2526 Holland Avenue
Bronx, NY 10467BBL 2-04435-0016Map
Owner of record: Jval Holding Corp.
2526 Holland Avenue is a walk-up apartment building built in 2005 in Bronx, 10467. It has 8 residential units across 5 floors. The owner of record is Jval Holding Corp.. HPD has recorded 134 housing violations here, most recently on December 30, 2025. 3 of the 50 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2018.
- HPD violations
- 134
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 156
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 134
- ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Dec 30, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in at wash basin in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Dec 30, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Dec 30, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Dec 30, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchenette located at apt 1a, 1st story, 1st apartment from north at east
Dec 30, 2025 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... greater than 1 sq ft but less than 10 sq ft at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Dec 30, 2025 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Dec 30, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly secure the loose wash basin at north wall in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Dec 30, 2025 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye installed at building entrance door , 1st story
Aug 17, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from east at north located at apt 4a, 4th story, 1st apartment from north at east
Jan 17, 2025 · Apt 4A
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of lockable side bolt lock at door in the entrance located at apt 4a, 4th story, 1st apartment from north at east
Jan 17, 2025 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4a, 4th story, 1st apartment from north at east
Dec 19, 2024 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at 1st public hall bulkhead from east
Dec 19, 2024
Closed — Violation closed - BHazardous
Provide unlockable slide bolt/ hook/ push bar that provides reentry from the roof at 1st public hall bulkhead from east
Dec 19, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 1st apartment from north at east
Dec 19, 2024 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Dec 3, 2024 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system that is missing at public hall, 1st story
Dec 3, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from north located at apt 3b, 3rd story, 1st apartment from east at south
Dec 3, 2024 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Jan 10, 2024 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Jan 10, 2024 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Dec 5, 2023 · Apt 1A
Open — First no access to re- inspect violation - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 1; wg to repair = 0; in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Dec 5, 2023 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Dec 5, 2023 · Apt 1A
Open — First no access to re- inspect violation - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Sep 21, 2023 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Sep 21, 2023 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing door holder at building entrance , 1st story
Sep 21, 2023
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing permanent holding device hook to hold installed at door [street to public hall] at public hall, 1st story
Sep 21, 2023
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Sep 21, 2023 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 1a, 1st story, 1st apartment from north at east
Aug 21, 2023 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Aug 21, 2023 · Apt 1A
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Aug 21, 2023 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub area in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Aug 21, 2023 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective gasket seal on refrigerator door in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Aug 21, 2023 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 30, 2023
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Nov 15, 2022 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Nov 15, 2022 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Nov 15, 2022 · Apt 2B
Closed — Violation closed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling at public hall, 1st story
Nov 15, 2022
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Nov 15, 2022 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Nov 15, 2022 · Apt 2B
Open — Not complied with - CImmediately hazardous
Provide ready access to buildings heating system door locked cellar at boiler room
Nov 15, 2022
