roofy

2800 Bronx Park East

Bronx, NY 10467BBL 2-04506-0040Map

Owner of record: Hp Bronx Park East Housing Dvlp Fund Com Pany, INC.

2800 Bronx Park East is a walk-up apartment building built in 1929 in Bronx, 10467. It has 680 residential units across 5 floors. The owner of record is Hp Bronx Park East Housing Dvlp Fund Com Pany, INC.. HPD has recorded 7,198 housing violations here, most recently on October 9, 2026. 50 of the 50 most recent violations are still open. City tax records listed 359 rent-stabilized apartments here in 2024.

HPD violations
7,198
DOB violations
65
ECB violations
59
HPD complaints
8,488

What to know

Concern
10 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 9, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
359
About 53% of the building's 680 apartments
Up from 334 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 7,198

  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt f22, 2nd story, 2nd apartment from north at east

    Oct 9, 2026 · Apt F22

    Open — Violation open
  • B

    Repair the roof so that it will not leak at ceiling and west wall in the foyer located at apt a52, 5th story, 1st apartment from south at west

    Oct 9, 2026 · Apt A52

    Open — Violation open
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the foyer located at apt a52, 5th story, 1st apartment from south at west

    Oct 9, 2026 · Apt A52

    Open — Violation open
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt a52, 5th story, 1st apartment from south at west

    Oct 9, 2026 · Apt A52

    Open — Violation open
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling east wall less than 10 sq ft in the bathroom located at apt a52, 5th story, 1st apartment from south at west

    Oct 9, 2026 · Apt A52

    Open — Violation open
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st room from north located at apt a52, 5th story, 1st apartment from south at west

    Oct 9, 2026 · Apt A52

    Open — Violation open
  • B

    Repair the roof so that it will not leak at ceiling and west wall in the 1st room from north located at apt a52, 5th story, 1st apartment from south at west

    Oct 9, 2026 · Apt A52

    Open — Violation open
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt f22, 2nd story, 2nd apartment from north at east

    Oct 9, 2026 · Apt F22

    Open — Violation open
  • A

    Paint metal in accordance with dept. regulation radatior at east wall in the 3rd room from east located at apt f22, 2nd story, 2nd apartment from north at east

    Oct 9, 2026 · Apt F22

    Open — Violation open
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt f22, 2nd story, 2nd apartment from north at east

    Oct 9, 2026 · Apt F22

    Open — Violation open
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles around bathtub in the bathroom located at apt aa21, 2nd story, 1st apartment from north at east , section ''2858''

    Oct 7, 2026 · Apt AA21

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 4th room from north located at apt x6, 1st apartment from west at north

    Oct 7, 2026 · Apt X6

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the 4th room from north located at apt x6, 1st apartment from west at north

    Oct 7, 2026 · Apt X6

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 4th room from north located at apt x6, 1st apartment from west at north

    Oct 7, 2026 · Apt X6

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and south and east north walls inside closet in the 4th room from north located at apt x6, 1st apartment from west at north

    Oct 7, 2026 · Apt X6

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling north and south east walls inside closet in the 4th room from north located at apt x6, 1st apartment from west at north

    Oct 7, 2026 · Apt X6

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... inside the closet ceiling north and south walls observed less than 10 sq ft of mold in the 4th room from north located at apt x6, 1st apartment from west at north

    Oct 7, 2026 · Apt X6

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective latch and lock at building entrance door

    Oct 6, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance door

    Oct 6, 2026

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt t42, 4th story, 1st apartment from east at south , section ''t2850''

    Oct 6, 2026 · Apt T42

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations the missing in the entire apartment located at apt t42, 4th story, 1st apartment from east at south , section ''t2850''

    Oct 6, 2026 · Apt T42

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules the missing in the entire apartment located at apt t42, 4th story, 1st apartment from east at south , section ''t2850''

    Oct 6, 2026 · Apt T42

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl the flushing apparatus at water closet in the bathroom located at apt t42, 4th story, 1st apartment from east at south , section ''t2850''

