 · Penalty $6,250
Active - Class - 1
Failure to maintain exterior building facade and appurtenances. note:exposure 1,east elevation;left side fire escape drop ladder at ground level is bent above a projecting window w/ ac unit bars which prevents
Oct 7, 2019 · Penalty $6,250
Resolve - Class - 1
Failure to provide unobstructed passageway. note:exposure 1,east elevation,right side fire escape 4th and 5th floors have objects on fire escape landings presenting a hazard in the event of a fire and emergency
Oct 7, 2019 · Penalty $3,125
Resolve - Class - 1
Cu05a10; 02x10,64m07,40p16,70p16,39o02,35m07,45m13,39m07,37x10. 05a-repair restrictor and notify nycdob so a restore to service nspeciton can be completed. 02x-repair in car phone; *64m-provide and install
Mar 17, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to submit a required cycle 8b reprot of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #808694. rmdy: submit required technical report.
Oct 15, 2018 · Penalty $625
Resolve - Class - 1
16l10,05m07,59bb05,99bb05,45m07,68b01,71x10,67x0,69b07,80m07,35m07-16l10)floor 6&b doors lost contact when car is running, repair. 05m07)provide restrictor and contact nycdob for reinspection. 59bb05)brake tag
Nov 28, 2017
Resolve - Class - 2
Failure to maintain bldg walls and appurtenances.noted at time of inspection (i) at exp1 a.spalled brickwork and sagged lintel at 1/f windowby southwest courtyard; b.spalled and missing brick between 1/f and 2/
Aug 17, 2016 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior building west elev,exp1 observed a/c unite supported by wood/bricks/cans flrs 2,3,5,6. venticle cracks various floors, sagging lintel-missing mortar at lintel extensions various flr
May 20, 2015 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior bldg west elev exp1 observed a/c unit supported by wood, bricks,under a/c unit flrs 4 and 6 verticle cracks various floors, through brick, brick delaminated.sagging lintels 1st and
Nov 25, 2014 · Penalty $1,250
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Oct 14, 2014 · Penalty $2,000
Resolve - Class - 2
23i10,29q03,35q03,36q03,70z02,71q03,77q03. 23i10-repair lobby hall push button; 35q03-install cover for electrical box top of car; 36q03-install covers for electrical box in shaftway; 77q03-install guard for li
Sep 13, 2014 · Penalty $2,500
Active - Class - 1
Failure to properly bond electrical systems. bsmt service switches: neutral bars are not bonded to enclosures. remedy: provide proper bonding.
Mar 5, 2014 · Penalty $15,000
Active - Class - 1
Failure to ground electrical systems. bsmt service ground conductor: no water main ground provided. remedy: provide grounding.
Mar 5, 2014 · Penalty $24,000
Active - Class - 2
Unapproved/unsafe/unsuitable electrical equipment,apparatus,materials,devices,appliances or wiring in use. apt 2l bedroom defective switch are use,defective light fixture are in use. remedy: comply w/ec code.
Mar 5, 2014 · Penalty $4,000
Resolve - Class - 2
Failure to maintain exterior bldg. west elevation, exp #1 observe blocks of wood, bricks improperly install under ac units, flower pot stored on fire escape landing. north elevation, exp #2 observed blocks of
Aug 29, 2013 · Penalty $2,500
Resolve - Class - 2
B254,15,32a,34a,48a,50a. 50a- chimney base clogged @ flue. repair/replace all defective boiler parts - file a c/c.
Feb 28, 2012 · Penalty $2,500
Active - Class - 2
Failure to file an acceptable 5th or 6th round technical report in compliance with article 28-302 of the bldg code & dept of bldgs' rules & regulations. 36009781r. respondent has demonstrated a history of non-c
Nov 22, 2011 · Penalty $10,000
Resolve - Class - 2
B254,5a,15,50a,b,c,d,e. 50a- oil leak at burner. 50b- covers missing on controls. 50c- pressure gauge to be on own pigtail and be brass. 50d- discharge pipe missing on relief valve. 50e- discharge missing on
May 23, 2011 · Penalty $2,500
Active - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodc inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.remed
Apr 15, 2011 · Penalty $8,000
Resolve - Class - 2
15m07,40p7,37p7,20i11,29q3,10m07,23b10,33o2,34o2,36o2,39o2,70o2,73o2, 74o2,77i11.