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective adjust hinges in the entrance located at apt 1a, 1st story, 1st apartment from north at east
Oct 26, 2022 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 1a, 1st story, 1st apartment from north at east
Oct 26, 2022 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 1a, 1st story, 1st apartment from north at east
Oct 26, 2022 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective connection waste line drain pipe at wash basin in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Oct 11, 2022 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Oct 11, 2022 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlet at south wall in the kitchen located at apt 2b, 2nd story, 1st apartment from east at south
Oct 11, 2022 · Apt 2B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all ceilings in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Oct 11, 2022 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at window casing at south wall in the 1st room from east located at apt 2b, 2nd story, 1st apartment from east at south
Oct 11, 2022 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at window casing at south wall in the 1st room from east located at apt 2b, 2nd story, 1st apartment from east at south
Oct 11, 2022 · Apt 2B
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Apartment only
Oct 15, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Jul 15, 2026 · Apt 3B
Close - Plumbing
Toilet
May 14, 2026 · Apt 4B
Close - Flooring/stairs
Floor
May 14, 2026 · Apt 4B
Close - Door/window
Door
May 14, 2026 · Apt 4B
Close - Paint/plaster
Wall
May 14, 2026 · Apt 4B
Close - Flooring/stairs
Floor
May 14, 2026 · Apt 4B
Close - General
Bell/buzzer/intercom
May 14, 2026 · Apt 4B
Close - Plumbing
Toilet
May 6, 2026 · Apt 4B
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt 1A
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Dec 27, 2025 · Apt 1A
Close - Flooring/stairs
Floor
Sep 20, 2025 · Apt 4A
Close - Door/window
Door
Aug 20, 2025 · Apt 4A
Close - Paint/plaster
Ceiling
Aug 20, 2025 · Apt 4A
Close - Plumbing
Toilet
Aug 19, 2025 · Apt 4A
Close - Paint/plaster
Ceiling
Aug 19, 2025 · Apt 4A
Close - General
Cabinet
Aug 19, 2025 · Apt 4A
Close - Plumbing
Water supply
Aug 19, 2025 · Apt 4A
Close - Plumbing
Basin/sink
Aug 19, 2025 · Apt 4A
Close - Unsanitary condition
Pests
Jul 9, 2025 · Apt 3A
Close - Plumbing
Toilet
Jul 9, 2025 · Apt 3A
Close - Water leak
Slow leak
Jul 9, 2025 · Apt 3A
Close - Plumbing
Water supply
Jul 9, 2025 · Apt 3A
Close - Paint/plaster
Ceiling
Jul 9, 2025 · Apt 3A
Close - General
Cabinet
Jul 9, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Dec 2, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2024 · Apt BLDG
Close - Water leak
Heavy flow
Nov 19, 2024 · Apt 3B
Close - Safety
Window guard broken/missing
Aug 11, 2023 · Apt 1A
Close - Appliance
Electric/gas range
Aug 11, 2023 · Apt 1A
Close - Door/window
Door
Aug 11, 2023 · Apt 1A
Close - Appliance
Refrigerator
Aug 11, 2023 · Apt 1A
Close - Heat/hot water
Apartment only
Nov 14, 2022 · Apt 2B
Close - Plumbing
Basin/sink
Oct 23, 2022 · Apt 1A
Close - Water leak
Heavy flow
Oct 23, 2022 · Apt 1A
Close - Electric
Outlet/switch
Oct 2, 2022 · Apt 2B
Close - Paint/plaster
Ceiling
Oct 2, 2022 · Apt 2B
Close - Paint/plaster
Ceiling
Oct 2, 2022 · Apt 2B
Close - Appliance
Electric/gas range
Oct 2, 2022 · Apt 2B
Close - Paint/plaster
Wall
Oct 2, 2022 · Apt 2B
Close - Plumbing
Toilet
Oct 2, 2022 · Apt 2B
Close - Heat/hot water
Apartment only
Oct 2, 2022 · Apt 2B
Close - Heat/hot water
Entire building
Mar 14, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 12, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 10, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2022 · Apt BLDG
Close - Paint/plaster
Window/frame
Jan 10, 2022 · Apt 2B
Close - Plumbing
Toilet
Jan 10, 2022 · Apt 2B
Close - Appliance
Electric/gas range
Jan 10, 2022 · Apt 2B
Close - Paint/plaster
Ceiling
Jan 10, 2022 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2005
- Floors
- 5
- Residential units
- 8
- Building area
- 8,500 ft²
- Lot area
- 4,097 ft²
- Zoning
- R6
- Community board
- 211
- Council district
- 13
- Block / lot
- 4435 / 16
- Assessed value
- $510,750
- Landmark / historic district
- No
HPD registration #224325, last renewed Jun 29, 2026.
Questions about 2526 Holland Avenue
Who owns 2526 Holland Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Jval Holding Corp..
Does 2526 Holland Avenue have violations?
Yes. NYC HPD has recorded 134 housing violations at this property.
Is 2526 Holland Avenue rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2018 (about 100% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2526 Holland Avenue built?
City records list 2005 as the year it was built.
How many apartments are in 2526 Holland Avenue?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.