    Oct 6, 2026 · Apt T42

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective atound bathtub and water closet in the bathroom located at apt t42, 4th story, 1st apartment from east at south , section ''t2850''

    Oct 6, 2026 · Apt T42

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles (not a cut hazard) in the bathroom located at apt t42, 4th story, 1st apartment from east at south , section ''t2850''

    Oct 6, 2026 · Apt T42

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at riser in the bathroom located at apt t42, 4th story, 1st apartment from east at south , section ''t2850''

    Oct 6, 2026 · Apt T42

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt t42, 4th story, 1st apartment from east at south , section ''t2850''

    Oct 6, 2026 · Apt T42

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from south at west wall in the foyer located at apt r51, 5th story, 1st apartment from north at east

    Oct 3, 2026 · Apt R51

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall, 1st window frame from west at north wall, 1st window frame from north at east wall in the kitchen located at apt r51, 5th story, 1st apartment from north at east

    Oct 3, 2026 · Apt R51

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt k21, 2nd story, 1st apartment from south at west , section ''2817''

    Oct 3, 2026 · Apt K21

    Open — Nov sent out
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceiling fixture in the 1st room from east at south located at apt k21, 2nd story, 1st apartment from south at west , section ''2817''

    Oct 3, 2026 · Apt K21

    Open — Nov sent out
  • A

    Replace with new the missing escutcheon plate at heat riser in the bathroom located at apt k21, 2nd story, 1st apartment from south at west , section ''2817''

    Oct 3, 2026 · Apt K21

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of at ceiling in the bathroom located at apt k21, 2nd story, 1st apartment from south at west , section ''2817''

    Oct 3, 2026 · Apt K21

    Open — Nov sent out
  • B

    Replace the broken or defective wash tub in the bathroom located at apt k21, 2nd story, 1st apartment from south at west , section ''2817''

    Oct 3, 2026 · Apt K21

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt k21, 2nd story, 1st apartment from south at west , section ''2817''

    Oct 3, 2026 · Apt K21

    Open — Nov sent out
  • B

    Repair the broken or defective connection wasteline at sink in the kitchen located at apt r51, 5th story, 1st apartment from north at east

    Oct 3, 2026 · Apt R51

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt r51, 5th story, 1st apartment from north at east

    Oct 3, 2026 · Apt R51

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at east wall, 1st door from east at south wall, south wall in the bathroom located at apt r51, 5th story, 1st apartment from north at east

    Oct 3, 2026 · Apt R51

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt r51, 5th story, 1st apartment from north at east

    Oct 3, 2026 · Apt R51

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the 2nd room from east at south located at apt r51, 5th story, 1st apartment from north at east

    Oct 3, 2026 · Apt R51

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling in the kitchen located at apt r51, 5th story, 1st apartment from north at east

    Oct 3, 2026 · Apt R51

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall in the foyer located at apt r51, 5th story, 1st apartment from north at east

    Oct 3, 2026 · Apt R51

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt r51, 5th story, 1st apartment from north at east

    Oct 3, 2026 · Apt R51

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the kitchen located at apt r51, 5th story, 1st apartment from north at east

    Oct 3, 2026 · Apt R51

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the foyer located at apt r51, 5th story, 1st apartment from north at east

    Oct 3, 2026 · Apt R51

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east at south located at apt k21, 2nd story, 1st apartment from south at west , section ''2817''

    Oct 3, 2026 · Apt K21

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall in the bathroom located at apt r51, 5th story, 1st apartment from north at east

    Oct 3, 2026 · Apt R51

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from south at west wall door frame in the private hallway located at apt r51, 5th story, 1st apartment from north at east

    Oct 3, 2026 · Apt R51

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, east wall in the private hallway located at apt r51, 5th story, 1st apartment from north at east

    Oct 3, 2026 · Apt R51

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at south wall, north wall in the kitchen located at apt r51, 5th story, 1st apartment from north at east

    Oct 3, 2026 · Apt R51

    Open — Nov sent out

DOB building violations · 65

  • Construction other optional

    Failure to maintain building in code compliant manner. observed the following conditions at all view exposures:cracks/step cracks/crack glass pane,missing bricks damaged joints and spalling bricks. remedy: repair and/or replace