Oct 12, 2010 · Penalty $2,500
Active - Class - 2
Failure to file an acceptable 6th round technical report in compl w/code provisions:periodic insp of ext walls & appurtenances as required by article 28.302 & dob rules & regulations 36010695z.rem:file the requ
Jul 12, 2010 · Penalty $8,000
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulation
Nov 27, 2009 · Penalty $4,000
Resolve - Class - 2
Failure to file an acceptable fifth or sixth round technical report incompliance with article 28-302 of the building code and department of buildings rules and regulations. respondent has demonstrated a history
Aug 24, 2009 · Penalty $10,000
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations
Feb 6, 2009 · Penalty $4,000
Resolve - Class - 2
Failure to submit an acceptable fifth round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 and the dob rules and regulations
Oct 31, 2008 · Penalty $4,000
Resolve - Hazardous
Failure to submit a 5th round technical report in compliance w/code provisins: periodic inspection of exterior walls & appurtenances as required by local law 11 of 1998 & the dob's rules & regulations. remedy:
Apr 11, 2008 · Penalty $2,500
Resolve - Non-hazardous
Failure to submit a fifth round technical report in compliance w/ codeprovisions:periodic inspection of exterior walls & appurtenances as required by local law 11 of 1998 & the dob rules & regulations.
May 26, 2006 · Penalty $10,000
Resolve - Non-hazardous
Failure to submit a fifth round technical report in compliance with code provisions: periodic inspection of exterior walls and appurtenancesas required by local law 11 of 1998 and the dept of bldgs rules & regu
Feb 28, 2006 · Penalty $10,000
Resolve - Non-hazardous
Failure to submit a fifth round technical report in compliance with code provisions: periodic inspection of exterior walls and appurtenancesas required by local law 11 of 1998 and the dept of bldgs rules and re
Aug 12, 2005 · Penalty $10,000
Resolve - Non-hazardous
20050805yde provisions: periodic inspection of exterior walls and appurtenancesas required by local law 11 of 1998 and the dept of buildings rules an
Mar 18, 2005 · Penalty $10,000
Resolve - Hazardous
Failure to maintain exterior bldg wall and appurtenances.observed several improperly supported/installed win mtd ac units @ all facades. w/ loose brick and wood placed under ac units on win sills.remedy:make
Sep 9, 2004 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior wall and appurtenances.noted on cruger elev west several tv antenas placed or installed blocking fire escapes over sidewalk condition observed typ @ all fire escapes.remedy:take
Sep 9, 2004 · Penalty $2,500
Resolve - Non-hazardous
Failure to submit a fifth round techincal report:periodic inspection of exterior walls and appurtenances as required by local law 11 of 1998and the department of bldg rules and regulations.remedy:file the requi
Aug 6, 2004 · Penalty $10,000
Resolve - Non-hazardous
Failure to submit a fifth round technical report periodic inspection or exterior walls and appurtenances as required by local law 11 of 1998and the department of buildings rules and regulations.remedy:file the
Dec 26, 2003 · Penalty $700
Resolve - Non-hazardous
12#7/16t15/31h10/51u15/66o2(12)car light working replaces bulbs (16)5,3,2 lobby hoist door missing number label(31)worn guide shoes(51)hoistrope not tag as per code (66)pit dirty
Sep 30, 2003 · Penalty $350
Resolve
Complaints
- Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 20, 2026 · Apt 4M