    Aug 10, 2026

    Dob violation - active
  • Construction other optional

    Failure to maintain bldg in code compliant.observed at all exposures: loose bricks,bowed lintels,missing bricks,broken glass panel @ entrance door. damaged joints and spalling. note: parapet observed multiple defects. remedy: repair and/or replace

    Aug 10, 2026

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner. observed the following defective conditions at all exposures. cracks,spalled/ spalling missing bricks damaged joints and decorative stones. roof area crack at bulkhead and parapet. remedy: repair and/or replace

    Aug 10, 2026

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code copliant manner. observed the following conditions:exp1 brkn window pane, 5fl loose bricks, damaged joints & bowed lintels. exposure 3 and 4 damaged joints bowed lintels and spalling bricks. remedy: repair and/or replace

    Aug 10, 2026

    Dob violation - active
  • Construction other optional

    Ewo due to imminent hazardous conditions @ exp3 west elev courtyard @ parapet area. crack loose brick with wall movement. remedy: owner to immediately retain nys registered licensed professional to direct, conduct & supervise works in connection w/remov/stabliz of conditions rdp to prov daily field reports to ssmr unit [email protected]

    Aug 10, 2026

    Dob violation - active
  • Construction other optional

    Failure to maintain bldg in code compliant manner. exposure 1 & 3 damaged mortar joints, eroded mortar & parapet. exp#3 n elev eroded mortar joints @ mult locations, loose bricks & coping at parapet; spalling & damaged coping also @ parapet wall. remedy: repair and/or replace all damage facade and appurtances

    Apr 10, 2025

    Dob violation - active
  • Construction other optional

    Failure to maintain bldg in code compliant manner. observed on exps # 1,2,3&4:eroded damaged bricks & mortar joints @ parapet. exposure #4 north elev:broken window pane @ stair well between 3&4 fls; loose bricks;damaged, deteriorated coping stone on parapet. remedy: repair and/or replace

    Apr 10, 2025

    Dob violation - active
  • Construction other optional

    Failure to maintain bldg in code comopliant manner. on exposure #1 at time of inspection: loose bricks, missing bricks, eroding mortar joints at property, missing bricks at window sills at 5th floor remedy: repair and/or replace damaged bricks and mortar joints

    Apr 10, 2025

    Dob violation - active
  • Construction other optional

    Failure to maintain bldg in code compliant manner. exp1 disintegrating coping stone @ bulkhead.eroding mortar joints,dislodge mortar joints @ parapet.exp1 loose tile @ parapet wall,broken window pane 6fl; eroded mortar joints,dislodge coping & mortar joints @ parapet.exp4:remedy/ requirements: repair and/or replace damaged facade

    Apr 10, 2025

    Dob violation - active
  • Construction other optional

    Emergency work order due to hazardous material observed at exposure#4 multiple vertical cracks & step cracks. also spalling damaged motar joints loose spalling stone,loose unsecured brick and roof tile remedy: immediately remove loose hazardous material noted. immediately provide shed/safety measures under dir of licensed professional exp#4

    Oct 17, 2024

    Dob violation - active
Show 40 more ↓
  • Construction other optional

    Failure to maintain building in code compliant manner. note: observed damaged/missing mortar joints and cracks in masonry. at several locations on 1,2,3 observed spalling stone loose brick unsecured brick remedy: repair and/or replace

    Oct 17, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner. at all exposure multiple defects. spalling mortar, missing mortar joints, step crack, verticle cracks, damaged lintels, spalling stone. leaning parapet @ roof multiple cracks & bulkhead damaged/missing roof tile. loose unsecure brick & parapet. remedy: repair and/or replace

    Oct 17, 2024

    Dob violation - active
  • Construction other optional

    Emergency work order due to hazardous materials observed @ exp#2 south elev. at parapet level on the corner of the exposure observed step cracks in brick work. damaged/spalling mortar joints, spalling stone w/loose debris @exp1 maintainance entr/garbage area.remedy:immediately remove loose hazardous material,prov shed/safe meas u/dir of licen pro

    Oct 16, 2024

    Dob violation - active
  • Construction other optional

    Emergency work order due to hazardous conditions @ exposure #3 deteriorating masonry on entire facade, including step cracks vertical cracks bowing lintels.masonry push off shelk angles damage/spalling mortar joints need shed protect meas exp #1.remedy: immediately provid safe meas@exp3 defect cond u/direct of licensed professional@ location

    Oct 16, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner. note: at time of inspection at multiple level of each facade had multiple cracks in facade damage lintels spalling mortar joints displaced bricks damaged parapet walls damaged crack roof tile spalling stone loose bricks cracked window sills. remedy: repair air/or replace

    Oct 16, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner.observed at exposure 1, 3 & 4 multiple areas of different defects such as spalling mortar joint, step cracks brickwork, spalling/damaged lintels, missing damaged =/loose stones. parapet @ roof leaning towards pubilc, loose bricks. missing roof tiles. remedy: repair and/or replace

    Oct 16, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner. observed damaged/missing mortar joints and cracks at masonry at several locations on exposures #(1,2,& 3) (south; west & north elevation) remedy: fix and/or replace

    Jun 20, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner.note deteriora ting masonry on entire facade including step cracks,vertical cracks,bo wing lintels,masonry pushing off shelf angles,damaged mortar joints an d spalled bricks cementing material.remedy: fix and/or replace

    Jun 7, 2024

    Dob violation - active
  • Construction other optional

    Emergency work order due to the hazardous condition.observed deteriora ting masonry on entire facade including step cracks,vertical cracks,bo wing lintels,masonry pushing off shelf angles,damaged mortar joints,sp alled brick and cement material,inadequate a/c support.remedy:provide safety measures at exp1,3,4.fix defective conditions under lic prof

    Jun 7, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner.at the time of inspection,observed at all exposures cracked brick,loose,damaged morta r joints,spalling coping stone at roof level step cracks.these conditi ons are at various different levels of the facade.parapet has loose da maged mortar joint cracks.remedy:repair or replace

    Jun 7, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner.note at time o f inspection,observed throughout the facade,cracks in brick spalling m ortar joints loose bricks that were removed at time of inspection.step cracks,damaged window sill,cracked roof at exp1,3,4.remedy:repair or r eplace

    Jun 7, 2024

    Dob violation - active
  • Construction other optional

    Emergency work order due to hazardous material.observed at exp1 cracks in the facade around 6th fl.at parapet level observed spalling,loose mortar joints,loose bricks and cracks in the bricks where there is no shed in place.remedy:immediately remove loose hazardous material noted provide sws safety measures under direction of a lic professional

    Jun 7, 2024

    Dob violation - active
  • Construction other optional

    Emergency work order due to hazardous material observed at exp1,3 mult iple hazards throughout the facade includes step crack,bulding not sec ure,loose mortar joints,cracked brick observed on fire escape.damaged window sills,lintels bowing,cracked.loose brick was removed from roof during inspection.remedy:remove loose material noted.provide sws

    Jun 7, 2024

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 23, 2017

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2016

    Feb 16, 2017

    Dob violation - dismissed
  • Landmark none

    Landmk-landmark none

    Aug 18, 2015

    Dob violation - active
  • Landmark none

    Landmk-landmark none

    Aug 18, 2015

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 2, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active

ECB violations · 59

  • Class - 2

    Expired shed permit. observed the following side walk shed permit #x0007639-i1-sh expired on 7/07/2026 and no permit posted on data base. remedy: renew permit.

    Aug 10, 2026 · Penalty $1,250

    Active
  • Class - 2

    Expired shed permit. observed the following side walk shed permit #x0106598-i1-sh expired on 07/07/2026 and no permit posted on database. remedy: renew permit.

    Aug 10, 2026 · Penalty $1,250

    Active
  • Class - 2

    Expired shed permit. observed the following side walk shed permit #x0106342-i1-sh expired on 07/07/2026 and no permit posted on database. remedy: renew permit.