Close - Heat/hot water
Entire building
Oct 17, 2026 · Apt BLDG
Close - Electric
Power outage
Oct 17, 2026 · Apt BLDG
Close - Door/window
Door
Oct 17, 2026 · Apt APT3D
Open - Plumbing
Basin/sink
Oct 17, 2026 · Apt APT3D
Open - Door/window
Window frame
Oct 17, 2026 · Apt APT3D
Open - Flooring/stairs
Floor
Oct 17, 2026 · Apt APT3D
Open - Paint/plaster
Wall
Oct 17, 2026 · Apt APT3D
Open - Unsanitary condition
Mold
Oct 17, 2026 · Apt APT3D
Open
Show 40 more ↓
- Heat/hot water
Entire building
Oct 17, 2026 · Apt APT3D
Close - Electric
Power outage
Oct 17, 2026 · Apt BUILDI
Close - Unsanitary condition
Mold
Oct 5, 2026 · Apt 4K
Close - Unsanitary condition
Pests
Oct 5, 2026 · Apt 4K
Close - Unsanitary condition
Mold
Sep 30, 2026 · Apt 5L
Close - Water leak
Slow leak
Aug 7, 2026 · Apt 1D
Close - Plumbing
Bathtub/shower
Aug 7, 2026 · Apt 1D
Close - Unsanitary condition
Mold
Aug 7, 2026 · Apt 1D
Close - Plumbing
Basin/sink
Aug 7, 2026 · Apt 6G
Close - Plumbing
Water supply
Aug 7, 2026 · Apt 6G
Close - Plumbing
Toilet
Aug 7, 2026 · Apt 6G
Close - Water leak
Heavy flow
Jul 6, 2026 · Apt 5L
Close - Water leak
Heavy flow
Jul 5, 2026 · Apt 5L
Close - Electric
Lighting
Jul 5, 2026 · Apt 5L
Close - Appliance
Electric/gas range
May 7, 2026 · Apt 2J
Close - Plumbing
Water supply
May 1, 2026 · Apt 2J
Close - Appliance
Electric/gas range
May 1, 2026 · Apt 2J
Close - Plumbing
Water supply
May 1, 2026 · Apt BUILDI
Close - Plumbing
Water supply
Apr 4, 2026 · Apt 5M
Close - Plumbing
Water supply
Apr 4, 2026 · Apt BLDG
Close - Plumbing
Water supply
Apr 4, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Mar 15, 2026 · Apt 3D3RDF
Close - Flooring/stairs
Floor
Mar 15, 2026 · Apt 3D3RDF
Close - Paint/plaster
Ceiling
Mar 15, 2026 · Apt 3D3RDF
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt 3D3RDF
Close - Paint/plaster
Door/frame
Mar 15, 2026 · Apt 3D3RDF
Close - Water leak
Slow leak
Mar 15, 2026 · Apt 3D3RDF
Close - Plumbing
Radiator
Mar 15, 2026 · Apt 3D3RDF
Close - Door/window
Window frame
Mar 15, 2026 · Apt 3D3RDF
Close - Plumbing
Water supply
Mar 14, 2026 · Apt 2J
Close - Heat/hot water
Entire building
Mar 14, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Feb 2, 2026 · Apt 3D
Close - Paint/plaster
Ceiling
Feb 2, 2026 · Apt 3D
Close - Heat/hot water
Apartment only
Feb 2, 2026 · Apt 3D
Close - Door/window
Window frame
Feb 2, 2026 · Apt 3D
Close - Heat/hot water
Apartment only
Jan 20, 2026 · Apt 1F
Close - Elevator
Maintenance
Dec 8, 2025 · Apt 6B
Close - Heat/hot water
Entire building
Dec 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Dec 4, 2025 · Apt 6B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1930
- Floors
- 6
- Residential units
- 79
- Building area
- 67,248 ft²
- Lot area
- 15,538 ft²
- Zoning
- R6
- Community board
- 212
- Council district
- 12
- Block / lot
- 4597 / 21
- Assessed value
- $2,162,250
- Landmark / historic district
- No
HPD registration #204782, last renewed Aug 19, 2025.
Questions about 3230 Cruger Avenue
Who owns 3230 Cruger Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 3230 Cruger Owners Corp.
Does 3230 Cruger Avenue have violations?
Yes. NYC HPD has recorded 2,481 housing violations at this property.
Is 3230 Cruger Avenue rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 1% of its 79 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3230 Cruger Avenue built?
City records list 1930 as the year it was built.
How many apartments are in 3230 Cruger Avenue?
It has 79 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.