    Aug 10, 2026 · Penalty $1,250

    Active
  • Class - 2

    Expired shed permit. observed the following side walk shed permit #x01065752-i1-sh expired on 07/07/2026 and no permit posted on database. remedy: renew permit.

    Aug 10, 2026 · Penalty $1,250

    Active
  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. at times of inspection, no access no certificate of correction on file. failure to certify c

    May 13, 2026 · Penalty $1,250

    Active
  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. at times of inspection, no access no certificate of correction on file. failure to certify c

    May 13, 2026

    Resolve
  • Class - 2

    Observed there is no range hood/vent for the kitchen with stove in apartment # j23(bldg. # 2819)., repair and/or replace

    Jan 30, 2025 · Penalty $310

    Resolve
  • Class - 2

    Observed in apartment # j23(bldg. # 2819) part of the kitchen area was converted into sleeping area with bed, clothing & personal items., discontinue illegal occupancy or amend c of o

    Jan 30, 2025 · Penalty $1,250

    Active
  • Class - 2

    Failure to comply with commissioner's order contained in summons #35662403p issued on 04/11/2023, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert

    Jan 29, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications. mote: at timeof inspection, observed no vertical installed on sidewalk shed where shed was not near facade. remedy: comply with code.

    Oct 17, 2024 · Penalty $2,400

    Resolve
Show 40 more ↓
  • Class - 2

    Pedestrian protection does not meet code specification. note: at time of inspection, observed sidewalk shed in place observed missing cross brace/no vertical netting installed at places where shed in not locate

    Oct 17, 2024 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway. note: at time of inspection, observed multiple fire escape passageway blocked by bricks that fell on fire escape and multiple areas of garbage and flower pots. r

    Oct 16, 2024 · Penalty $312

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications. note: at timeof inspection, observed sidewalk shed in place. observed areas where shed does not touch facade/open areas to walk under hazardous condition

    Oct 16, 2024 · Penalty $2,400

    Active
  • Class - 2

    Sidewalk shed does not meet code specifications code specifications. note at time of inspection, observed shed in place with no safety netting installed around the shed leaving hazard. intall netting where shed

    Jun 7, 2024 · Penalty $2,400

    Resolve
  • Class - 2

    Sidewalk shed does not meet code specifications. note at time of inspection, observed shed in place with no safety netting installed around shed leaving hazard. instal netting where shed is not close to facade

    Jun 7, 2024 · Penalty $2,400

    Resolve
  • Class - 1

    At time of inspection observed apt # u54 and stair bulkhead instate of disrepair conditions with water damaged, paint bubble, cracks and plywood covered on ceiling & wall. also observed water accumulation on ro

    Apr 17, 2024 · Penalty $1,250

    Active
  • Class - 2

    Summons issued for failure to obtain permit prior to installation/ use of sidewalk shed. sidewalk shed permit expired 08/23, obtain a permit

    Dec 12, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain building walls & appurtenances. at time of inspection observed at "arnow ave" exposure masonry facade missing sections of mortar at joints at multiple locations along with steel lintels seve

    May 5, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner. at time of inspection observed at apartment y53 on 5th fl., severe water damage to ceilings & walls with plaster/drywall completely saturated with water. s

    May 5, 2023 · Penalty $1,250

    Active
  • Class - 2

    Project information panel/sidewalk shed parapet panel/construction sign not provided or not in compliance with section.at time of inspection observed sws erected at exp #1 with no prject info panel.project info

    Apr 14, 2023

    Resolve
  • Class - 2

    Project information panel/sidewalk shed parapet panel/construction sign not provided or not in compliance with section.at time of inspection observed sws erected at exp #1 & #4 with no project info panel.projec

    Apr 11, 2023

    Resolve
  • Class - 2

    Bc3309.11 failure to provide tree protection.at time of inspection observed 5 story building with sidewalk shed erected at exp #1 & #4 at exp #1 one tree protruding to sidewalk shed w/o any proper protection as

    Apr 11, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    At time of my inspection of a sidewalk shed at a 6 story occupied building. sidewalk shed is missing parapet panels, missing netting where it doesnt reach to building facade large open area allowing debri to fa

    Mar 27, 2023 · Penalty $625

    Resolve
  • Class - 1

    At time time of inspection observed excessive black bagged debris piled/stored under the fire escape along barker ave which emergency exit partially obstructed to occupants. fire escape drop ladder obstructed b

    Dec 29, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    50a-f. as per class 2 (b254) 28-301.1, failure to maintain. (50a)skimming piping plugged & not pipied down #01 & 02. (50b)hot water coil relief valve drain not piped down #02. (50c)exposed electrical wires & el

    Apr 25, 2018

    Resolve
  • Class - 1

    Failure to maintain bldg in code-compliant manner.observed in cellar condensate return line leaking water and steam.rem:repair/and or replace.photos taken

    Oct 30, 2017 · Penalty $250

    Resolve
  • Class - 2

    Failure to maintain building wall(s) or appurtenances. noted: observed on roof, rear of building at parapet, decorative stone is spalling, cracked and missing pieces/fallen pieces of which some pieces are and h

    Oct 30, 2017 · Penalty $500

    Active
  • Class - 2

    Fail to provide effective electrical continuity for metal raceways. observed throughout hallways installation of 1/2" emt conduits from ceiling lights to emergency wall lights. these conduits are not terminated

    Oct 30, 2017 · Penalty $600

    Resolve
  • Class - 2

    Failure to maintain building wall(s) or appurtenances. noted: at exposures #1 & 3, at parapet wall level, decorative columns have cracked loose and missing bricks. also missing mortar in same area. also at expo

    Oct 30, 2017 · Penalty $500

    Active
  • Class - 2

    Fail to provide effective electrica continuity for metal raceways.observed throughout hallways installation of 1/2 emt conduits frrom ceiling light to emergency wall lights.these conduits are not terminated to

    Oct 30, 2017

    Resolve
  • Class - 2

    Fail to maintain building in code complaint manner re-installation/maintenance of plumbing materials/equipment pc102.3;27-902.observe in cellar fernco sanitary fittings used on the sanitary drainage system at s

    Oct 28, 2017

    Resolve
  • Class - 2

    Failure to maintain builiding in code compliant manner.noted:at cellarlevel,in boiler room,water penetration at ceiling in several locationsleak causing concrete ceiling to crack and spall.one leak directly abo

    Oct 26, 2017

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner:failure to comply with law for drainage system per 702.1;27-911-observed in cellar sanitary waste line with a hole approximatel 1 1/2 inch in diameter leaki

    Oct 26, 2017 · Penalty $250

    Resolve
  • Class - 2

    Fail to maintain building in code compliant manner re: installation/maintenance of plumbing materials/equipment pc 102.3;27-902.observed in cellar fences sanitary fitting used on the sanitary drainage system

    Oct 26, 2017 · Penalty $500

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner:(interior)noted:observed at the roof bulkhead on the verge of falling from the ceiling,bulging on the verge of falling from the ceiling,bulging and spalling

    Oct 26, 2017

    Resolve
  • Class - 1

    Failure to ground electrical conductive materials.oserva t front of building(residential entrance)a full operational sidewalk shed not grounded please know that failure to ground electrical conductive material

    Oct 25, 2017 · Penalty $4,800

    Resolve
  • Class - 1

    Failure to maintain bldg in code-compliant manner.observedon 10/24/17 at above address gas piping throughout basement corroded and in poor condition.rem:repair and or replace.*photos taken*

    Oct 24, 2017 · Penalty $250

    Resolve
  • Class - 2

    Failure to maintain building walls or appurtenances.noted:at expo#1 north-west section,parapet wall leaning inward towards roof also at expo1 parapet wall bricks cracked,loose and missing mortar.rem:maintain bl

    Oct 24, 2017 · Penalty $200

    Active
  • Class - 2

    Failure to maintain bldg in code compliant manner. noted: at bulkhead ceiling cracked & water penetrating. also at cellar level ceiling crack & water penetrating at various locations throughout cellar.

    May 5, 2017 · Penalty $500

    Resolve
  • Class - 2

    Failure to provide power for emergency lighting. noted: at 3rd sty public hall emergency lights not working when tested. remedy: provide adequate power for emergency exit lighting.

    May 5, 2017 · Penalty $250

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. no fire stopping per bc 712.3;27-345. noted: at cellar level openings round plumbing & holes at various locations throughout cellar at ceiling & walls.

    May 5, 2017 · Penalty $500

    Resolve
  • Class - 1

    Fgc408.2/miscellaneous violations:future connections exist on gas.observed in cellar future connections existing on gas piping.rem:comply with code.

    May 5, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. noted: at bulkhead ceiling cracked,plaster spalling & water penetrating. remedy: repair &/or replace conditions noted.

    May 5, 2017 · Penalty $500

    Resolve
  • Class - 2

    Electrical work without a permit.observed ceiling lights,emergency exit and emergency lights installed in halls and basement area.no application on file for above work.

    May 5, 2017 · Penalty $2,000

    Resolve
  • Class - 2

    Failure to maintain building wall(s) or appurtenances. noted: bulkhead at roof level has spalling/loose concrete and also at 5th floor level interior plaster cracked and spalling. remedy:comply with notice of v

    May 9, 2016 · Penalty $530

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. defects noted: 1st floor thru 5th floors atair well/hallway, and landing ceiling spalling and crack at various locations. also 1st floor stair, have cracks

    May 9, 2016 · Penalty $530

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. defects:noted: nulkhead interior plaster crac and spalling. also stair while losse treads. remedy: comply with notice of violation.

    May 9, 2016 · Penalty $530

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner: lack of emergency lighting for exits, exit discharges and public corridors per bc1006.1;27-542. noted: at 2nd floor corridor, inoperative emergency light w

    May 9, 2016 · Penalty $530

    Resolve
  • Class - 2

    Sec. 3314.8 partial swo issued for supported scaffold pursuant 28-207.2 & posted on premises. failed to provide toeboards & guardrails. noted: at time of inspection working levels for supported scaffold at exp2

    Mar 6, 2015

    Resolve
  • Class - 2

    Sidewalk shed parapet sign panel is not provided. noted: at time of inspection sidewalk shed at exp#2 missing parapet sign panel. it must contain. 1)street address of the site. 2)name of the contractor responsi

    Mar 6, 2015

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Oct 8, 2026 · Apt BLDG

    Close
  • Electric

    No lighting

    Oct 8, 2026 · Apt B22

    Open
  • Door/window

    Window pane

    Oct 8, 2026 · Apt 31

    Open
  • Heat/hot water

    Entire building

    Oct 5, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 4, 2026 · Apt V3

    Open
  • Paint/plaster

    Ceiling

    Oct 1, 2026 · Apt Y31

    Close
  • Unsanitary condition

    Mold

    Oct 1, 2026 · Apt X6

    Close
  • Safety

    Carbon monoxide detector

    Sep 30, 2026 · Apt T42

    Close
  • Paint/plaster

    Ceiling

    Sep 30, 2026 · Apt T42

    Close
  • Appliance

    Refrigerator

    Sep 30, 2026 · Apt T42

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    Sep 29, 2026 · Apt A52

    Close
  • Water leak

    Heavy flow

    Sep 29, 2026 · Apt A52

    Close
  • Unsanitary condition

    Mold

    Sep 28, 2026 · Apt A52

    Close
  • Paint/plaster

    Ceiling

    Sep 28, 2026 · Apt A52

    Close
  • Unsanitary condition

    Mold

    Sep 28, 2026 · Apt W31

    Close
  • Electric

    Lighting

    Sep 28, 2026 · Apt Z22

    Open
  • Electric

    Outlet/switch

    Sep 28, 2026 · Apt Z22

    Open
  • Water leak

    Heavy flow

    Sep 27, 2026 · Apt P32

    Open
  • Paint/plaster

    Wall

    Sep 27, 2026 · Apt P32

    Open
  • Plumbing

    Steam pipe/riser

    Sep 27, 2026 · Apt R51

    Close
  • Paint/plaster

    Ceiling

    Sep 27, 2026 · Apt R51

    Close
  • Paint/plaster

    Ceiling

    Sep 25, 2026 · Apt P22

    Close
  • Plumbing

    Bathtub/shower

    Sep 25, 2026 · Apt K21

    Close
  • Paint/plaster

    Ceiling

    Sep 25, 2026 · Apt K21

    Close
  • Unsanitary condition

    Mold

    Sep 25, 2026 · Apt K21

    Close
  • Appliance

    Refrigerator

    Sep 22, 2026 · Apt T42

    Close
  • Paint/plaster

    Ceiling

    Sep 22, 2026 · Apt T42

    Close
  • Door/window

    Door

    Sep 21, 2026 · Apt V1

    Close
  • Door/window

    Door

    Sep 21, 2026 · Apt V1

    Close
  • Plumbing

    Bathtub/shower

    Sep 18, 2026 · Apt V23

    Close
  • Electric

    Wiring

    Sep 18, 2026 · Apt P22

    Close
  • Paint/plaster

    Ceiling

    Sep 18, 2026 · Apt P22

    Close
  • Water leak

    Heavy flow

    Sep 18, 2026 · Apt P32

    Close
  • Plumbing

    Bathtub/shower

    Sep 18, 2026 · Apt P32

    Close
  • Unsanitary condition

    Pests

    Sep 18, 2026 · Apt P32

    Close
  • Unsanitary condition

    Mold

    Sep 18, 2026 · Apt P32

    Close
  • Paint/plaster

    Ceiling

    Sep 18, 2026 · Apt P32

    Close
  • Appliance

    Refrigerator

    Sep 14, 2026 · Apt M21

    Close
  • Unsanitary condition

    Pests

    Sep 13, 2026 · Apt P32

    Close
  • Unsanitary condition

    Mold

    Sep 13, 2026 · Apt P32

    Close
  • Door/window

    Window frame

    Sep 13, 2026 · Apt P32

    Close
  • Plumbing

    Bathtub/shower

    Sep 13, 2026 · Apt P32

    Close
  • Paint/plaster

    Ceiling

    Sep 13, 2026 · Apt P32

    Close
  • Unsanitary condition

    Pests

    Sep 2, 2026 · Apt Z41

    Close
  • Electric

    Outlet/switch

    Sep 2, 2026 · Apt Z41

    Close
  • Unsanitary condition

    Mold

    Sep 2, 2026 · Apt Z41

    Close
  • Water leak

    Damp spot

    Sep 2, 2026 · Apt Z41

    Close
  • Plumbing

    Bathtub/shower

    Sep 2, 2026 · Apt Z41

    Close
  • Water leak

    Slow leak

    Sep 2, 2026 · Apt U31

    Close
  • Flooring/stairs

    Floor

    Sep 1, 2026 · Apt R51

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1929
Floors
5
Residential units
680
Building area
277,000 ft²
Lot area
218,932 ft²
Zoning
R7-1
Community board
211
Council district
12
Block / lot
4506 / 40
Assessed value
$6,030,450
Landmark / historic district
INDIVIDUAL LANDMARK

HPD registration #226254, last renewed Apr 22, 2026.

Questions about 2800 Bronx Park East

Who owns 2800 Bronx Park East?

The owner of record in NYC Department of City Planning PLUTO data is Hp Bronx Park East Housing Dvlp Fund Com Pany, INC..

Does 2800 Bronx Park East have violations?

Yes. NYC HPD has recorded 7,198 housing violations at this property.

Is 2800 Bronx Park East rent stabilized?

NYC Department of Finance tax bills listed 359 rent-stabilized units here in 2024 (about 53% of its 680 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2800 Bronx Park East built?

City records list 1929 as the year it was built.

How many apartments are in 2800 Bronx Park East?

It has 680 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.